X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434020707000

Well Details

Well ID: 0434020707000
Loading map...
Location: 00/07-07-043-02W4/0
Location Alias: 00/07-07-43-02 W4M
Location Alias 2: 00/07-07-043-02 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 02
Section: 07
County/Municipality: Municipal District of Wainwright No. 61
Well Name: TALISMAN 7B CHAUVS 7-7-43-2
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0255259
License Date: 2001-05-22
License Status: Amended
Spud Date: 2001-06-29
Final Drill Date: 2001-07-02
Well Total Depth: 711.00 m
Surface Hole Latitude: 52.689144
Surface Hole Longitude: -110.281603

For data sources see[1][2]

Well History

Date Event
2001-05-22 Obtained License
2001-06-29 Surface Casing Operation Performed
2001-06-30 Direction Drilling Operation Performed - Deviate
2001-07-02 Finished Drilling
2001-07-02 Production Casing Operation Performed
2001-07-02 Rig Released
2001-07-02 Well Log Performed
2001-07-02 Well Mode changed to Drilled and Cased
2001-07-18 Well Log Performed
2001-07-24 Perforation Treatment Performed - Jet Perforation
2001-07-24 Well Log Performed
2001-07-28 Perforation Treatment Performed - Fractured
2001-08-22 Well Began Production
2001-08-22 Well Fluid changed to Crude Oil
2001-08-22 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-06-30 217.30 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-07-24 Perforation 695.50 697.00 14
2001-07-28 Fracture 670.50 672.00 0
2001-07-24 Perforation 683.00 687.00 14
2001-07-24 Perforation 679.80 681.50 14
2001-07-24 Perforation 676.00 677.00 14
2001-07-24 Perforation 670.50 672.00 14
2001-07-28 Fracture 695.50 697.00 0
2001-07-28 Fracture 683.00 687.00 0
2001-07-28 Fracture 679.80 681.50 0
2001-07-28 Fracture 676.00 677.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 2518 0.0 0.0 0.0
2002 3603 0.0 0.0 0.0
2003 8422 0.0 0.0 0.0
2004 8338 0.0 0.0 0.0
2005 7975 0.0 0.0 0.0
2006 8068 0.0 0.0 0.0
2007 8613 0.0 0.0 0.0
2008 8672 0.0 0.0 0.0
2009 8405 0.0 0.0 0.0
2010 8429 0.0 0.0 0.0
2011 8393 0.0 0.0 0.0
2012 8623 0.0 0.0 0.0
2013 8631 0.0 0.0 0.0
2014 8148 0.0 0.0 0.0
2015 8350 0.0 0.0 0.0
2016 8344 0.0 0.0 0.0
2017 6314 0.0 0.0 0.0
2018 8429 0.0 0.0 0.0
2019 8574 0.0 0.0 0.0
2020 2154 0.0 0.0 0.0

For data sources see[6]

References