X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434020408000

Well Details

Well ID: 0434020408000
Loading map...
Location: 00/08-04-043-02W4/0
Location Alias: 00/08-04-43-02 W4M
Location Alias 2: 00/08-04-043-02 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 02
Section: 04
County/Municipality: Municipal District of Wainwright No. 61
Well Name: TRIAD CHAUVS 8-4-43-2
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0036923
License Date: 1969-09-23
License Status: Suspension
Spud Date: 1969-09-27
Final Drill Date: 1969-09-30
Well Total Depth: 723.90 m
Surface Hole Latitude: 52.673775
Surface Hole Longitude: -110.224903

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-09-23 Obtained License
1969-09-30 Finished Drilling
1969-09-30 Well Mode changed to Drilled and Cased
1969-10-01 Drill Stem Test Performed
1969-10-02 Drill Stem Test Performed
1969-10-03 Production Casing Operation Performed
1969-10-14 Perforation Treatment Performed - Jet Perforation
1969-10-16 Well Began Production
1969-10-16 Well Fluid changed to Crude Oil
1969-10-16 Well Mode changed to Flowing
1970-07-07 Perforation Treatment Performed - Jet Perforation
1970-07-27 Perforation Treatment Performed - Jet Perforation
1970-07-30 Well Fluid changed to Crude Oil
1970-07-30 Well Mode changed to Pumping
1970-08-02 Well Fluid changed to Crude Oil
1970-08-02 Well Mode changed to Suspended
1984-10-30 Perforation Treatment Performed - Cement Squeeze
1984-11-03 Perforation Treatment Performed - Jet Perforation
1984-11-14 Well Fluid changed to Crude Oil
1984-11-14 Well Mode changed to Pumping
2017-05-15 Well Fluid changed to Crude Oil
2017-05-15 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-10-14 Perforation 698.00 700.40 7
1970-07-07 Perforation 671.80 672.40 7
1970-07-27 Perforation 675.40 677.30 7
1984-10-30 Cement Squeeze 671.80 700.40 0
1984-11-03 Perforation 698.00 700.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 1288 0.0 0.0 0.0
1970 3284 0.0 0.0 0.0
1984 744 0.0 0.0 0.0
1985 8029 0.0 0.0 0.0
1986 8683 0.0 0.0 0.0
1987 8207 0.0 0.0 0.0
1988 8125 0.0 0.0 0.0
1989 8747 0.0 0.0 0.0
1990 8759 0.0 0.0 0.0
1991 8663 0.0 0.0 0.0
1992 8233 0.0 0.0 0.0
1993 8631 0.0 0.0 0.0
1994 8364 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 7487 0.0 0.0 0.0
1997 7991 0.0 0.0 0.0
1998 7806 0.0 0.0 0.0
1999 8580 0.0 0.0 0.0
2000 8499 0.0 0.0 0.0
2001 8571 0.0 0.0 0.0
2002 8332 0.0 0.0 0.0
2003 8119 0.0 0.0 0.0
2004 8411 0.0 0.0 0.0
2005 7986 0.0 0.0 0.0
2006 8608 0.0 0.0 0.0
2007 8274 0.0 0.0 0.0
2008 8382 0.0 0.0 0.0
2009 8305 0.0 0.0 0.0
2010 7780 0.0 0.0 0.0
2011 8021 0.0 0.0 0.0
2012 8391 0.0 0.0 0.0
2013 8694 0.0 0.0 0.0
2014 8672 0.0 0.0 0.0
2015 8747 0.0 0.0 0.0
2016 8275 0.0 0.0 0.0

For data sources see[5]

References