X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434020215D00

Well Details

Well ID: 0434020215D00
Loading map...
Location: D0/15-02-043-02W4/0
Location Alias: D0/15-02-43-02 W4M
Location Alias 2: D0/15-02-043-02 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 02
Section: 02
County/Municipality: Municipal District of Wainwright No. 61
Well Name: TALISMAN 15D CHAUVS 15-2-43-2
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0177271
License Date: 1995-04-04
License Status: Amended
Spud Date: 1995-06-09
Final Drill Date: 1995-06-10
Well Total Depth: 677.00 m
Surface Hole Latitude: 52.682713
Surface Hole Longitude: -110.181123

For data sources see[1][2]

Well History

Date Event
1995-04-04 Obtained License
1995-06-09 Surface Casing Operation Performed
1995-06-10 Finished Drilling
1995-06-10 Well Mode changed to Drilled and Cased
1995-06-11 Production Casing Operation Performed
1995-06-11 Rig Released
1995-06-11 Well Log Performed
1995-06-16 Perforation Treatment Performed - Jet Perforation
1995-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-07-08 Well Log Performed
1995-07-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-07-16 Perforation Treatment Performed - Jet Perforation
1995-07-16 Plug Back Performed
1995-07-20 Well Began Production
1995-07-20 Well Fluid changed to Crude Oil
1995-07-20 Well Mode changed to Pumping
1996-08-14 Perforation Treatment Performed - Jet Perforation
1996-08-14 Well Log Performed
1996-08-20 Perforation Treatment Performed - Fractured
2019-07-09 Well Log Performed
2019-08-25 Well Log Performed
2019-08-27 Perforation Treatment Performed - Jet Perforation
2019-08-27 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-06-16 Perforation 652.50 654.50 13
2019-08-27 Perforation 5.30 6.30 1
2019-08-27 Remedial Casing Cementing 5.30 6.30 0
1995-06-22 Acid Treatment 652.50 654.50 0
1995-07-05 Acid Treatment 652.50 654.50 0
1995-07-16 Packing Device Capped w/Cement 642.00 650.00 0
1995-07-16 Perforation 612.60 615.00 13
1995-07-16 Perforation 617.00 618.00 13
1995-07-16 Perforation 618.50 619.80 13
1996-08-14 Perforation 644.00 646.00 13
1996-08-20 Fracture 644.00 646.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 3952 0.0 0.0 0.0
1996 7940 0.0 0.0 0.0
1997 7013 0.0 0.0 0.0
1998 7938 0.0 0.0 0.0
1999 8629 0.0 0.0 0.0
2000 8566 0.0 0.0 0.0
2001 8414 0.0 0.0 0.0
2002 4787 0.0 0.0 0.0
2003 6410 0.0 0.0 0.0
2004 8339 0.0 0.0 0.0
2005 8151 0.0 0.0 0.0
2006 7801 0.0 0.0 0.0
2007 8513 0.0 0.0 0.0
2008 8010 0.0 0.0 0.0
2009 8266 0.0 0.0 0.0
2010 8558 0.0 0.0 0.0
2011 8536 0.0 0.0 0.0
2012 8738 0.0 0.0 0.0
2013 8741 0.0 0.0 0.0
2014 8632 0.0 0.0 0.0
2015 8723 0.0 0.0 0.0
2016 8630 0.0 0.0 0.0
2017 8470 0.0 0.0 0.0
2018 8573 0.0 0.0 0.0
2019 6935 0.0 0.0 0.0
2020 2056 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-09-05 No Incident Encountered 0.00 0.00

For data sources see[6]

References