If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0434020211020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.677549,"lon":-110.187619,"icon":""}]} |
Location: 02/11-02-043-02W4/0 | |
Location Alias: 02/11-02-43-02 W4M | |
Location Alias 2: 02/11-02-043-02 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 4 | |
Range: 02 | |
Section: 02 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: BP CHAUVIN SOUTH 11-2LD-43-2 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0114482 | |
License Date: 1985-05-08 | |
License Status: Issued | |
Spud Date: 1985-05-30 | |
Final Drill Date: 1985-06-01 | |
Well Total Depth: 673.30 m | |
Surface Hole Latitude: 52.677549 | |
Surface Hole Longitude: -110.187619 |
Date | Event |
---|---|
1985-05-08 | Obtained License |
1985-05-31 | Surface Casing Operation Performed |
1985-06-01 | Finished Drilling |
1985-06-01 | Well Mode changed to Drilled and Cased |
1985-06-02 | Production Casing Operation Performed |
1985-06-02 | Rig Released |
1985-06-02 | Well Log Performed |
1985-07-28 | Perforation Treatment Performed - Jet Perforation |
1985-07-30 | Perforation Treatment Performed - Cement Squeeze |
1985-08-02 | Well Began Production |
1985-08-02 | Well Fluid changed to Crude Oil |
1985-08-02 | Well Mode changed to Flowing |
1985-08-24 | Perforation Treatment Performed - Jet Perforation |
1985-08-26 | Perforation Treatment Performed - Jet Perforation |
1986-06-11 | Well Fluid changed to Crude Oil |
1986-06-11 | Well Mode changed to Suspended |
1986-09-12 | Perforation Treatment Performed - Cement Squeeze |
1986-09-12 | Plug Back Performed |
1986-09-12 | Well Fluid changed to Crude Oil |
1986-09-12 | Well Mode changed to Abandoned Zone |
1986-09-15 | Perforation Treatment Performed - Jet Perforation |
1986-09-17 | Perforation Treatment Performed - Fractured |
1987-06-24 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1985-07-28 | Perforation | 655.00 | 655.50 | 13 |
1986-09-17 | Fracture | 643.00 | 648.50 | 0 |
1987-06-24 | Perforation | 613.50 | 615.50 | 13 |
1987-06-24 | Perforation | 616.80 | 619.00 | 13 |
1987-06-24 | Perforation | 620.50 | 623.50 | 13 |
1985-07-28 | Perforation | 659.50 | 660.00 | 13 |
1985-07-30 | Cement Squeeze | 655.00 | 660.00 | 0 |
1985-08-24 | Perforation | 657.00 | 659.50 | 13 |
1985-08-26 | Perforation | 655.00 | 656.00 | 13 |
1986-09-12 | Cement Squeeze | 655.00 | 659.50 | 0 |
1986-09-15 | Perforation | 645.50 | 648.50 | 13 |
1986-09-15 | Perforation | 645.50 | 648.50 | 13 |
1986-09-15 | Perforation | 643.00 | 645.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1985 | 2303 | 0.0 | 0.0 | 0.0 |
1986 | 3941 | 0.0 | 0.0 | 0.0 |
For data sources see[5]