If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0434020210032 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.677629,"lon":-110.182137,"icon":""}]} |
Location: 03/10-02-043-02W4/2 | |
Location Alias: 03/10-02-43-02 W4M | |
Location Alias 2: 03/10-02-043-02 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 4 | |
Range: 02 | |
Section: 02 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: BP CHAUVIN SOUTH 10-2L-43-2 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0123416 | |
License Date: 1986-07-07 | |
License Status: Suspension | |
Spud Date: 1986-07-12 | |
Final Drill Date: 1986-07-14 | |
Well Total Depth: 649.00 m | |
Surface Hole Latitude: 52.677629 | |
Surface Hole Longitude: -110.182137 |
Date | Event |
---|---|
1986-07-07 | Obtained License |
1986-07-13 | Surface Casing Operation Performed |
1986-07-14 | Finished Drilling |
1986-07-14 | Well Mode changed to Drilled and Cased |
1986-07-15 | Production Casing Operation Performed |
1986-07-15 | Rig Released |
1986-08-27 | Well Log Performed |
1986-09-04 | Perforation Treatment Performed - Open-Hole Completion |
1986-09-04 | Well Log Performed |
1993-12-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-12-11 | Plug Back Performed |
1993-12-12 | Perforation Treatment Performed - Jet Perforation |
1993-12-13 | Perforation Treatment Performed - Jet Perforation |
1994-01-24 | Well Began Production |
1994-01-24 | Well Fluid changed to Gas |
1994-01-24 | Well Mode changed to Flowing |
2015-04-14 | Well Fluid changed to Gas |
2015-04-14 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1986-09-04 | Open Hole/Barefoot Completion | 643.00 | 649.00 | 0 |
1993-12-11 | Packing Device Capped w/Cement | 627.00 | 635.00 | 0 |
1993-12-12 | Perforation | 563.40 | 565.00 | 17 |
1993-12-13 | Perforation | 560.00 | 561.50 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 7995 | 0.0 | 0.0 | 0.0 |
1995 | 8089 | 0.0 | 0.0 | 0.0 |
1996 | 8779 | 0.0 | 0.0 | 0.0 |
1997 | 8657 | 0.0 | 0.0 | 0.0 |
1998 | 8701 | 0.0 | 0.0 | 0.0 |
1999 | 8580 | 0.0 | 0.0 | 0.0 |
2000 | 8783 | 0.0 | 0.0 | 0.0 |
2001 | 8711 | 0.0 | 0.0 | 0.0 |
2002 | 8705 | 0.0 | 0.0 | 0.0 |
2003 | 8456 | 0.0 | 0.0 | 0.0 |
2004 | 8632 | 0.0 | 0.0 | 0.0 |
2005 | 8575 | 0.0 | 0.0 | 0.0 |
2006 | 8540 | 0.0 | 0.0 | 0.0 |
2007 | 8504 | 0.0 | 0.0 | 0.0 |
2008 | 8602 | 0.0 | 0.0 | 0.0 |
2009 | 8609 | 0.0 | 0.0 | 0.0 |
2010 | 7405 | 0.0 | 0.0 | 0.0 |
2011 | 7063 | 0.0 | 0.0 | 0.0 |
2012 | 7214 | 0.0 | 0.0 | 0.0 |
For data sources see[5]