If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0434020203060 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.669223,"lon":-110.166871,"icon":""}]} |
| Location: 06/03-02-043-02W4/0 | |
| Location Alias: 06/03-02-43-02 W4M | |
| Location Alias 2: 06/03-02-043-02 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 043 | |
| Meridian: 4 | |
| Range: 02 | |
| Section: 02 | |
| County/Municipality: Municipal District of Wainwright No. 61 | |
| Well Name: TALISMAN HZ 3A3 CHAUVINS 3-2-43-2 | |
| Operator Name: Repsol Oil & Gas Canada Inc. | |
| License Number: 0427421 | |
| License Date: 2010-12-09 | |
| License Status: Issued | |
| Spud Date: 2011-02-18 | |
| Final Drill Date: 2011-02-22 | |
| Well Total Depth: 1819.00 m | |
| Surface Hole Latitude: 52.669223 | |
| Surface Hole Longitude: -110.166871 |
| Date | Event |
|---|---|
| 2010-12-09 | Obtained License |
| 2011-02-18 | Surface Casing Operation Performed |
| 2011-02-19 | Direction Drilling Operation Performed - Horizontal |
| 2011-02-19 | Well Log Performed |
| 2011-02-20 | Intermediate Casing Operation Performed |
| 2011-02-20 | Well Log Performed |
| 2011-02-21 | Well Log Performed |
| 2011-02-22 | Finished Drilling |
| 2011-02-22 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-02-22 | Well Log Performed |
| 2011-02-22 | Well Mode changed to Drilled and Cased |
| 2011-02-23 | Liner Casing Operation Performed |
| 2011-02-23 | Rig Released |
| 2011-02-27 | Well Log Performed |
| 2011-03-26 | Well Began Production |
| 2011-03-26 | Well Fluid changed to Crude Oil |
| 2011-03-26 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-02-19 | 359.60 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-02-22 | Open Hole/Barefoot Completion | 1195.00 | 1819.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 6588 | 0.0 | 0.0 | 0.0 |
| 2012 | 8753 | 0.0 | 0.0 | 0.0 |
| 2013 | 8743 | 0.0 | 0.0 | 0.0 |
| 2014 | 8464 | 0.0 | 0.0 | 0.0 |
| 2015 | 8574 | 0.0 | 0.0 | 0.0 |
| 2016 | 7913 | 0.0 | 0.0 | 0.0 |
| 2017 | 8502 | 0.0 | 0.0 | 0.0 |
| 2018 | 7458 | 0.0 | 0.0 | 0.0 |
| 2019 | 7718 | 0.0 | 0.0 | 0.0 |
| 2020 | 2180 | 0.0 | 0.0 | 0.0 |
For data sources see[6]