X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434020203000

Well Details

Well ID: 0434020203000
Loading map...
Location: 00/03-02-043-02W4/0
Location Alias: 00/03-02-43-02 W4M
Location Alias 2: 00/03-02-043-02 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 02
Section: 02
County/Municipality: Municipal District of Wainwright No. 61
Well Name: TALISMAN CHAUVS 3A-2-43-2
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0064001
License Date: 1977-05-27
License Status: Abandoned
Spud Date: 1977-06-16
Final Drill Date: 1977-06-18
Well Total Depth: 652.30 m
Surface Hole Latitude: 52.669803
Surface Hole Longitude: -110.188195

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-05-27 Obtained License
1977-06-18 Finished Drilling
1977-06-18 Well Mode changed to Drilled and Cased
1977-06-19 Production Casing Operation Performed
1977-07-11 Well Began Production
1977-07-11 Well Fluid changed to Crude Oil
1977-07-11 Well Mode changed to Pumping
1978-07-11 Perforation Treatment Performed - Jet Perforation
1986-11-04 Perforation Treatment Performed - Jet Perforation
1992-06-30 Well Fluid changed to Crude Oil
1992-06-30 Well Mode changed to Suspended
2007-09-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-09-15 Plug Back Performed
2007-09-15 Well Fluid changed to Crude Oil
2007-09-15 Well Log Performed
2007-09-15 Well Mode changed to Abandoned Zone
2007-09-17 Well Log Performed
2008-03-19 Perforation Treatment Performed - Jet Perforation
2008-03-20 Perforation Treatment Performed - Cement Plug
2008-03-20 Plug Back Performed
2008-03-28 Perforation Treatment Performed - Cement Plug
2008-10-27 Perforation Treatment Performed - Cement Plug
2008-10-27 Perforation Treatment Performed - Jet Perforation
2008-11-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-11-04 Perforation Treatment Performed - Jet Perforation
2008-11-08 Perforation Treatment Performed - Cement Plug
2014-03-26 Perforation Treatment Performed - Jet Perforation
2014-03-30 Perforation Treatment Performed - Cement Plug
2014-03-30 Plug Back Performed
2015-05-25 Perforation Treatment Performed - Abrasa-Jet Perforation
2015-05-26 Perforation Treatment Performed - Cement Plug
2015-05-26 Perforation Treatment Performed - Remedial Casing
2015-05-26 Plug Back Performed
2016-01-28 Perforation Treatment Performed - Jet Perforation
2016-01-28 Well Log Performed
2016-01-29 Perforation Treatment Performed - Remedial Casing
2016-05-10 Perforation Treatment Performed - Jet Perforation
2016-05-10 Well Log Performed
2016-05-11 Perforation Treatment Performed - Cement Plug
2016-05-11 Perforation Treatment Performed - Remedial Casing
2016-05-11 Plug Back Performed
2016-09-10 Perforation Treatment Performed - Cement Plug
2016-09-10 Perforation Treatment Performed - Jet Perforation
2016-09-10 Perforation Treatment Performed - Remedial Casing
2016-09-10 Plug Back Performed
2016-09-10 Well Log Performed
2016-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-09-27 Plug Back Performed
2016-09-27 Well Log Performed
2016-09-29 Well Abandoned
2016-09-29 Well Fluid changed to Crude Oil
2016-09-29 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-07-11 Perforation 619.40 620.60 13
2008-10-27 Cement Plug 564.00 610.00 0
2008-11-03 Packing Device Capped w/Cement 547.00 555.00 0
2008-11-03 Packing Device Capped w/Cement 547.00 555.00 0
2008-11-04 Perforation 477.00 482.00 1
2008-11-08 Cement Plug 455.00 480.60 0
2014-03-26 Perforation 477.00 482.00 1
2014-03-30 Cement Plug 404.00 482.00 0
2015-05-25 Hydra Jet Perforation 318.00 318.50 0
2015-05-25 Hydra Jet Perforation 317.00 317.50 0
2015-05-26 Remedial Casing Cementing 318.00 318.50 0
1986-11-04 Perforation 606.50 609.50 13
2015-05-26 Remedial Casing Cementing 317.00 317.50 0
2015-05-26 Cement Plug 290.00 318.50 0
2016-01-28 Perforation 228.00 230.00 17
2016-01-29 Remedial Casing Cementing 228.00 230.00 0
2016-05-10 Perforation 263.00 264.30 14
2016-05-11 Remedial Casing Cementing 263.00 264.30 0
2016-05-11 Cement Plug 213.00 281.00 0
2016-09-10 Perforation 314.50 315.80 13
2016-09-10 Remedial Casing Cementing 314.50 315.80 0
2016-09-10 Cement Plug 287.00 335.00 0
1986-11-04 Perforation 619.40 621.90 13
2016-09-27 Packing Device Capped w/Cement 212.00 220.00 0
2007-09-15 Packing Device Capped w/Cement 593.00 601.80 0
2008-03-19 Perforation 606.50 609.50 17
2008-03-19 Perforation 619.40 620.60 17
2008-03-20 Cement Plug 584.00 632.00 0
2008-03-28 Cement Plug 533.00 584.00 0
2008-10-27 Perforation 605.00 610.00 1

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 2332 0.0 0.0 0.0
1978 7632 0.0 0.0 0.0
1979 7220 0.0 0.0 0.0
1980 8568 0.0 0.0 0.0
1981 8735 0.0 0.0 0.0
1982 8759 0.0 0.0 0.0
1983 8087 0.0 0.0 0.0
1984 8417 0.0 0.0 0.0
1985 7369 0.0 0.0 0.0
1986 7334 0.0 0.0 0.0
1987 7956 0.0 0.0 0.0
1988 5360 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-03-31 No Incident Encountered 0.00 0.00
2015-05-27 No Incident Encountered 0.00 0.00
2016-02-01 No Incident Encountered 0.00 0.00
2016-05-12 No Incident Encountered 0.00 0.00
2016-09-11 No Incident Encountered 0.00 0.00
2016-09-27 No Incident Encountered 0.00 0.00

For data sources see[6]

References