X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434020107030

Well Details

Well ID: 0434020107030
Loading map...
Location: 03/07-01-043-02W4/0
Location Alias: 03/07-01-43-02 W4M
Location Alias 2: 03/07-01-043-02 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 02
Section: 01
County/Municipality: Municipal District of Wainwright No. 61
Well Name: TALISMAN 7C HZ CHAUVS 7-1-43-2
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0200493
License Date: 1997-04-21
License Status: Suspension
Spud Date: 1997-04-21
Final Drill Date: 1997-04-27
Well Total Depth: 1155.00 m
Surface Hole Latitude: 52.670107
Surface Hole Longitude: -110.160041

For data sources see[1][2]

Well History

Date Event
1997-04-21 Obtained License
1997-04-22 Direction Drilling Operation Performed - Horizontal
1997-04-22 Surface Casing Operation Performed
1997-04-25 Intermediate Casing Operation Performed
1997-04-27 Finished Drilling
1997-04-27 Liner Casing Operation Performed
1997-04-27 Perforation Treatment Performed - Slotted Liner or Casing
1997-04-27 Well Mode changed to Drilled and Cased
1997-04-28 Rig Released
1997-04-29 Well Log Performed
1997-05-07 Well Began Production
1997-05-07 Well Fluid changed to Crude Oil
1997-05-07 Well Mode changed to Pumping
1997-11-30 Well Fluid changed to Crude Oil
1997-11-30 Well Mode changed to Suspended
2003-02-22 Well Fluid changed to Crude Oil
2003-02-22 Well Mode changed to Pumping
2016-08-29 Well Fluid changed to Crude Oil
2016-08-29 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-04-22 203.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-04-27 Slotted Liner 825.00 1154.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 4780 0.0 0.0 0.0
2003 6368 0.0 0.0 0.0
2004 7617 0.0 0.0 0.0
2005 8220 0.0 0.0 0.0
2006 7705 0.0 0.0 0.0
2007 8191 0.0 0.0 0.0
2008 7562 0.0 0.0 0.0
2009 7994 0.0 0.0 0.0
2010 8179 0.0 0.0 0.0
2011 8063 0.0 0.0 0.0
2012 8248 0.0 0.0 0.0
2013 6886 0.0 0.0 0.0
2014 7149 0.0 0.0 0.0
2015 7974 0.0 0.0 0.0
2016 1312 0.0 0.0 0.0

For data sources see[6]

References