X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434020102B00

Well Details

Well ID: 0434020102B00
Loading map...
Location: B0/02-01-043-02W4/0
Location Alias: B0/02-01-43-02 W4M
Location Alias 2: B0/02-01-043-02 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 02
Section: 01
County/Municipality: Municipal District of Wainwright No. 61
Well Name: TALISMAN ET AL CHAUVS 2B-1-43-2
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0137589
License Date: 1988-12-09
License Status: RecCertified
Spud Date: 1988-12-18
Final Drill Date: 1988-12-20
Well Total Depth: 657.00 m
Surface Hole Latitude: 52.668438
Surface Hole Longitude: -110.159811

For data sources see[1][2]

Well History

Date Event
1988-12-09 Obtained License
1988-12-19 Surface Casing Operation Performed
1988-12-20 Finished Drilling
1988-12-20 Production Casing Operation Performed
1988-12-20 Rig Released
1988-12-20 Well Mode changed to Drilled and Cased
1988-12-22 Well Log Performed
1988-12-29 Perforation Treatment Performed - Jet Perforation
1988-12-29 Well Log Performed
1989-02-23 Well Began Production
1989-02-23 Well Fluid changed to Crude Oil
1989-02-23 Well Mode changed to Pumping
1994-01-25 Perforation Treatment Performed - Chemical Squeeze
1994-01-25 Perforation Treatment Performed - Jet Perforation
1998-11-30 Well Fluid changed to Crude Oil
1998-11-30 Well Mode changed to Suspended
2000-05-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-05-30 Perforation Treatment Performed - Jet Perforation
2000-05-30 Plug Back Performed
2000-05-30 Well Fluid changed to Crude Oil
2000-05-30 Well Log Performed
2000-05-30 Well Mode changed to Abandoned Zone
2000-06-01 Perforation Treatment Performed - Fractured
2010-09-16 Perforation Treatment Performed - Cement Plug
2010-09-16 Plug Back Performed
2014-05-06 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-12-29 Perforation 646.00 647.00 13
1994-01-25 Perforation 647.00 652.00 13
1994-01-25 Chemical Squeeze 646.00 652.00 0
2000-05-30 Packing Device Capped w/Cement 635.00 643.00 0
2000-05-30 Perforation 623.00 627.50 13
2000-06-01 Fracture 623.00 627.50 0
2010-09-16 Cement Plug 606.30 615.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 7346 0.0 0.0 0.0
1990 7732 0.0 0.0 0.0
1991 6805 0.0 0.0 0.0
1993 5178 0.0 0.0 0.0
1994 479 0.0 0.0 0.0
1995 1330 0.0 0.0 0.0
1996 1061 0.0 0.0 0.0
1997 480 0.0 0.0 0.0
1998 480 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-09-16 No Incident Encountered 0.00 0.00

For data sources see[6]

References