X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434013602022

Well Details

Well ID: 0434013602022
Loading map...
Location: 02/02-36-043-01W4/2
Location Alias: 02/02-36-43-01 W4M
Location Alias 2: 02/02-36-043-01 W4/02
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 01
Section: 36
County/Municipality: Municipal District of Wainwright No. 61
Well Name: HARVEST 2B CHAUV 2-36-43-1
Operator Name: Cardinal Energy Ltd.
License Number: 0209037
License Date: 1997-11-21
License Status: Issued
Spud Date: 1997-12-08
Final Drill Date: 1997-12-18
Well Total Depth: 752.00 m
Surface Hole Latitude: 52.741044
Surface Hole Longitude: -110.012763

For data sources see[1][2]

Well History

Date Event
1997-11-21 Obtained License
1997-12-08 Surface Casing Operation Performed
1997-12-17 Direction Drilling Operation Performed - Deviate
1997-12-17 Well Log Performed
1997-12-18 Finished Drilling
1997-12-18 Well Mode changed to Drilled and Cased
1997-12-19 Production Casing Operation Performed
1997-12-19 Rig Released
1998-01-26 Well Log Performed
1998-03-01 Well Log Performed
1998-03-02 Well Log Performed
1998-03-04 Perforation Treatment Performed - Jet Perforation
1998-03-04 Well Log Performed
1998-03-12 Well Log Performed
2004-02-25 Well Log Performed
2004-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-02-28 Perforation Treatment Performed - Jet Perforation
2004-02-28 Plug Back Performed
2004-02-28 Well Log Performed
2004-03-27 Well Began Production
2004-03-27 Well Fluid changed to Water
2004-03-27 Well Type changed to Source

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-12-17 135.50 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-03-04 Perforation 722.50 724.00 18
2004-02-28 Packing Device Capped w/Cement 713.00 721.00 0
2004-02-28 Perforation 652.50 654.50 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 4759 0.0 0.0 0.0
2005 2753 0.0 0.0 0.0
2006 6927 0.0 0.0 0.0
2007 3594 0.0 0.0 0.0
2008 536 0.0 0.0 0.0
2009 6527 0.0 0.0 0.0
2010 6959 0.0 0.0 0.0
2011 2978 0.0 0.0 0.0
2012 3966 0.0 0.0 0.0
2013 4367 0.0 0.0 0.0
2014 3434 0.0 0.0 0.0
2015 150 0.0 0.0 0.0
2016 1552 0.0 0.0 0.0
2017 2967 0.0 0.0 0.0
2018 4538 0.0 0.0 0.0
2019 2733 0.0 0.0 0.0
2020 526 0.0 0.0 0.0

For data sources see[6]

References