X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434013510002

Well Details

Well ID: 0434013510002
Loading map...
Location: 00/10-35-043-01W4/2
Location Alias: 00/10-35-43-01 W4M
Location Alias 2: 00/10-35-043-01 W4/02
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 01
Section: 35
County/Municipality: Municipal District of Wainwright No. 61
Well Name: HARVEST 10A CHAUV 10-35-43-1
Operator Name: Cardinal Energy Ltd.
License Number: 0206049
License Date: 1997-09-12
License Status: Amended
Spud Date: 1997-09-25
Final Drill Date: 1997-10-05
Well Total Depth: 938.00 m
Surface Hole Latitude: 52.745140
Surface Hole Longitude: -110.043402

For data sources see[1][2]

Well History

Date Event
1997-09-12 Obtained License
1997-09-26 Surface Casing Operation Performed
1997-10-05 Finished Drilling
1997-10-05 Production Casing Operation Performed
1997-10-05 Well Log Performed
1997-10-05 Well Mode changed to Drilled and Cased
1997-10-06 Rig Released
1997-10-16 Well Log Performed
1997-10-17 Perforation Treatment Performed - Jet Perforation
1997-10-17 Well Log Performed
1997-11-01 Perforation Treatment Performed - Fractured
1999-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-09-29 Perforation Treatment Performed - Jet Perforation
1999-09-29 Well Log Performed
1999-09-30 Well Log Performed
1999-10-24 Perforation Treatment Performed - Fractured
1999-10-24 Well Mode changed to Drilled and Cased
1999-12-13 Well Began Production
1999-12-13 Well Fluid changed to Crude Oil
1999-12-13 Well Mode changed to Pumping
2001-12-13 Well Fluid changed to Crude Oil
2001-12-13 Well Mode changed to Suspended
2001-12-15 Well Log Performed
2002-05-16 Well Began Injection
2002-05-16 Well Fluid changed to Water
2002-05-16 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-10-17 Perforation 793.00 798.00 17
1997-11-01 Fracture 793.00 798.00 0
1999-09-28 Packing Device Capped w/Cement 788.50 790.00 0
1999-09-29 Perforation 774.00 777.00 30
1999-10-24 Fracture 774.00 777.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 450 0.0 0.0 0.0
2000 8264 0.0 0.0 0.0
2001 4736 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References