X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434013506030

Well Details

Well ID: 0434013506030
Loading map...
Location: 03/06-35-043-01W4/0
Location Alias: 03/06-35-43-01 W4M
Location Alias 2: 03/06-35-043-01 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 01
Section: 35
County/Municipality: Municipal District of Wainwright No. 61
Well Name: HARVEST 6C CHAUV 6-35-43-1
Operator Name: Cardinal Energy Ltd.
License Number: 0224811
License Date: 1999-07-27
License Status: Issued
Spud Date: 1999-07-27
Final Drill Date: 1999-08-08
Well Total Depth: 706.00 m
Surface Hole Latitude: 52.748503
Surface Hole Longitude: -110.045121

For data sources see[1][2]

Well History

Date Event
1999-07-27 Direction Drilling Operation Performed - Deviate
1999-07-27 Obtained License
1999-07-27 Surface Casing Operation Performed
1999-08-08 Finished Drilling
1999-08-08 Production Casing Operation Performed
1999-08-08 Rig Released
1999-08-08 Well Log Performed
1999-08-08 Well Mode changed to Drilled and Cased
1999-08-31 Well Log Performed
1999-11-05 Perforation Treatment Performed - Jet Perforation
1999-11-06 Well Log Performed
1999-11-07 Perforation Treatment Performed - Fractured
1999-11-26 Well Began Production
1999-11-26 Well Fluid changed to Crude Oil
1999-11-26 Well Mode changed to Pumping
2007-02-26 Perforation Treatment Performed - Jet Perforation
2007-02-26 Well Log Performed
2008-02-18 Perforation Treatment Performed - Cement Squeeze
2008-02-19 Perforation Treatment Performed - Jet Perforation
2008-02-19 Well Log Performed
2008-03-24 Perforation Treatment Performed - Cement Squeeze
2008-03-29 Perforation Treatment Performed - Jet Perforation
2008-03-29 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1999-07-27 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-11-05 Perforation 654.00 656.00 13
1999-11-07 Fracture 654.00 656.00 0
2007-02-26 Perforation 652.50 654.00 17
2008-02-18 Cement Squeeze 652.50 656.00 0
2008-02-19 Perforation 654.00 656.00 17
2008-03-24 Cement Squeeze 654.00 656.00 0
2008-03-29 Perforation 654.00 656.00 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 824 0.0 0.0 0.0
2000 8530 0.0 0.0 0.0
2001 8710 0.0 0.0 0.0
2002 8723 0.0 0.0 0.0
2003 8707 0.0 0.0 0.0
2004 8764 0.0 0.0 0.0
2005 8744 0.0 0.0 0.0
2006 8734 0.0 0.0 0.0
2007 8032 0.0 0.0 0.0
2008 8248 0.0 0.0 0.0
2009 8107 0.0 0.0 0.0
2010 7427 0.0 0.0 0.0
2011 8017 0.0 0.0 0.0
2012 8525 0.0 0.0 0.0
2013 8565 0.0 0.0 0.0
2014 8730 0.0 0.0 0.0
2015 8383 0.0 0.0 0.0
2016 8741 0.0 0.0 0.0
2017 8708 0.0 0.0 0.0
2018 8700 0.0 0.0 0.0
2019 8733 0.0 0.0 0.0
2020 2181 0.0 0.0 0.0

For data sources see[6]

References