X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434012808000

Well Details

Well ID: 0434012808000
Loading map...
Location: 00/08-28-043-01W4/0
Location Alias: 00/08-28-43-01 W4M
Location Alias 2: 00/08-28-043-01 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 01
Section: 28
County/Municipality: Municipal District of Wainwright No. 61
Well Name: PRADO CHAUVIN NO. 8-28
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0004896
License Date: 1952-06-24
License Status: Issued
Spud Date: 1952-06-27
Final Drill Date: 1952-07-10
Well Total Depth: 666.00 m
Surface Hole Latitude: 52.731505
Surface Hole Longitude: -110.080337

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-06-24 Obtained License
1952-06-30 Lost Circulation Occurred
1952-07-08 Drill Stem Test Performed
1952-07-09 Drill Stem Test Performed
1952-07-10 Finished Drilling
1952-07-10 Well Mode changed to Drilled and Cased
1952-07-12 Production Casing Operation Performed
1952-07-20 Perforation Treatment Performed - Bullet Perforation
1952-08-10 Perforation Treatment Performed - Jet Perforation
1952-08-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1952-11-12 Perforation Treatment Performed - Jet Perforation
1952-11-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1952-11-15 Perforation Treatment Performed - Cement Squeeze
1952-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-11-21 Perforation Treatment Performed - Jet Perforation
1952-12-04 Well Began Production
1952-12-04 Well Fluid changed to Crude Oil
1952-12-04 Well Mode changed to Pumping
1961-05-02 Perforation Treatment Performed - Fractured
1967-10-07 Well Log Performed
1967-10-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1967-11-01 Perforation Treatment Performed - Jet Perforation
1977-02-22 Well Fluid changed to Crude Oil
1977-02-22 Well Mode changed to Suspended
1995-08-01 Well Log Performed
1995-08-02 Well Log Performed
1995-12-01 Well Began Injection
1995-12-01 Well Fluid changed to Water
1995-12-01 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-07-20 Bullet Perforation 658.40 660.80 0
1967-10-09 Packing Device Capped w/Cement 651.10 651.10 0
1967-11-01 Perforation 649.80 651.10 7
1952-08-10 Perforation 653.50 655.90 10
1952-08-19 Packing Device Capped w/Cement 657.10 657.10 0
1952-11-12 Perforation 647.40 648.60 0
1952-11-15 Packing Device Capped w/Cement 650.70 650.70 0
1952-11-15 Cement Squeeze 647.40 648.60 0
1952-11-21 Perforation 653.80 655.00 13
1952-11-21 Acid Treatment 653.80 655.00 0
1961-05-02 Fracture 653.80 655.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6180 0.0 0.0 0.0
1968 7634 0.0 0.0 0.0
1969 7650 0.0 0.0 0.0
1970 3882 0.0 0.0 0.0
1971 6260 0.0 0.0 0.0
1972 768 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1952-06-30 Lost Circulation 276.10 276.10

For data sources see[6]

References