If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0434012807000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.7325,"lon":-110.087792,"icon":""}]} |
Location: 00/07-28-043-01W4/0 | |
Location Alias: 00/07-28-43-01 W4M | |
Location Alias 2: 00/07-28-043-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 4 | |
Range: 01 | |
Section: 28 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: TRIAD MMU CHAUVIN WW 7C-28-43-1 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0006116 | |
License Date: 1953-02-26 | |
License Status: Suspension | |
Spud Date: 1953-03-19 | |
Final Drill Date: 1953-03-26 | |
Well Total Depth: 731.50 m | |
Surface Hole Latitude: 52.732500 | |
Surface Hole Longitude: -110.087792 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1953-02-26 | Obtained License |
1953-03-24 | Drill Stem Test Performed |
1953-03-26 | Finished Drilling |
1953-03-26 | Production Casing Operation Performed |
1953-03-26 | Well Mode changed to Drilled and Cased |
1953-04-22 | Perforation Treatment Performed - Bullet Perforation |
1953-08-25 | Well Began Production |
1953-08-25 | Well Fluid changed to Crude Oil |
1953-08-25 | Well Mode changed to Pumping |
1969-06-07 | Perforation Treatment Performed - Cement Squeeze |
1969-06-07 | Well Fluid changed to Crude Oil |
1969-06-07 | Well Mode changed to Abandoned Zone |
1969-06-13 | Well Log Performed |
1969-06-14 | Perforation Treatment Performed - Open-Hole Completion |
1969-07-12 | Perforation Treatment Performed - Slotted Liner or Casing |
2018-06-15 | Well Log Performed |
2018-06-19 | Perforation Treatment Performed - Cement Plug |
2018-06-19 | Perforation Treatment Performed - Cement Squeeze |
2018-06-19 | Perforation Treatment Performed - Jet Perforation |
2018-06-19 | Plug Back Performed |
2018-06-19 | Well Log Performed |
2018-06-20 | Perforation Treatment Performed - Cement Plug |
2018-06-20 | Plug Back Performed |
2018-06-21 | Perforation Treatment Performed - Jet Perforation |
2018-06-21 | Well Log Performed |
2018-06-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2018-06-22 | Perforation Treatment Performed - Remedial Casing |
2018-06-22 | Plug Back Performed |
2018-06-25 | Perforation Treatment Performed - Jet Perforation |
2018-06-25 | Well Log Performed |
2018-06-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2018-06-26 | Perforation Treatment Performed - Cement Plug |
2018-06-26 | Perforation Treatment Performed - Remedial Casing |
2018-06-26 | Plug Back Performed |
2018-06-27 | Perforation Treatment Performed - Cement Plug |
2018-06-27 | Perforation Treatment Performed - Jet Perforation |
2018-06-27 | Perforation Treatment Performed - Remedial Casing |
2018-06-27 | Plug Back Performed |
2018-06-28 | Perforation Treatment Performed - Cement Plug |
2018-06-28 | Plug Back Performed |
2019-01-09 | Perforation Treatment Performed - Jet Perforation |
2019-01-14 | Perforation Treatment Performed - Jet Perforation |
2019-01-15 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1953-04-22 | Bullet Perforation | 638.90 | 643.40 | 10 |
2018-06-20 | Cement Plug | 582.40 | 687.00 | 0 |
2018-06-21 | Perforation | 364.00 | 365.00 | 17 |
2018-06-22 | Acid Treatment | 364.00 | 365.00 | 0 |
2018-06-22 | Remedial Casing Cementing | 364.00 | 365.00 | 0 |
2018-06-25 | Perforation | 260.00 | 261.00 | 17 |
2018-06-26 | Acid Treatment | 260.00 | 261.00 | 0 |
2018-06-26 | Remedial Casing Cementing | 260.00 | 261.00 | 0 |
2018-06-26 | Cement Plug | 218.40 | 277.70 | 0 |
2018-06-27 | Perforation | 184.00 | 185.00 | 17 |
2018-06-27 | Remedial Casing Cementing | 184.00 | 185.00 | 0 |
1969-06-07 | Cement Squeeze | 638.90 | 643.40 | 0 |
2018-06-27 | Cement Plug | 134.00 | 202.00 | 0 |
2018-06-28 | Cement Plug | 59.80 | 133.50 | 0 |
2019-01-09 | Perforation | 184.00 | 185.00 | 17 |
2019-01-14 | Perforation | 260.00 | 261.00 | 17 |
2019-01-15 | Perforation | 364.00 | 365.00 | 17 |
1969-06-14 | Open Hole/Barefoot Completion | 674.80 | 731.50 | 0 |
1969-07-12 | Slotted Liner | 666.00 | 716.00 | 0 |
2018-06-19 | Perforation | 707.00 | 708.00 | 17 |
2018-06-19 | Perforation | 684.00 | 685.00 | 17 |
2018-06-19 | Cement Squeeze | 707.00 | 708.00 | 0 |
2018-06-19 | Cement Squeeze | 684.00 | 685.00 | 0 |
2018-06-19 | Cement Plug | 687.00 | 711.90 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 8283 | 0.0 | 0.0 | 0.0 |
1968 | 8181 | 0.0 | 0.0 | 0.0 |
1969 | 3570 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-06-28 | No Incident Encountered | 0.00 | 0.00 |
2019-01-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]