If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0434012703000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.728656,"lon":-110.069622,"icon":""}]} |
Location: 00/03-27-043-01W4/0 | |
Location Alias: 00/03-27-43-01 W4M | |
Location Alias 2: 00/03-27-043-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 4 | |
Range: 01 | |
Section: 27 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: PRADO C.P.R. CHAUVIN NO. 3C-27 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0005853 | |
License Date: 1952-12-22 | |
License Status: RecExempt | |
Spud Date: 1952-12-29 | |
Final Drill Date: 1953-01-02 | |
Well Total Depth: 649.20 m | |
Surface Hole Latitude: 52.728656 | |
Surface Hole Longitude: -110.069622 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1952-12-22 | Obtained License |
1953-01-02 | Drill Stem Test Performed |
1953-01-02 | Finished Drilling |
1953-01-02 | Well Mode changed to Drilled and Cased |
1953-01-04 | Production Casing Operation Performed |
1953-01-21 | Perforation Treatment Performed - Bullet Perforation |
1953-01-23 | Well Began Production |
1953-01-23 | Well Fluid changed to Crude Oil |
1953-01-23 | Well Mode changed to Pumping |
1954-07-29 | Perforation Treatment Performed - Cement Squeeze |
1954-08-19 | Perforation Treatment Performed - Bullet Perforation |
1960-06-10 | Perforation Treatment Performed - Cement Squeeze |
1960-06-10 | Well Abandoned |
1960-06-10 | Well Fluid changed to Crude Oil |
1960-06-10 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1953-01-21 | Bullet Perforation | 589.50 | 591.90 | 10 |
1953-01-21 | Bullet Perforation | 591.90 | 592.80 | 10 |
1954-07-29 | Cement Squeeze | 589.50 | 592.80 | 0 |
1954-08-19 | Bullet Perforation | 619.40 | 621.80 | 10 |
1960-06-10 | Cement Squeeze | 619.40 | 621.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]