X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434011904040

Well Details

Well ID: 0434011904040
Loading map...
Location: 04/04-19-043-01W4/0
Location Alias: 04/04-19-43-01 W4M
Location Alias 2: 04/04-19-043-01 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 01
Section: 19
County/Municipality: Municipal District of Wainwright No. 61
Well Name: TALISMAN HZ 4C1 CHAUVINS 4-19-43-1
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0475115
License Date: 2015-04-01
License Status: Issued
Spud Date: 2017-01-12
Final Drill Date: 2017-01-18
Well Total Depth: 1533.00 m
Surface Hole Latitude: 52.706402
Surface Hole Longitude: -110.145348

For data sources see[1][2]

Well History

Date Event
2015-04-01 Obtained License
2017-01-13 Surface Casing Operation Performed
2017-01-14 Direction Drilling Operation Performed - Deviate
2017-01-15 Direction Drilling Operation Performed - Horizontal
2017-01-15 Intermediate Casing Operation Performed
2017-01-15 Well Log Performed
2017-01-18 Finished Drilling
2017-01-18 Perforation Treatment Performed - Open-Hole Completion
2017-01-18 Well Log Performed
2017-01-18 Well Mode changed to Drilled and Cased
2017-01-19 Liner Casing Operation Performed
2017-01-19 Perforation Treatment Performed - Slotted Liner or Casing
2017-01-19 Rig Released
2017-03-31 Well Began Production
2017-03-31 Well Fluid changed to Crude Oil
2017-03-31 Well Mode changed to Pumping
2017-10-12 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-01-12 Horizon Drilling Inc. 7 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-01-14 425.50 Deviate (5 - 79 degrees)
2017-01-15 847.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-01-18 Open Hole/Barefoot Completion 1190.00 1533.00 0
2017-01-19 Slotted Liner 890.00 1190.00 0
2017-10-12 Chemical Squeeze 1190.00 1533.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 6221 0.0 0.0 0.0
2018 8329 0.0 0.0 0.0
2019 8409 0.0 0.0 0.0
2020 889 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-19 No Incident Encountered 0.00 0.00
2017-02-15 No Incident Encountered 0.00 0.00
2017-10-13 No Incident Encountered 0.00 0.00

For data sources see[8]

References