X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434010505002

Well Details

Well ID: 0434010505002
Loading map...
Location: 00/05-05-043-01W4/2
Location Alias: 00/05-05-43-01 W4M
Location Alias 2: 00/05-05-043-01 W4/02
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 01
Section: 05
County/Municipality: Municipal District of Wainwright No. 61
Well Name: TALISMAN CHAUVS 5-5-43-1
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0167052
License Date: 1994-05-11
License Status: Abandoned
Spud Date: 1994-05-15
Final Drill Date: 1994-05-17
Well Total Depth: 668.00 m
Surface Hole Latitude: 52.674764
Surface Hole Longitude: -110.119831

For data sources see[1][2]

Well History

Date Event
1994-05-11 Obtained License
1994-05-16 Surface Casing Operation Performed
1994-05-17 Finished Drilling
1994-05-17 Well Mode changed to Drilled and Cased
1994-05-18 Drill Stem Test Performed
1994-05-18 Well Log Performed
1994-05-19 Drill Stem Test Performed
1994-05-20 Drill Stem Test Performed
1994-05-20 Production Casing Operation Performed
1994-05-20 Rig Released
1994-06-10 Perforation Treatment Performed - Jet Perforation
1994-06-10 Well Log Performed
1994-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-06-11 Perforation Treatment Performed - Jet Perforation
1994-06-11 Plug Back Performed
1994-06-11 Well Log Performed
1994-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-06-27 Perforation Treatment Performed - Jet Perforation
2004-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-09-30 Perforation Treatment Performed - Jet Perforation
2004-09-30 Plug Back Performed
2005-05-16 Well Log Performed
2005-05-28 Perforation Treatment Performed - Fractured
2005-12-21 Well Began Production
2005-12-21 Well Fluid changed to Gas
2005-12-21 Well Mode changed to Flowing
2015-09-01 Well Fluid changed to Gas
2015-09-01 Well Mode changed to Suspended
2017-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-02-28 Plug Back Performed
2017-02-28 Well Fluid changed to Gas
2017-02-28 Well Mode changed to Abandoned Zone
2017-03-30 Well Abandoned
2017-03-30 Well Fluid changed to Gas
2017-03-30 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-06-10 Perforation 646.50 648.00 14
2017-02-28 Packing Device Capped w/Cement 455.00 465.00 0
1994-06-11 Packing Device Capped w/Cement 632.00 640.00 0
1994-06-11 Perforation 563.40 565.00 13
1994-06-13 Acid Treatment 563.40 565.00 0
1994-06-27 Perforation 556.00 557.00 14
1994-06-27 Perforation 565.00 565.50 18
2004-09-30 Packing Device Capped w/Cement 541.30 549.30 0
2004-09-30 Perforation 477.00 478.00 20
2005-05-28 Fracture 477.00 478.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 264 0.0 0.0 0.0
2006 8143 0.0 0.0 0.0
2007 7367 0.0 0.0 0.0
2008 6353 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-02-28 No Incident Encountered 0.00 0.00

For data sources see[6]

References