X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425093513000

Well Details

Well ID: 0425093513000
Loading map...
Location: 00/13-35-042-09W5/0
Location Alias: 00/13-35-42-09 W5M
Location Alias 2: 00/13-35-042-09 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 09
Section: 35
County/Municipality: Clearwater County
Well Name: SHANGHAIEN WILLGR 13-35-42-9
Operator Name: Shanghai Energy Corporation
License Number: 0449258
License Date: 2012-10-17
License Status: Issued
Spud Date: 2012-12-29
Final Drill Date: 2013-01-17
Well Total Depth: 3680.00 m
Surface Hole Latitude: 52.652467
Surface Hole Longitude: -115.193735

For data sources see[1][2]

Well History

Date Event
2012-10-17 Obtained License
2013-01-01 Surface Casing Operation Performed
2013-01-05 Direction Drilling Operation Performed - Deviate
2013-01-07 Direction Drilling Operation Performed - Horizontal
2013-01-08 Well Log Performed
2013-01-09 Intermediate Casing Operation Performed
2013-01-17 Finished Drilling
2013-01-17 Well Log Performed
2013-01-17 Well Mode changed to Drilled and Cased
2013-01-21 Liner Casing Operation Performed
2013-01-21 Rig Released
2013-01-24 Well Log Performed
2013-02-01 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-01 Perforation Treatment Performed - Open-Hole Completion
2013-02-01 Well Began Production
2013-02-01 Well Fluid changed to Crude Oil
2013-02-01 Well Mode changed to Flowing
2013-02-02 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-12-29 Beaver Drilling Ltd. 4 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-01-05 1753.20 Deviate (5 - 79 degrees)
2013-01-07 2192.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-02-01 Open Hole/Barefoot Completion 3675.00 3680.00 0
2013-02-01 Multi-Stage Fracture 2947.60 2947.70 0
2013-02-01 Multi-Stage Fracture 2864.80 2864.90 0
2013-02-02 Multi-Stage Fracture 2782.10 2782.20 0
2013-02-02 Multi-Stage Fracture 2699.40 2699.50 0
2013-02-02 Multi-Stage Fracture 2616.70 2616.80 0
2013-02-02 Multi-Stage Fracture 2521.10 2521.20 0
2013-02-02 Multi-Stage Fracture 2438.30 2438.40 0
2013-02-02 Multi-Stage Fracture 2355.60 2355.70 0
2013-02-01 Multi-Stage Fracture 3639.40 3639.50 0
2013-02-01 Multi-Stage Fracture 3550.40 3550.50 0
2013-02-01 Multi-Stage Fracture 3468.40 3468.50 0
2013-02-01 Multi-Stage Fracture 3386.10 3386.20 0
2013-02-01 Multi-Stage Fracture 3290.40 3290.50 0
2013-02-01 Multi-Stage Fracture 3207.70 3207.80 0
2013-02-01 Multi-Stage Fracture 3125.60 3125.70 0
2013-02-01 Multi-Stage Fracture 3043.00 3043.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-02-01 2013-02-02 2,026 2,976 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 89.325 N/A
Sand (30/50) Trican silica crystalline 14808-60-7 100 7.4968 N/A
Sand (40/70) Trican silica crystalline 14808-60-7 100 2.3548 N/A
Sand (50/140) Trican silica crystalline 14808-60-7 100 0.4674 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.011 N/A
dibromoacetonitrile 3252-43-5 100 0.011 N/A
non-hazardous ingredients Not Available 100 0.011 N/A
polyethylene glycol 25322-68-3 100 0.011 N/A
sodium bromide 7647-15-6 100 0.011 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0177 N/A
CC-55 Trican Clay Control 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide 7744 100 0.1955 N/A
formic acid 64-18-6 100 0.1955 N/A
non-hazardous ingredients Not Available 100 0.1955 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0488 N/A
propylene glycol 57-55-6 100 0.0488 N/A
FR-8 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0949 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0949 N/A
non-hazardous ingredients Not Available 100 0.0949 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-01-28 2013-02-02 Surface Water - Runoff 1190
2013-01-25 2013-01-28 Surface Water - River 2070

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 7465 0.0 0.0 0.0
2014 8699 0.0 0.0 0.0
2015 5498 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8664 0.0 0.0 0.0
2018 8591 0.0 0.0 0.0
2019 8015 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-01-21 No Incident Encountered 0.00 0.00
2013-02-01 No Incident Encountered 0.00 0.00

For data sources see[10]

References