Well ID: 0425093416000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.65215,"lon":-115.208071,"icon":""}]} |
Location: 00/16-34-042-09W5/0 | |
Location Alias: 00/16-34-42-09 W5M | |
Location Alias 2: 00/16-34-042-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 5 | |
Range: 09 | |
Section: 34 | |
County/Municipality: Clearwater County | |
Well Name: SHANGHAIEN WILLGR 16-34-42-9 | |
Operator Name: Shanghai Energy Corporation | |
License Number: 0445955 | |
License Date: 2012-05-17 | |
License Status: Issued | |
Spud Date: 2012-06-05 | |
Final Drill Date: 2012-06-21 | |
Well Total Depth: 3784.00 m | |
Surface Hole Latitude: 52.652150 | |
Surface Hole Longitude: -115.208071 |
Date | Event |
---|---|
2012-05-17 | Obtained License |
2012-06-05 | Lost Circulation Occurred |
2012-06-07 | Surface Casing Operation Performed |
2012-06-10 | Direction Drilling Operation Performed - Deviate |
2012-06-12 | Direction Drilling Operation Performed - Horizontal |
2012-06-14 | Well Log Performed |
2012-06-15 | Intermediate Casing Operation Performed |
2012-06-21 | Finished Drilling |
2012-06-21 | Well Log Performed |
2012-06-21 | Well Mode changed to Drilled and Cased |
2012-06-24 | Liner Casing Operation Performed |
2012-06-24 | Rig Released |
2012-09-11 | Well Log Performed |
2012-09-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-20 | Perforation Treatment Performed - Open-Hole Completion |
2012-09-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-23 | Well Began Production |
2012-09-23 | Well Fluid changed to Crude Oil |
2012-09-23 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-06-05 | Beaver Drilling Ltd. | 4 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-06-10 | 1750.70 | Deviate (5 - 79 degrees) |
2012-06-12 | 2172.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-09-20 | Open Hole/Barefoot Completion | 3779.00 | 3784.00 | 0 |
2012-09-21 | Multi-Stage Fracture | 3053.90 | 3054.00 | 0 |
2012-09-21 | Multi-Stage Fracture | 2967.80 | 2967.90 | 0 |
2012-09-21 | Multi-Stage Fracture | 2881.70 | 2881.80 | 0 |
2012-09-21 | Multi-Stage Fracture | 2795.60 | 2795.70 | 0 |
2012-09-21 | Multi-Stage Fracture | 2709.50 | 2709.60 | 0 |
2012-09-21 | Multi-Stage Fracture | 2623.40 | 2623.50 | 0 |
2012-09-22 | Multi-Stage Fracture | 2537.30 | 2537.40 | 0 |
2012-09-22 | Multi-Stage Fracture | 2451.20 | 2451.30 | 0 |
2012-09-20 | Multi-Stage Fracture | 3756.20 | 3756.30 | 0 |
2012-09-20 | Multi-Stage Fracture | 3663.00 | 3663.10 | 0 |
2012-09-20 | Multi-Stage Fracture | 3573.60 | 3573.70 | 0 |
2012-09-20 | Multi-Stage Fracture | 3484.30 | 3484.40 | 0 |
2012-09-21 | Multi-Stage Fracture | 3398.20 | 3398.30 | 0 |
2012-09-21 | Multi-Stage Fracture | 3312.20 | 3312.30 | 0 |
2012-09-21 | Multi-Stage Fracture | 3226.10 | 3226.20 | 0 |
2012-09-21 | Multi-Stage Fracture | 3140.00 | 3140.10 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 2928 | 0.0 | 0.0 | 0.0 |
2013 | 8258 | 0.0 | 0.0 | 0.0 |
2014 | 8399 | 0.0 | 0.0 | 0.0 |
2015 | 2760 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 7824 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 7967 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-06-05 | Lost Circulation | 97.00 | 155.00 |
2012-09-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]