X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425091810000

Well Details

Well ID: 0425091810000
Loading map...
Location: 00/10-18-042-09W5/0
Location Alias: 00/10-18-42-09 W5M
Location Alias 2: 00/10-18-042-09 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 09
Section: 18
County/Municipality: Clearwater County
Well Name: CDN-SUP ET AL NO NAME 10-18-42-9
Operator Name: ExxonMobil Canada Resources Company
License Number: 0027816
License Date: 1965-02-23
License Status: Re-Entered
Spud Date: 1965-02-25
Final Drill Date: 1965-03-20
Well Total Depth: 2225.00 m
Surface Hole Latitude: 52.619563
Surface Hole Longitude: -115.281889

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-02-23 Obtained License
1965-03-03 Lost Circulation Occurred
1965-03-20 Finished Drilling
1965-03-20 Well Mode changed to Drilled and Cased
1965-03-22 Production Casing Operation Performed
1965-03-25 Perforation Treatment Performed - Jet Perforation
1965-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-03-27 Perforation Treatment Performed - Fractured
1965-04-09 Well Began Production
1965-04-09 Well Fluid changed to Crude Oil
1965-04-09 Well Mode changed to Flowing
1966-05-05 Well Fluid changed to Crude Oil
1966-05-05 Well Mode changed to Suspended
1967-02-06 Well Fluid changed to Crude Oil
1967-02-06 Well Mode changed to Flowing
1971-03-22 Well Fluid changed to Crude Oil
1971-03-22 Well Mode changed to Suspended
1990-12-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-12-04 Perforation Treatment Performed - Jet Perforation
1990-12-04 Plug Back Performed
1990-12-04 Well Fluid changed to Crude Oil
1990-12-04 Well Log Performed
1990-12-04 Well Mode changed to Abandoned and Re-entered
1990-12-05 Perforation Treatment Performed - Remedial Casing
1990-12-06 Perforation Treatment Performed - Jet Perforation
1990-12-06 Perforation Treatment Performed - Remedial Casing
1990-12-06 Well Abandoned
1990-12-06 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-03-25 Perforation 2171.10 2172.30 13
1965-03-27 Acid Treatment 2171.10 2172.30 0
1965-03-27 Fracture 2171.10 2172.30 0
1990-12-04 Packing Device Capped w/Cement 2152.00 2160.00 0
1990-12-04 Perforation 600.00 602.00 13
1990-12-05 Remedial Casing Cementing 600.00 602.00 0
1990-12-06 Perforation 283.00 285.00 13
1990-12-06 Remedial Casing Cementing 283.00 285.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1440 0.0 0.0 0.0
1969 4169 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1965-03-03 Lost Circulation 1019.50 1019.50

For data sources see[6]

References