If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0425083116020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.652805,"lon":-115.149482,"icon":""}]} |
Location: 02/16-31-042-08W5/0 | |
Location Alias: 02/16-31-42-08 W5M | |
Location Alias 2: 02/16-31-042-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 5 | |
Range: 08 | |
Section: 31 | |
County/Municipality: Clearwater County | |
Well Name: SHANGHAIEN WILLGR 16-31-42-8 | |
Operator Name: Shanghai Energy Corporation | |
License Number: 0468348 | |
License Date: 2014-07-22 | |
License Status: Issued | |
Spud Date: 2014-08-03 | |
Final Drill Date: 2014-08-26 | |
Well Total Depth: 4256.00 m | |
Surface Hole Latitude: 52.652805 | |
Surface Hole Longitude: -115.149482 |
Date | Event |
---|---|
2013-08-13 | Well Log Performed |
2014-07-22 | Obtained License |
2014-08-06 | Surface Casing Operation Performed |
2014-08-08 | Direction Drilling Operation Performed - Deviate |
2014-08-12 | Direction Drilling Operation Performed - Horizontal |
2014-08-13 | Well Log Performed |
2014-08-14 | Intermediate Casing Operation Performed |
2014-08-15 | Well Log Performed |
2014-08-26 | Finished Drilling |
2014-08-26 | Well Log Performed |
2014-08-26 | Well Mode changed to Drilled and Cased |
2014-08-29 | Liner Casing Operation Performed |
2014-08-30 | Perforation Treatment Performed - Open-Hole Completion |
2014-08-30 | Rig Released |
2014-09-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-09-20 | Perforation Treatment Performed - Open-Hole Completion |
2014-09-21 | Well Began Production |
2014-09-21 | Well Fluid changed to Gas |
2014-09-21 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-08-03 | Beaver Drilling Ltd. | 4 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-08-08 | 1587.00 | Deviate (5 - 79 degrees) |
2014-08-12 | 2513.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-08-30 | Open Hole/Barefoot Completion | 4251.00 | 4256.00 | 0 |
2014-09-20 | Multi-Stage Fracture | 3496.50 | 3496.60 | 0 |
2014-09-20 | Multi-Stage Fracture | 3407.30 | 3407.40 | 0 |
2014-09-20 | Multi-Stage Fracture | 3321.00 | 3321.10 | 0 |
2014-09-20 | Multi-Stage Fracture | 3231.70 | 3231.80 | 0 |
2014-09-20 | Multi-Stage Fracture | 3142.40 | 3142.50 | 0 |
2014-09-20 | Multi-Stage Fracture | 3054.80 | 3054.90 | 0 |
2014-09-20 | Multi-Stage Fracture | 2965.50 | 2965.60 | 0 |
2014-09-20 | Multi-Stage Fracture | 2876.00 | 2876.10 | 0 |
2014-09-20 | Multi-Stage Fracture | 2786.60 | 2786.70 | 0 |
2014-09-20 | Multi-Stage Fracture | 2697.80 | 2697.90 | 0 |
2014-09-20 | Open Hole/Barefoot Completion | 4251.00 | 4256.00 | 0 |
2014-09-20 | Multi-Stage Fracture | 3853.90 | 3854.00 | 0 |
2014-09-20 | Multi-Stage Fracture | 4214.50 | 4214.60 | 0 |
2014-09-20 | Multi-Stage Fracture | 4118.30 | 4118.40 | 0 |
2014-09-20 | Multi-Stage Fracture | 4029.00 | 4029.10 | 0 |
2014-09-20 | Multi-Stage Fracture | 3943.30 | 3943.40 | 0 |
2014-09-20 | Multi-Stage Fracture | 3764.60 | 3764.70 | 0 |
2014-09-20 | Multi-Stage Fracture | 3675.30 | 3675.40 | 0 |
2014-09-20 | Multi-Stage Fracture | 3585.90 | 3586.00 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-09-20 | 2014-09-20 | 2,332 | 3,861 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | N2 | 7727-37-9 | 100 | 3.4341 | N/A | |||
water | Not Available | 100 | 82.3094 | N/A | ||||
Sand 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 3.6543 | N/A | ||
Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 9.8862 | N/A | ||
Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 0.2983 | N/A | ||
Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0102 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0102 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0102 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0102 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0102 | N/A | ||||
GBO-1 | Trican | Breaker | sodium perborate tetrahydrate | 10486-00-7 | 100 | 0.0082 | N/A | |
CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.2655 | N/A | |
water | Not Available | 100 | 0.2655 | N/A | ||||
GNE-1 | Trican | Demulsifier | non-hazardous ingredients | Not Available | 100 | 0.0452 | N/A | |
propylene glycol | 57-55-6 | 100 | 0.0452 | N/A | ||||
FR-8 | Trican | Friction Reducer | ammonium chloride | 12125-02-9 | 100 | 0.088 | N/A | |
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.088 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.088 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-08-25 | 2014-09-20 | Surface Water - Runoff | 4534 |
2014-09-07 | 2014-09-07 | Recycled Fracturing Water (treated at well site) | 583 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 1920 | 0.0 | 0.0 | 0.0 |
2015 | 8351 | 0.0 | 0.0 | 0.0 |
2016 | 7463 | 0.0 | 0.0 | 0.0 |
2017 | 8208 | 0.0 | 0.0 | 0.0 |
2018 | 6967 | 0.0 | 0.0 | 0.0 |
2019 | 7487 | 0.0 | 0.0 | 0.0 |
2020 | 2159 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-08-30 | No Incident Encountered | 0.00 | 0.00 |
2014-09-01 | No Incident Encountered | 0.00 | 0.00 |
2014-09-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]