X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425081704020

Well Details

Well ID: 0425081704020
Loading map...
Location: 02/04-17-042-08W5/0
Location Alias: 02/04-17-42-08 W5M
Location Alias 2: 02/04-17-042-08 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 08
Section: 17
County/Municipality: Clearwater County
Well Name: PENN WEST 102 HZ WILLGR 4-17-42-8
Operator Name: Obsidian Energy Ltd.
License Number: 0468312
License Date: 2014-07-18
License Status: Issued
Spud Date: 2014-09-19
Final Drill Date: 2014-10-01
Well Total Depth: 4361.00 m
Surface Hole Latitude: 52.614540
Surface Hole Longitude: -115.090272

For data sources see[1][2]

Well History

Date Event
2014-07-18 Obtained License
2014-09-20 Surface Casing Operation Performed
2014-09-23 Direction Drilling Operation Performed - Deviate
2014-09-24 Well Log Performed
2014-09-26 Direction Drilling Operation Performed - Horizontal
2014-09-26 Intermediate Casing Operation Performed
2014-10-01 Finished Drilling
2014-10-01 Well Log Performed
2014-10-01 Well Mode changed to Drilled and Cased
2014-10-02 Liner Casing Operation Performed
2014-10-02 Well Log Performed
2014-10-03 Rig Released
2014-10-07 Well Log Performed
2014-10-10 Perforation Treatment Performed - Abrasa-Jet Perforation
2014-10-10 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-10 Perforation Treatment Performed - Open-Hole Completion
2014-10-10 Well Log Performed
2014-10-12 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-13 Well Began Production
2014-10-13 Well Fluid changed to Crude Oil
2014-10-13 Well Mode changed to Flowing
2014-10-15 Well Log Performed
2014-10-31 Well Fluid changed to Crude Oil
2014-10-31 Well Mode changed to Pumping
2015-11-08 Well Log Performed
2016-02-29 Well Began Injection
2016-02-29 Well Fluid changed to Water
2016-02-29 Well Type changed to Injection

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-09-19 Precision Drilling Corporation 281 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-09-23 1703.00 Deviate (5 - 79 degrees)
2014-09-26 2173.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-10-10 Open Hole/Barefoot Completion 4353.00 4361.00 0
2014-10-10 Multi-Stage Fracture 3625.00 3625.10 0
2014-10-10 Multi-Stage Fracture 3530.70 3530.80 0
2014-10-10 Hydra Jet Perforation 3436.50 3436.60 0
2014-10-12 Multi-Stage Fracture 3355.10 3355.20 0
2014-10-12 Multi-Stage Fracture 3260.30 3260.40 0
2014-10-12 Multi-Stage Fracture 3165.50 3165.60 0
2014-10-12 Multi-Stage Fracture 3071.10 3071.20 0
2014-10-12 Multi-Stage Fracture 2976.80 2976.90 0
2014-10-12 Multi-Stage Fracture 2895.30 2895.40 0
2014-10-12 Multi-Stage Fracture 2800.50 2800.60 0
2014-10-10 Multi-Stage Fracture 4326.30 4326.40 0
2014-10-12 Multi-Stage Fracture 2705.90 2706.00 0
2014-10-12 Multi-Stage Fracture 2611.60 2611.70 0
2014-10-12 Multi-Stage Fracture 2530.60 2530.70 0
2014-10-12 Multi-Stage Fracture 2437.20 2437.30 0
2014-10-12 Multi-Stage Fracture 2343.00 2343.10 0
2014-10-12 Multi-Stage Fracture 2250.20 2250.30 0
2014-10-10 Multi-Stage Fracture 4259.00 4259.10 0
2014-10-10 Multi-Stage Fracture 4177.60 4177.70 0
2014-10-10 Multi-Stage Fracture 4083.10 4083.20 0
2014-10-10 Multi-Stage Fracture 3988.50 3988.60 0
2014-10-10 Multi-Stage Fracture 3894.00 3894.10 0
2014-10-10 Multi-Stage Fracture 3813.00 3813.10 0
2014-10-10 Multi-Stage Fracture 3719.20 3719.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-10-10 2014-10-12 2,048 3,775 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 83.4415 N/A
FRAC SAND. 20/40 WHITE (OTTAWA TYPE) Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 9.8652 N/A
FRAC SAND. 30/50 WHITE Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 2.5656 N/A
2K7 Solution W-M Baker Hughes Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.083 N/A
Methanol 67-56-1 100 0.083 N/A
Water 7732-18-5 100 0.083 N/A
Breaker N Baker Hughes Breaker Sodium persulphate 7775-27-1 100 0.0024 N/A
CC-2 Baker Hughes Clay Control Non-hazardous Not Available 100 0.1857 N/A
Nitrogen Baker Hughes Energizing Fluid Nitrogen 7727-37-9 100 3.613 N/A
MaxPerm-20A Baker Hughes Friction Reducer Non-hazardous 9014 100 0.2432 N/A
Oxyalkylated alcohol 9014 100 0.2432 N/A
Petroleum distillates 64742-47-8 100 0.2432 N/A
Polyacrylate 9014 100 0.2432 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-10-07 2014-10-10 Surface Water - Lake 3794

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 1443 0.0 0.0 0.0
2015 7205 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-10-03 No Incident Encountered 0.00 0.00
2014-10-15 No Incident Encountered 0.00 0.00
2015-11-09 No Incident Encountered 0.00 0.00

For data sources see[10]

References