X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425072906002

Well Details

Well ID: 0425072906002
Loading map...
Location: 00/06-29-042-07W5/2
Location Alias: 00/06-29-42-07 W5M
Location Alias 2: 00/06-29-042-07 W5/02
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 07
Section: 29
County/Municipality: Clearwater County
Well Name: HESS CROWN BR WILLGRW 6-29-42-7
Operator Name: Obsidian Energy Ltd.
License Number: 0018650
License Date: 1960-02-04
License Status: Issued
Spud Date: 1960-02-11
Final Drill Date: 1960-03-20
Well Total Depth: 2627.40 m
Surface Hole Latitude: 52.645046
Surface Hole Longitude: -114.976107

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-02-04 Obtained License
1960-03-07 Drill Stem Test Performed
1960-03-15 Drill Stem Test Performed
1960-03-20 Finished Drilling
1960-03-20 Well Mode changed to Drilled and Cased
1960-03-22 Drill Stem Test Performed
1960-03-26 Production Casing Operation Performed
1960-03-27 Perforation Treatment Performed - Jet Perforation
1960-06-09 Perforation Treatment Performed - Fractured
1960-09-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1960-09-23 Perforation Treatment Performed - Jet Perforation
1960-09-24 Drill Stem Test Performed
1960-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-09-26 Perforation Treatment Performed - Jet Perforation
1960-09-30 Perforation Treatment Performed - Fractured
1960-10-12 Well Began Production
1960-10-12 Well Fluid changed to Crude Oil
1960-10-12 Well Mode changed to Flowing
1969-06-17 Perforation Treatment Performed - Acid Wash - No Pressure
1969-06-18 Perforation Treatment Performed - Abrasa-Jet Perforation
1969-06-19 Perforation Treatment Performed - Fractured
1982-11-03 Perforation Treatment Performed - Jet Perforation
1982-11-04 Perforation Treatment Performed - Acid Wash - No Pressure
1982-11-05 Perforation Treatment Performed - Fractured
1982-11-12 Well Fluid changed to Crude Oil
1982-11-12 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-03-27 Perforation 2501.80 2503.30 7
1960-09-30 Fracture 1978.20 1979.70 0
1969-06-17 Acid Wash 1978.20 1979.70 0
1969-06-18 Hydra Jet Perforation 1978.50 1978.50 0
1969-06-19 Fracture 1978.50 1978.50 0
1982-11-03 Perforation 1979.70 1981.20 13
1982-11-04 Acid Wash 1978.20 1981.20 0
1982-11-05 Fracture 1978.20 1981.20 0
1960-03-27 Perforation 2491.40 2494.20 7
1960-03-27 Perforation 2483.50 2484.70 7
1960-06-09 Fracture 2483.50 2503.30 0
1960-09-20 Acid Treatment 2501.80 2503.30 0
1960-09-23 Packing Device Capped w/Cement 2347.00 2347.00 0
1960-09-23 Perforation 1978.20 1979.70 13
1960-09-26 Acid Treatment 1978.20 1979.70 0
1960-09-26 Perforation 1978.20 1979.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3565 0.0 0.0 0.0
1968 2854 0.0 0.0 0.0
1969 5271 0.0 0.0 0.0
1970 8241 0.0 0.0 0.0
1971 7325 0.0 0.0 0.0
1972 8073 0.0 0.0 0.0
1973 7991 0.0 0.0 0.0
1974 8240 0.0 0.0 0.0
1975 8103 0.0 0.0 0.0
1976 8409 0.0 0.0 0.0
1977 8183 0.0 0.0 0.0
1978 8088 0.0 0.0 0.0
1979 8423 0.0 0.0 0.0
1980 8159 0.0 0.0 0.0
1981 3240 0.0 0.0 0.0
1982 7871 0.0 0.0 0.0
1983 8352 0.0 0.0 0.0
1984 8304 0.0 0.0 0.0
1985 8111 0.0 0.0 0.0
1986 8399 0.0 0.0 0.0
1987 7344 0.0 0.0 0.0
1988 8448 0.0 0.0 0.0
1989 8593 0.0 0.0 0.0
1990 8529 0.0 0.0 0.0
1991 8759 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8687 0.0 0.0 0.0
1994 8759 0.0 0.0 0.0
1995 8543 0.0 0.0 0.0
1996 7775 0.0 0.0 0.0
1997 8687 0.0 0.0 0.0
1998 7943 0.0 0.0 0.0
1999 8303 0.0 0.0 0.0
2000 8550 0.0 0.0 0.0
2001 8424 0.0 0.0 0.0
2002 8483 0.0 0.0 0.0
2003 8603 0.0 0.0 0.0
2004 8643 0.0 0.0 0.0
2005 8318 0.0 0.0 0.0
2006 8135 0.0 0.0 0.0
2007 8171 0.0 0.0 0.0
2008 7740 0.0 0.0 0.0
2009 8531 0.0 0.0 0.0
2010 8023 0.0 0.0 0.0
2011 8643 0.0 0.0 0.0
2012 8072 0.0 0.0 0.0
2013 8714 0.0 0.0 0.0
2014 8532 0.0 0.0 0.0
2015 8400 0.0 0.0 0.0
2016 2208 0.0 0.0 0.0
2017 7294 0.0 0.0 0.0
2018 7617 0.0 0.0 0.0
2019 6495 0.0 0.0 0.0
2020 24 0.0 0.0 0.0

For data sources see[5]

References