X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425070702020

Well Details

Well ID: 0425070702020
Loading map...
Location: 02/02-07-042-07W5/0
Location Alias: 02/02-07-42-07 W5M
Location Alias 2: 02/02-07-042-07 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 07
Section: 07
County/Municipality: Clearwater County
Well Name: PENN WEST 102 HZ WILLGR 2-7-42-7
Operator Name: Obsidian Energy Ltd.
License Number: 0425340
License Date: 2010-11-01
License Status: Issued
Spud Date: 2010-12-15
Final Drill Date: 2011-01-20
Well Total Depth: 3596.00 m
Surface Hole Latitude: 52.612378
Surface Hole Longitude: -114.990203

For data sources see[1][2]

Well History

Date Event
2010-11-01 Obtained License
2010-12-18 Surface Casing Operation Performed
2011-01-06 Direction Drilling Operation Performed - Horizontal
2011-01-11 Well Log Performed
2011-01-12 Intermediate Casing Operation Performed
2011-01-20 Finished Drilling
2011-01-20 Well Log Performed
2011-01-20 Well Mode changed to Drilled and Cased
2011-01-26 Liner Casing Operation Performed
2011-01-27 Rig Released
2011-02-02 Well Log Performed
2011-02-06 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-06 Perforation Treatment Performed - Open-Hole Completion
2011-02-10 Well Log Performed
2011-03-22 Well Began Production
2011-03-22 Well Fluid changed to Crude Oil
2011-03-22 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-01-06 1587.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-02-06 Open Hole/Barefoot Completion 3580.00 3596.00 0
2011-02-06 Multi-Stage Fracture 2925.40 2925.50 0
2011-02-06 Multi-Stage Fracture 2868.70 2868.80 0
2011-02-06 Multi-Stage Fracture 2799.50 2799.60 0
2011-02-06 Multi-Stage Fracture 2742.80 2742.90 0
2011-02-06 Multi-Stage Fracture 2673.10 2673.20 0
2011-02-06 Multi-Stage Fracture 2603.10 2603.20 0
2011-02-06 Multi-Stage Fracture 2546.90 2547.00 0
2011-02-06 Multi-Stage Fracture 2477.30 2477.40 0
2011-02-06 Multi-Stage Fracture 2420.90 2421.00 0
2011-02-06 Multi-Stage Fracture 2351.30 2351.40 0
2011-02-06 Multi-Stage Fracture 3548.20 3548.30 0
2011-02-06 Multi-Stage Fracture 3478.70 3478.80 0
2011-02-06 Multi-Stage Fracture 3422.00 3422.10 0
2011-02-06 Multi-Stage Fracture 3352.40 3352.50 0
2011-02-06 Multi-Stage Fracture 3295.70 3295.80 0
2011-02-06 Multi-Stage Fracture 3121.20 3121.30 0
2011-02-06 Multi-Stage Fracture 3064.70 3064.80 0
2011-02-06 Multi-Stage Fracture 2995.10 2995.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 6616 0.0 0.0 0.0
2012 8306 0.0 0.0 0.0
2013 8431 0.0 0.0 0.0
2014 8532 0.0 0.0 0.0
2015 8710 0.0 0.0 0.0
2016 8101 0.0 0.0 0.0
2017 8409 0.0 0.0 0.0
2018 8358 0.0 0.0 0.0
2019 8587 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References