If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0425062114030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.63676,"lon":-114.843123,"icon":""}]} |
| Location: 03/14-21-042-06W5/0 | |
| Location Alias: 03/14-21-42-06 W5M | |
| Location Alias 2: 03/14-21-042-06 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 042 | |
| Meridian: 5 | |
| Range: 06 | |
| Section: 21 | |
| County/Municipality: Clearwater County | |
| Well Name: ENTRADA HZ WILLGR 14-21-42-6 | |
| Operator Name: Entrada Resources Inc. | |
| License Number: 0482962 | |
| License Date: 2017-02-23 | |
| License Status: Amended | |
| Spud Date: 2017-03-08 | |
| Final Drill Date: 2017-03-28 | |
| Well Total Depth: 4199.00 m | |
| Surface Hole Latitude: 52.636760 | |
| Surface Hole Longitude: -114.843123 |
| Date | Event |
|---|---|
| 2017-02-23 | Obtained License |
| 2017-03-09 | Surface Casing Operation Performed |
| 2017-03-11 | Direction Drilling Operation Performed - Deviate |
| 2017-03-13 | Direction Drilling Operation Performed - Horizontal |
| 2017-03-15 | Intermediate Casing Operation Performed |
| 2017-03-24 | Well Log Performed |
| 2017-03-28 | Finished Drilling |
| 2017-03-28 | Liner Casing Operation Performed |
| 2017-03-28 | Well Mode changed to Drilled and Cased |
| 2017-03-29 | Rig Released |
| 2017-05-11 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-05-12 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-05-15 | Well Began Production |
| 2017-05-15 | Well Fluid changed to Crude Oil |
| 2017-05-15 | Well Mode changed to Pumping |
| 2017-05-19 | Well Log Performed |
| 2017-05-20 | Well Log Performed |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2017-03-08 | Excalibur Drilling Ltd. | 6 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2017-03-11 | 1591.00 | Deviate (5 - 79 degrees) |
| 2017-03-13 | 2036.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2017-05-11 | Multi-Stage Fracture | 4170.00 | 4170.80 | 0 |
| 2017-05-11 | Multi-Stage Fracture | 3690.80 | 3692.70 | 0 |
| 2017-05-11 | Multi-Stage Fracture | 3640.30 | 3642.10 | 0 |
| 2017-05-11 | Multi-Stage Fracture | 3567.20 | 3569.10 | 0 |
| 2017-05-11 | Multi-Stage Fracture | 3493.20 | 3495.10 | 0 |
| 2017-05-11 | Multi-Stage Fracture | 3419.40 | 3421.30 | 0 |
| 2017-05-11 | Multi-Stage Fracture | 3345.40 | 3347.30 | 0 |
| 2017-05-11 | Multi-Stage Fracture | 3306.10 | 3308.00 | 0 |
| 2017-05-11 | Multi-Stage Fracture | 3095.60 | 3097.50 | 0 |
| 2017-05-11 | Multi-Stage Fracture | 3056.20 | 3058.10 | 0 |
| 2017-05-11 | Multi-Stage Fracture | 2982.60 | 2984.50 | 0 |
| 2017-05-11 | Multi-Stage Fracture | 4155.40 | 4157.30 | 0 |
| 2017-05-11 | Multi-Stage Fracture | 2909.40 | 2911.30 | 0 |
| 2017-05-11 | Multi-Stage Fracture | 2836.40 | 2838.30 | 0 |
| 2017-05-11 | Multi-Stage Fracture | 2762.90 | 2764.80 | 0 |
| 2017-05-11 | Multi-Stage Fracture | 2689.70 | 2691.60 | 0 |
| 2017-05-11 | Multi-Stage Fracture | 2512.90 | 2514.80 | 0 |
| 2017-05-12 | Multi-Stage Fracture | 2473.70 | 2475.60 | 0 |
| 2017-05-12 | Multi-Stage Fracture | 2399.90 | 2401.80 | 0 |
| 2017-05-12 | Multi-Stage Fracture | 2246.00 | 2247.90 | 0 |
| 2017-05-12 | Multi-Stage Fracture | 2206.60 | 2208.50 | 0 |
| 2017-05-12 | Multi-Stage Fracture | 2167.50 | 2169.40 | 0 |
| 2017-05-11 | Multi-Stage Fracture | 4104.50 | 4106.40 | 0 |
| 2017-05-12 | Multi-Stage Fracture | 2116.90 | 2118.80 | 0 |
| 2017-05-11 | Multi-Stage Fracture | 4019.10 | 4021.00 | 0 |
| 2017-05-11 | Multi-Stage Fracture | 3967.80 | 3969.70 | 0 |
| 2017-05-11 | Multi-Stage Fracture | 3905.50 | 3907.40 | 0 |
| 2017-05-11 | Multi-Stage Fracture | 3843.20 | 3845.10 | 0 |
| 2017-05-11 | Multi-Stage Fracture | 3780.60 | 3782.50 | 0 |
| 2017-05-11 | Multi-Stage Fracture | 3718.50 | 3720.40 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2017-05-11 | 2017-05-12 | 1,908 | 3,540 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | water | Not Available | 100 | 85.3169 | N/A | |||
| Sand 20/40 | Trican | silica crystalline | 14808-60-7 | 100 | 10.7775 | N/A | ||
| Sand 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 3.6541 | N/A | ||
| AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0203 | N/A | |
| 2-mercaptoethanol | 60-24-2 | 100 | 0.0203 | N/A | ||||
| dibromoacetonitrile | 3252-43-5 | 100 | 0.0203 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0203 | N/A | ||||
| sodium bromide | 7647-15-6 | 100 | 0.0203 | N/A | ||||
| CC-8 | Trican | Clay Control | choline chloride | 67-48-1 | 100 | 0.1595 | N/A | |
| non-hazardous ingredients | Not Available | 100 | 0.1595 | N/A | ||||
| GFR-5D | Trican | Friction Reducer | anionic polyacrylamide | Not Available | 100 | 0.0298 | N/A | |
| S-17X | Trican | Surfactant | 1-hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0415 | N/A | |
| benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol | 26836-07-7 | 100 | 0.0415 | N/A | ||||
| methanol | 67-56-1 | 100 | 0.0415 | N/A | ||||
| methyloxirane polymer with oxirane | 11/6/9003 | 100 | 0.0415 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0415 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2017-04-11 | 2017-04-13 | Surface Water - River | 4600 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2017 | 5544 | 0.0 | 0.0 | 0.0 |
| 2018 | 8276 | 0.0 | 0.0 | 0.0 |
| 2019 | 8704 | 0.0 | 0.0 | 0.0 |
| 2020 | 1706 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-03-29 | No Incident Encountered | 0.00 | 0.00 |
| 2017-05-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]