If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0425061805000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.61505,"lon":-114.830671,"icon":""}]} |
| Location: 00/05-18-042-06W5/0 | |
| Location Alias: 00/05-18-42-06 W5M | |
| Location Alias 2: 00/05-18-042-06 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 042 | |
| Meridian: 5 | |
| Range: 06 | |
| Section: 18 | |
| County/Municipality: Clearwater County | |
| Well Name: ENTRADA HZ WILLGR 5-18-42-6 | |
| Operator Name: Entrada Resources Inc. | |
| License Number: 0494974 | |
| License Date: 2019-06-25 | |
| License Status: Issued | |
| Spud Date: 2019-07-30 | |
| Final Drill Date: 2019-08-06 | |
| Well Total Depth: 4009.00 m | |
| Surface Hole Latitude: 52.615050 | |
| Surface Hole Longitude: -114.830671 |
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2019-07-30 | Ironhand Drilling Inc. | 7 | Drill To LD |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2019-08-01 | 679.80 | Deviate (5 - 79 degrees) |
| 2019-08-03 | 2111.50 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2019-08-26 | Multi-Stage Fracture | 3977.80 | 3978.80 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 3634.70 | 3635.70 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 3593.50 | 3594.50 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 3551.10 | 3552.10 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 3522.00 | 3523.00 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 3479.20 | 3480.20 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 3436.50 | 3437.50 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 3406.50 | 3407.50 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 3363.90 | 3364.90 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 3321.90 | 3322.90 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 3291.80 | 3292.80 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 3935.30 | 3936.30 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 3249.10 | 3250.00 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 3206.40 | 3207.30 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 3176.30 | 3177.20 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 3133.50 | 3134.50 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 3090.70 | 3091.70 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 3060.60 | 3061.60 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 3018.90 | 3019.90 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 2976.20 | 2977.20 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 2946.20 | 2947.10 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 2903.50 | 2904.50 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 3892.90 | 3893.90 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 2860.90 | 2861.90 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 2831.70 | 2832.70 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 2789.30 | 2790.20 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 2746.70 | 2747.70 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 2717.10 | 2718.10 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 2674.40 | 2675.40 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 2631.80 | 2632.70 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 2601.80 | 2602.80 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 2559.30 | 2560.30 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 2517.00 | 2517.90 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 3863.00 | 3863.90 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 2487.10 | 2488.10 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 2445.10 | 2446.10 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 2402.60 | 2403.60 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 2373.10 | 2374.10 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 2330.70 | 2331.70 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 2288.60 | 2289.60 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 2258.80 | 2259.80 | 0 |
| 2019-08-27 | Multi-Stage Fracture | 2229.20 | 2230.20 | 0 |
| 2019-08-27 | Multi-Stage Fracture | 2199.90 | 2200.90 | 0 |
| 2019-08-27 | Multi-Stage Fracture | 2169.90 | 2170.90 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 3820.50 | 3821.50 | 0 |
| 2019-08-27 | Multi-Stage Fracture | 2140.80 | 2141.80 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 3778.40 | 3779.30 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 3748.80 | 3749.80 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 3706.80 | 3707.70 | 0 |
| 2019-08-26 | Multi-Stage Fracture | 3664.60 | 3665.60 | 0 |
For data sources see[5]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2019-08-26 | 2019-08-27 | 2,007 | 5,320 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | 7732-18-5 | 100 | 93.563 | N/A | |||
| 20/40 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 3.1876 | N/A | ||
| 30/50 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 3.3768 | N/A | ||
| ELECIDE - 2L | Element | Bactericide/Biocide | 2-Dibromo. 3-Nitrilopropionamide | 10222-01-2 | 100 | 0.0103 | N/A | |
| Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0103 | N/A | ||||
| ELECC-1 | Element | Clay Control | 2-Hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.0967 | N/A | |
| Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0967 | N/A | ||||
| ELEFR-3A | Element | Friction Reducer | Non-hazardous Ingredients | Not Available | 100 | 0.0668 | N/A | |
| Tergitol 15-S-20 | 68131-40-8 | 100 | 0.0668 | N/A | ||||
| ELESurf-3 | Element | Surfactant | Isopropyl alcohol | 67-63-0 | 100 | 0.0967 | N/A | |
| Methanol | 67-56-1 | 100 | 0.0967 | N/A | ||||
| Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0967 | N/A |
For data sources see[6]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2019-08-17 | 2019-08-19 | Surface Water - Runoff | 6370 |
For data sources see[7]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2019 | 2801 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2019-08-08 | No Incident Encountered | 0.00 | 0.00 |
| 2019-09-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]