X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425061805000

Well Details

Well ID: 0425061805000
Loading map...
Location: 00/05-18-042-06W5/0
Location Alias: 00/05-18-42-06 W5M
Location Alias 2: 00/05-18-042-06 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 06
Section: 18
County/Municipality: Clearwater County
Well Name: ENTRADA HZ WILLGR 5-18-42-6
Operator Name: Entrada Resources Inc.
License Number: 0494974
License Date: 2019-06-25
License Status: Issued
Spud Date: 2019-07-30
Final Drill Date: 2019-08-06
Well Total Depth: 4009.00 m
Surface Hole Latitude: 52.615050
Surface Hole Longitude: -114.830671

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-07-30 Ironhand Drilling Inc. 7 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2019-08-01 679.80 Deviate (5 - 79 degrees)
2019-08-03 2111.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-08-26 Multi-Stage Fracture 3977.80 3978.80 0
2019-08-26 Multi-Stage Fracture 3634.70 3635.70 0
2019-08-26 Multi-Stage Fracture 3593.50 3594.50 0
2019-08-26 Multi-Stage Fracture 3551.10 3552.10 0
2019-08-26 Multi-Stage Fracture 3522.00 3523.00 0
2019-08-26 Multi-Stage Fracture 3479.20 3480.20 0
2019-08-26 Multi-Stage Fracture 3436.50 3437.50 0
2019-08-26 Multi-Stage Fracture 3406.50 3407.50 0
2019-08-26 Multi-Stage Fracture 3363.90 3364.90 0
2019-08-26 Multi-Stage Fracture 3321.90 3322.90 0
2019-08-26 Multi-Stage Fracture 3291.80 3292.80 0
2019-08-26 Multi-Stage Fracture 3935.30 3936.30 0
2019-08-26 Multi-Stage Fracture 3249.10 3250.00 0
2019-08-26 Multi-Stage Fracture 3206.40 3207.30 0
2019-08-26 Multi-Stage Fracture 3176.30 3177.20 0
2019-08-26 Multi-Stage Fracture 3133.50 3134.50 0
2019-08-26 Multi-Stage Fracture 3090.70 3091.70 0
2019-08-26 Multi-Stage Fracture 3060.60 3061.60 0
2019-08-26 Multi-Stage Fracture 3018.90 3019.90 0
2019-08-26 Multi-Stage Fracture 2976.20 2977.20 0
2019-08-26 Multi-Stage Fracture 2946.20 2947.10 0
2019-08-26 Multi-Stage Fracture 2903.50 2904.50 0
2019-08-26 Multi-Stage Fracture 3892.90 3893.90 0
2019-08-26 Multi-Stage Fracture 2860.90 2861.90 0
2019-08-26 Multi-Stage Fracture 2831.70 2832.70 0
2019-08-26 Multi-Stage Fracture 2789.30 2790.20 0
2019-08-26 Multi-Stage Fracture 2746.70 2747.70 0
2019-08-26 Multi-Stage Fracture 2717.10 2718.10 0
2019-08-26 Multi-Stage Fracture 2674.40 2675.40 0
2019-08-26 Multi-Stage Fracture 2631.80 2632.70 0
2019-08-26 Multi-Stage Fracture 2601.80 2602.80 0
2019-08-26 Multi-Stage Fracture 2559.30 2560.30 0
2019-08-26 Multi-Stage Fracture 2517.00 2517.90 0
2019-08-26 Multi-Stage Fracture 3863.00 3863.90 0
2019-08-26 Multi-Stage Fracture 2487.10 2488.10 0
2019-08-26 Multi-Stage Fracture 2445.10 2446.10 0
2019-08-26 Multi-Stage Fracture 2402.60 2403.60 0
2019-08-26 Multi-Stage Fracture 2373.10 2374.10 0
2019-08-26 Multi-Stage Fracture 2330.70 2331.70 0
2019-08-26 Multi-Stage Fracture 2288.60 2289.60 0
2019-08-26 Multi-Stage Fracture 2258.80 2259.80 0
2019-08-27 Multi-Stage Fracture 2229.20 2230.20 0
2019-08-27 Multi-Stage Fracture 2199.90 2200.90 0
2019-08-27 Multi-Stage Fracture 2169.90 2170.90 0
2019-08-26 Multi-Stage Fracture 3820.50 3821.50 0
2019-08-27 Multi-Stage Fracture 2140.80 2141.80 0
2019-08-26 Multi-Stage Fracture 3778.40 3779.30 0
2019-08-26 Multi-Stage Fracture 3748.80 3749.80 0
2019-08-26 Multi-Stage Fracture 3706.80 3707.70 0
2019-08-26 Multi-Stage Fracture 3664.60 3665.60 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-08-26 2019-08-27 2,007 5,320 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 93.563 N/A
20/40 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 3.1876 N/A
30/50 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 3.3768 N/A
ELECIDE - 2L Element Bactericide/Biocide 2-Dibromo. 3-Nitrilopropionamide 10222-01-2 100 0.0103 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0103 N/A
ELECC-1 Element Clay Control 2-Hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.0967 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0967 N/A
ELEFR-3A Element Friction Reducer Non-hazardous Ingredients Not Available 100 0.0668 N/A
Tergitol 15-S-20 68131-40-8 100 0.0668 N/A
ELESurf-3 Element Surfactant Isopropyl alcohol 67-63-0 100 0.0967 N/A
Methanol 67-56-1 100 0.0967 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0967 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-08-17 2019-08-19 Surface Water - Runoff 6370

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 2801 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-08-08 No Incident Encountered 0.00 0.00
2019-09-04 No Incident Encountered 0.00 0.00

For data sources see[9]

References