X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425061316002

Well Details

Well ID: 0425061316002
Loading map...
Location: 00/16-13-042-06W5/2
Location Alias: 00/16-13-42-06 W5M
Location Alias 2: 00/16-13-042-06 W5/02
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 06
Section: 13
County/Municipality: Clearwater County
Well Name: BEC WILLGR 16-13-42-6
Operator Name: Bonavista Energy Corporation
License Number: 0009513
License Date: 1955-06-02
License Status: Suspension
Spud Date: 1955-06-10
Final Drill Date: 1955-07-26
Well Total Depth: 2476.20 m
Surface Hole Latitude: 52.623128
Surface Hole Longitude: -114.724575

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-06-02 Obtained License
1955-06-10 Lost Circulation Occurred
1955-07-26 Finished Drilling
1955-07-26 Well Mode changed to Drilled and Cased
1955-07-29 Drill Stem Test Performed
1955-07-30 Drill Stem Test Performed
1955-08-02 Well Log Performed
1955-08-03 Drill Stem Test Performed
1955-08-06 Production Casing Operation Performed
1955-08-10 Well Log Performed
1955-08-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-08-11 Perforation Treatment Performed - Jet Perforation
1955-08-20 Perforation Treatment Performed - Bullet Perforation
1955-08-20 Perforation Treatment Performed - Jet Perforation
1955-08-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-08-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1955-08-25 Perforation Treatment Performed - Jet Perforation
1967-01-20 Perforation Treatment Performed - Jet Perforation
1967-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-01-21 Perforation Treatment Performed - Fractured
1967-01-23 Well Began Production
1967-01-23 Well Fluid changed to Crude Oil
1967-01-23 Well Mode changed to Flowing
1982-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-03-29 Perforation Treatment Performed - Fractured
1983-03-14 Perforation Treatment Performed - Fractured
1986-01-14 Perforation Treatment Performed - Cement Squeeze
1986-01-14 Plug Back Performed
1986-01-14 Well Fluid changed to Crude Oil
1986-01-14 Well Mode changed to Flowing
1986-02-06 Perforation Treatment Performed - Fractured
1986-08-27 Well Fluid changed to Crude Oil
1986-08-27 Well Mode changed to Suspended
1988-01-06 Well Fluid changed to Crude Oil
1988-01-06 Well Mode changed to Flowing
1999-08-15 Well Fluid changed to Crude Oil
1999-08-15 Well Mode changed to Suspended
1999-08-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-08-19 Plug Back Performed
1999-08-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-08-20 Plug Back Performed
1999-08-24 Perforation Treatment Performed - Jet Perforation
1999-08-25 Perforation Treatment Performed - Jet Perforation
1999-09-07 Well Fluid changed to Crude Oil
1999-09-07 Well Mode changed to Suspended
1999-09-08 Well Fluid changed to Crude Oil
1999-09-08 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1955-08-11 Perforation 2430.80 2438.40 13
1967-01-21 Acid Treatment 2166.50 2167.10 0
1967-01-21 Fracture 2166.50 2167.10 0
1982-03-23 Acid Treatment 1860.80 1862.60 0
1982-03-29 Fracture 1860.80 1862.60 0
1983-03-14 Fracture 1860.80 1862.60 0
1986-01-14 Cement Squeeze 1860.80 1862.60 0
1986-02-06 Fracture 2166.50 2167.10 0
1999-08-19 Packing Device Capped w/Cement 2152.00 2160.00 0
1999-08-20 Packing Device Capped w/Cement 1837.00 1845.00 0
1999-08-24 Perforation 1509.40 1511.00 13
1955-08-11 Perforation 2432.60 2438.40 13
1999-08-24 Perforation 1504.50 1506.30 13
1999-08-25 Perforation 1399.00 1402.00 13
1955-08-11 Acid Treatment 2430.80 2438.40 0
1955-08-20 Perforation 2441.40 2446.90 13
1955-08-20 Bullet Perforation 2441.40 2446.90 13
1955-08-21 Acid Treatment 2441.40 2446.90 0
1955-08-25 Perforation 1860.80 1862.60 13
1955-08-25 Packing Device Capped w/Cement 2389.60 2389.60 0
1967-01-20 Perforation 2166.50 2167.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 1897 0.0 0.0 0.0
1968 3097 0.0 0.0 0.0
1969 2156 0.0 0.0 0.0
1970 1461 0.0 0.0 0.0
1971 1647 0.0 0.0 0.0
1972 2100 0.0 0.0 0.0
1973 2876 0.0 0.0 0.0
1974 3972 0.0 0.0 0.0
1975 4204 0.0 0.0 0.0
1976 4734 0.0 0.0 0.0
1977 8119 0.0 0.0 0.0
1978 7322 0.0 0.0 0.0
1979 8157 0.0 0.0 0.0
1980 7960 0.0 0.0 0.0
1981 6481 0.0 0.0 0.0
1982 1807 0.0 0.0 0.0
1983 3604 0.0 0.0 0.0
1984 594 0.0 0.0 0.0
1985 3027 0.0 0.0 0.0
1986 3843 0.0 0.0 0.0
1988 8371 0.0 0.0 0.0
1989 7877 0.0 0.0 0.0
1990 8662 0.0 0.0 0.0
1991 8382 0.0 0.0 0.0
1992 6973 0.0 0.0 0.0
1993 6597 0.0 0.0 0.0
1994 7693 0.0 0.0 0.0
1995 8495 0.0 0.0 0.0
1996 8375 0.0 0.0 0.0
1997 3780 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1955-06-10 Lost Circulation 9.10 48.70

For data sources see[6]

References