If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0425050713000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.577315,"lon":-114.71455,"icon":""}]} |
Location: 00/13-07-042-05W5/0 | |
Location Alias: 00/13-07-42-05 W5M | |
Location Alias 2: 00/13-07-042-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 5 | |
Range: 05 | |
Section: 07 | |
County/Municipality: Clearwater County | |
Well Name: YANGARRA HZ WILLGR 13-7-42-5 | |
Operator Name: Yangarra Resources Corp. | |
License Number: 0491914 | |
License Date: 2018-11-08 | |
License Status: Issued | |
Spud Date: 2018-12-30 | |
Final Drill Date: 2019-01-11 | |
Well Total Depth: 5305.00 m | |
Surface Hole Latitude: 52.577315 | |
Surface Hole Longitude: -114.714550 |
Date | Event |
---|---|
2018-11-08 | Obtained License |
2019-01-01 | Surface Casing Operation Performed |
2019-01-03 | Direction Drilling Operation Performed - Deviate |
2019-01-05 | Direction Drilling Operation Performed - Horizontal |
2019-01-11 | Finished Drilling |
2019-01-11 | Well Log Performed |
2019-01-11 | Well Mode changed to Drilled and Cased |
2019-01-14 | Production Casing Operation Performed |
2019-01-14 | Rig Released |
2019-01-25 | Well Log Performed |
2019-02-01 | Well Began Production |
2019-02-01 | Well Fluid changed to Crude Oil |
2019-02-01 | Well Mode changed to Flowing |
2019-02-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-02-10 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-12-30 | Stampede Drilling A Division Of Matrix Energy Technologi | 5 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-01-03 | 1292.70 | Deviate (5 - 79 degrees) |
2019-01-05 | 2196.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-02-06 | Multi-Stage Fracture | 5264.40 | 5264.50 | 0 |
2019-02-07 | Multi-Stage Fracture | 5099.60 | 5099.70 | 0 |
2019-02-08 | Multi-Stage Fracture | 3453.50 | 3453.60 | 0 |
2019-02-09 | Multi-Stage Fracture | 3435.10 | 3435.20 | 0 |
2019-02-09 | Multi-Stage Fracture | 3420.30 | 3420.40 | 0 |
2019-02-09 | Multi-Stage Fracture | 3401.90 | 3402.00 | 0 |
2019-02-09 | Multi-Stage Fracture | 3383.90 | 3384.00 | 0 |
2019-02-09 | Multi-Stage Fracture | 3365.70 | 3365.80 | 0 |
2019-02-09 | Multi-Stage Fracture | 3347.40 | 3347.50 | 0 |
2019-02-09 | Multi-Stage Fracture | 3330.10 | 3330.20 | 0 |
2019-02-09 | Multi-Stage Fracture | 3311.70 | 3311.80 | 0 |
2019-02-09 | Multi-Stage Fracture | 3293.40 | 3293.50 | 0 |
2019-02-07 | Multi-Stage Fracture | 5081.20 | 5081.30 | 0 |
2019-02-09 | Multi-Stage Fracture | 3275.00 | 3275.10 | 0 |
2019-02-09 | Multi-Stage Fracture | 3256.60 | 3256.70 | 0 |
2019-02-09 | Multi-Stage Fracture | 3241.50 | 3241.60 | 0 |
2019-02-09 | Multi-Stage Fracture | 3223.10 | 3223.20 | 0 |
2019-02-09 | Multi-Stage Fracture | 3204.80 | 3204.90 | 0 |
2019-02-09 | Multi-Stage Fracture | 3186.40 | 3186.50 | 0 |
2019-02-09 | Multi-Stage Fracture | 3168.10 | 3168.20 | 0 |
2019-02-09 | Multi-Stage Fracture | 3149.70 | 3149.80 | 0 |
2019-02-09 | Multi-Stage Fracture | 3131.30 | 3131.40 | 0 |
2019-02-09 | Multi-Stage Fracture | 3112.90 | 3113.00 | 0 |
2019-02-07 | Multi-Stage Fracture | 5062.90 | 5063.00 | 0 |
2019-02-09 | Multi-Stage Fracture | 3095.80 | 3095.90 | 0 |
2019-02-09 | Multi-Stage Fracture | 3078.00 | 3078.10 | 0 |
2019-02-09 | Multi-Stage Fracture | 3059.60 | 3059.70 | 0 |
2019-02-09 | Multi-Stage Fracture | 3041.20 | 3041.30 | 0 |
2019-02-09 | Multi-Stage Fracture | 3022.90 | 3023.00 | 0 |
2019-02-09 | Multi-Stage Fracture | 3004.50 | 3004.60 | 0 |
2019-02-09 | Multi-Stage Fracture | 2986.90 | 2987.00 | 0 |
2019-02-09 | Multi-Stage Fracture | 2968.50 | 2968.60 | 0 |
2019-02-09 | Multi-Stage Fracture | 2953.80 | 2953.90 | 0 |
2019-02-09 | Multi-Stage Fracture | 2935.40 | 2935.50 | 0 |
2019-02-07 | Multi-Stage Fracture | 5044.50 | 5044.60 | 0 |
2019-02-09 | Multi-Stage Fracture | 2917.10 | 2917.20 | 0 |
2019-02-09 | Multi-Stage Fracture | 2898.70 | 2898.80 | 0 |
2019-02-09 | Multi-Stage Fracture | 2880.30 | 2880.40 | 0 |
2019-02-09 | Multi-Stage Fracture | 2862.00 | 2862.10 | 0 |
2019-02-09 | Multi-Stage Fracture | 2844.40 | 2844.50 | 0 |
2019-02-09 | Multi-Stage Fracture | 2826.10 | 2826.20 | 0 |
2019-02-09 | Multi-Stage Fracture | 2807.70 | 2807.80 | 0 |
2019-02-09 | Multi-Stage Fracture | 2789.40 | 2789.50 | 0 |
2019-02-09 | Multi-Stage Fracture | 2771.00 | 2771.10 | 0 |
2019-02-09 | Multi-Stage Fracture | 2752.60 | 2752.70 | 0 |
2019-02-07 | Multi-Stage Fracture | 5028.80 | 5028.90 | 0 |
2019-02-09 | Multi-Stage Fracture | 2734.20 | 2734.30 | 0 |
2019-02-09 | Multi-Stage Fracture | 2715.90 | 2716.00 | 0 |
2019-02-09 | Multi-Stage Fracture | 2697.60 | 2697.70 | 0 |
2019-02-10 | Multi-Stage Fracture | 2679.70 | 2679.80 | 0 |
2019-02-10 | Multi-Stage Fracture | 2661.40 | 2661.50 | 0 |
2019-02-10 | Multi-Stage Fracture | 2643.00 | 2643.10 | 0 |
2019-02-10 | Multi-Stage Fracture | 2624.70 | 2624.80 | 0 |
2019-02-10 | Multi-Stage Fracture | 2606.40 | 2606.50 | 0 |
2019-02-10 | Multi-Stage Fracture | 2590.50 | 2590.60 | 0 |
2019-02-10 | Multi-Stage Fracture | 2572.40 | 2572.50 | 0 |
2019-02-07 | Multi-Stage Fracture | 5010.50 | 5010.60 | 0 |
2019-02-10 | Multi-Stage Fracture | 2554.00 | 2554.10 | 0 |
2019-02-10 | Multi-Stage Fracture | 2535.60 | 2535.70 | 0 |
2019-02-10 | Multi-Stage Fracture | 2517.20 | 2517.30 | 0 |
2019-02-10 | Multi-Stage Fracture | 2499.00 | 2499.10 | 0 |
2019-02-10 | Multi-Stage Fracture | 2480.60 | 2480.70 | 0 |
2019-02-10 | Multi-Stage Fracture | 2462.40 | 2462.50 | 0 |
2019-02-10 | Multi-Stage Fracture | 2444.00 | 2444.10 | 0 |
2019-02-10 | Multi-Stage Fracture | 2425.60 | 2425.70 | 0 |
2019-02-10 | Multi-Stage Fracture | 2407.20 | 2407.30 | 0 |
2019-02-10 | Multi-Stage Fracture | 2388.90 | 2389.00 | 0 |
2019-02-07 | Multi-Stage Fracture | 4993.20 | 4993.30 | 0 |
2019-02-10 | Multi-Stage Fracture | 2370.50 | 2370.60 | 0 |
2019-02-10 | Multi-Stage Fracture | 2352.30 | 2352.40 | 0 |
2019-02-10 | Multi-Stage Fracture | 2333.90 | 2334.00 | 0 |
2019-02-10 | Multi-Stage Fracture | 2315.50 | 2315.60 | 0 |
2019-02-10 | Multi-Stage Fracture | 2297.20 | 2297.30 | 0 |
2019-02-10 | Multi-Stage Fracture | 2278.60 | 2278.70 | 0 |
2019-02-10 | Multi-Stage Fracture | 2260.20 | 2260.30 | 0 |
2019-02-10 | Multi-Stage Fracture | 2260.2 | 2260.3 | 0 |
2019-02-07 | Multi-Stage Fracture | 4974.80 | 4974.90 | 0 |
2019-02-07 | Multi-Stage Fracture | 4956.60 | 4956.70 | 0 |
2019-02-07 | Multi-Stage Fracture | 4938.30 | 4938.40 | 0 |
2019-02-06 | Multi-Stage Fracture | 5246.00 | 5246.10 | 0 |
2019-02-07 | Multi-Stage Fracture | 4919.90 | 4920.00 | 0 |
2019-02-07 | Multi-Stage Fracture | 4901.60 | 4901.70 | 0 |
2019-02-07 | Multi-Stage Fracture | 4883.20 | 4883.30 | 0 |
2019-02-07 | Multi-Stage Fracture | 4864.90 | 4865.00 | 0 |
2019-02-07 | Multi-Stage Fracture | 4849.10 | 4849.20 | 0 |
2019-02-07 | Multi-Stage Fracture | 4830.70 | 4830.80 | 0 |
2019-02-07 | Multi-Stage Fracture | 4813.00 | 4813.10 | 0 |
2019-02-07 | Multi-Stage Fracture | 4794.60 | 4794.70 | 0 |
2019-02-07 | Multi-Stage Fracture | 4776.20 | 4776.30 | 0 |
2019-02-07 | Multi-Stage Fracture | 4757.90 | 4758.00 | 0 |
2019-02-06 | Multi-Stage Fracture | 5227.70 | 5227.80 | 0 |
2019-02-07 | Multi-Stage Fracture | 4739.50 | 4739.60 | 0 |
2019-02-07 | Multi-Stage Fracture | 4721.20 | 4721.30 | 0 |
2019-02-07 | Multi-Stage Fracture | 4702.80 | 4702.90 | 0 |
2019-02-07 | Multi-Stage Fracture | 4684.60 | 4684.70 | 0 |
2019-02-07 | Multi-Stage Fracture | 4649.30 | 4649.40 | 0 |
2019-02-07 | Multi-Stage Fracture | 4630.90 | 4631.00 | 0 |
2019-02-07 | Multi-Stage Fracture | 4612.60 | 4612.70 | 0 |
2019-02-07 | Multi-Stage Fracture | 4594.20 | 4594.30 | 0 |
2019-02-07 | Multi-Stage Fracture | 4576.00 | 4576.10 | 0 |
2019-02-07 | Multi-Stage Fracture | 4557.70 | 4557.80 | 0 |
2019-02-06 | Multi-Stage Fracture | 5209.70 | 5209.80 | 0 |
2019-02-07 | Multi-Stage Fracture | 4539.30 | 4539.40 | 0 |
2019-02-07 | Multi-Stage Fracture | 4520.90 | 4521.00 | 0 |
2019-02-07 | Multi-Stage Fracture | 4502.60 | 4502.70 | 0 |
2019-02-07 | Multi-Stage Fracture | 4484.50 | 4484.60 | 0 |
2019-02-07 | Multi-Stage Fracture | 4466.10 | 4466.20 | 0 |
2019-02-07 | Multi-Stage Fracture | 4447.80 | 4447.90 | 0 |
2019-02-07 | Multi-Stage Fracture | 4429.40 | 4429.50 | 0 |
2019-02-07 | Multi-Stage Fracture | 4413.60 | 4413.70 | 0 |
2019-02-07 | Multi-Stage Fracture | 4396.50 | 4396.60 | 0 |
2019-02-08 | Multi-Stage Fracture | 4378.20 | 4378.30 | 0 |
2019-02-06 | Multi-Stage Fracture | 5191.30 | 5191.40 | 0 |
2019-02-08 | Multi-Stage Fracture | 4359.80 | 4359.90 | 0 |
2019-02-08 | Multi-Stage Fracture | 4341.40 | 4341.50 | 0 |
2019-02-08 | Multi-Stage Fracture | 4323.00 | 4323.10 | 0 |
2019-02-08 | Multi-Stage Fracture | 4304.70 | 4304.80 | 0 |
2019-02-08 | Multi-Stage Fracture | 4286.40 | 4286.50 | 0 |
2019-02-08 | Multi-Stage Fracture | 4270.50 | 4270.60 | 0 |
2019-02-08 | Multi-Stage Fracture | 4252.10 | 4252.20 | 0 |
2019-02-08 | Multi-Stage Fracture | 4233.70 | 4233.80 | 0 |
2019-02-08 | Multi-Stage Fracture | 4215.40 | 4215.50 | 0 |
2019-02-08 | Multi-Stage Fracture | 4197.70 | 4197.80 | 0 |
2019-02-06 | Multi-Stage Fracture | 5173.00 | 5173.10 | 0 |
2019-02-08 | Multi-Stage Fracture | 4179.40 | 4179.50 | 0 |
2019-02-08 | Multi-Stage Fracture | 4161.00 | 4161.10 | 0 |
2019-02-08 | Multi-Stage Fracture | 4142.70 | 4142.80 | 0 |
2019-02-08 | Multi-Stage Fracture | 4124.30 | 4124.40 | 0 |
2019-02-08 | Multi-Stage Fracture | 4106.00 | 4106.10 | 0 |
2019-02-08 | Multi-Stage Fracture | 4087.60 | 4087.70 | 0 |
2019-02-08 | Multi-Stage Fracture | 4069.30 | 4069.40 | 0 |
2019-02-08 | Multi-Stage Fracture | 4051.30 | 4051.40 | 0 |
2019-02-08 | Multi-Stage Fracture | 4034.90 | 4035.00 | 0 |
2019-02-08 | Multi-Stage Fracture | 4016.50 | 4016.60 | 0 |
2019-02-06 | Multi-Stage Fracture | 5154.60 | 5154.70 | 0 |
2019-02-08 | Multi-Stage Fracture | 3999.60 | 3999.70 | 0 |
2019-02-08 | Multi-Stage Fracture | 3981.20 | 3981.30 | 0 |
2019-02-08 | Multi-Stage Fracture | 3962.80 | 3962.90 | 0 |
2019-02-08 | Multi-Stage Fracture | 3944.40 | 3944.50 | 0 |
2019-02-08 | Multi-Stage Fracture | 3926.10 | 3926.20 | 0 |
2019-02-08 | Multi-Stage Fracture | 3907.70 | 3907.80 | 0 |
2019-02-08 | Multi-Stage Fracture | 3889.30 | 3889.40 | 0 |
2019-02-08 | Multi-Stage Fracture | 3871.00 | 3871.10 | 0 |
2019-02-08 | Multi-Stage Fracture | 3852.60 | 3852.70 | 0 |
2019-02-08 | Multi-Stage Fracture | 3834.40 | 3834.50 | 0 |
2019-02-06 | Multi-Stage Fracture | 5136.30 | 5136.40 | 0 |
2019-02-08 | Multi-Stage Fracture | 3816.70 | 3816.80 | 0 |
2019-02-08 | Multi-Stage Fracture | 3798.30 | 3798.40 | 0 |
2019-02-08 | Multi-Stage Fracture | 3779.90 | 3780.00 | 0 |
2019-02-08 | Multi-Stage Fracture | 3761.60 | 3761.70 | 0 |
2019-02-08 | Multi-Stage Fracture | 3743.20 | 3743.30 | 0 |
2019-02-08 | Multi-Stage Fracture | 3724.80 | 3724.90 | 0 |
2019-02-08 | Multi-Stage Fracture | 3706.40 | 3706.50 | 0 |
2019-02-08 | Multi-Stage Fracture | 3688.00 | 3688.10 | 0 |
2019-02-08 | Multi-Stage Fracture | 3669.60 | 3669.70 | 0 |
2019-02-08 | Multi-Stage Fracture | 3651.50 | 3651.60 | 0 |
2019-02-07 | Multi-Stage Fracture | 5118.00 | 5118.10 | 0 |
2019-02-08 | Multi-Stage Fracture | 3633.20 | 3633.30 | 0 |
2019-02-08 | Multi-Stage Fracture | 3614.80 | 3614.90 | 0 |
2019-02-08 | Multi-Stage Fracture | 3596.40 | 3596.50 | 0 |
2019-02-08 | Multi-Stage Fracture | 3578.00 | 3578.10 | 0 |
2019-02-08 | Multi-Stage Fracture | 3560.60 | 3560.70 | 0 |
2019-02-08 | Multi-Stage Fracture | 3543.00 | 3543.10 | 0 |
2019-02-08 | Multi-Stage Fracture | 3524.60 | 3524.70 | 0 |
2019-02-08 | Multi-Stage Fracture | 3506.30 | 3506.40 | 0 |
2019-02-08 | Multi-Stage Fracture | 3487.80 | 3487.90 | 0 |
2019-02-08 | Multi-Stage Fracture | 3471.00 | 3471.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-02-06 | 2019-02-10 | 1,866 | 16,314 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 94.6279 | N/A | |||
20/40 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 5.2024 | N/A | ||
30/50 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 0.371 | N/A | ||
ELECIDE - 2L | Element | Bactericide/Biocide | 2-Dibromo. 3-Nitrilopropionamide | 10222-01-2 | 100 | 0.011 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.011 | N/A | ||||
ELECC-1 | Element | Clay Control | 2-Hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.0798 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0798 | N/A | ||||
ELEHV-3 | Element | Friction Reducer | Hydrotreated light paraffinic distillate | 64742-55-8 | 100 | 0.0539 | N/A | |
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0539 | N/A | ||||
ELEFE-3 | Element | Surfactant | Isopropyl alcohol | 67-63-0 | 100 | 0.0643 | N/A | |
Methanol | 67-56-1 | 100 | 0.0643 | N/A | ||||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0643 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-02-07 | 2019-02-10 | Surface Water - Lake | 13329 |
2019-01-22 | 2019-01-22 | Municipal Water | 60 |
2019-01-30 | 2019-02-08 | Oilfield Produced Water | 2364 |
2019-01-30 | 2019-02-09 | Oilfield Produced Water | 454 |
2019-01-30 | 2019-02-09 | Oilfield Produced Water | 268 |
2019-01-30 | 2019-02-10 | Oilfield Produced Water | 216 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 7178 | 0.0 | 0.0 | 0.0 |
2020 | 2157 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-01-14 | No Incident Encountered | 0.00 | 0.00 |
2019-02-12 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]