X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425050713000

Well Details

Well ID: 0425050713000
Loading map...
Location: 00/13-07-042-05W5/0
Location Alias: 00/13-07-42-05 W5M
Location Alias 2: 00/13-07-042-05 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 05
Section: 07
County/Municipality: Clearwater County
Well Name: YANGARRA HZ WILLGR 13-7-42-5
Operator Name: Yangarra Resources Corp.
License Number: 0491914
License Date: 2018-11-08
License Status: Issued
Spud Date: 2018-12-30
Final Drill Date: 2019-01-11
Well Total Depth: 5305.00 m
Surface Hole Latitude: 52.577315
Surface Hole Longitude: -114.714550

For data sources see[1][2]

Well History

Date Event
2018-11-08 Obtained License
2019-01-01 Surface Casing Operation Performed
2019-01-03 Direction Drilling Operation Performed - Deviate
2019-01-05 Direction Drilling Operation Performed - Horizontal
2019-01-11 Finished Drilling
2019-01-11 Well Log Performed
2019-01-11 Well Mode changed to Drilled and Cased
2019-01-14 Production Casing Operation Performed
2019-01-14 Rig Released
2019-01-25 Well Log Performed
2019-02-01 Well Began Production
2019-02-01 Well Fluid changed to Crude Oil
2019-02-01 Well Mode changed to Flowing
2019-02-06 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-07 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-08 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-09 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-10 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-12-30 Stampede Drilling A Division Of Matrix Energy Technologi 5 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-01-03 1292.70 Deviate (5 - 79 degrees)
2019-01-05 2196.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-02-06 Multi-Stage Fracture 5264.40 5264.50 0
2019-02-07 Multi-Stage Fracture 5099.60 5099.70 0
2019-02-08 Multi-Stage Fracture 3453.50 3453.60 0
2019-02-09 Multi-Stage Fracture 3435.10 3435.20 0
2019-02-09 Multi-Stage Fracture 3420.30 3420.40 0
2019-02-09 Multi-Stage Fracture 3401.90 3402.00 0
2019-02-09 Multi-Stage Fracture 3383.90 3384.00 0
2019-02-09 Multi-Stage Fracture 3365.70 3365.80 0
2019-02-09 Multi-Stage Fracture 3347.40 3347.50 0
2019-02-09 Multi-Stage Fracture 3330.10 3330.20 0
2019-02-09 Multi-Stage Fracture 3311.70 3311.80 0
2019-02-09 Multi-Stage Fracture 3293.40 3293.50 0
2019-02-07 Multi-Stage Fracture 5081.20 5081.30 0
2019-02-09 Multi-Stage Fracture 3275.00 3275.10 0
2019-02-09 Multi-Stage Fracture 3256.60 3256.70 0
2019-02-09 Multi-Stage Fracture 3241.50 3241.60 0
2019-02-09 Multi-Stage Fracture 3223.10 3223.20 0
2019-02-09 Multi-Stage Fracture 3204.80 3204.90 0
2019-02-09 Multi-Stage Fracture 3186.40 3186.50 0
2019-02-09 Multi-Stage Fracture 3168.10 3168.20 0
2019-02-09 Multi-Stage Fracture 3149.70 3149.80 0
2019-02-09 Multi-Stage Fracture 3131.30 3131.40 0
2019-02-09 Multi-Stage Fracture 3112.90 3113.00 0
2019-02-07 Multi-Stage Fracture 5062.90 5063.00 0
2019-02-09 Multi-Stage Fracture 3095.80 3095.90 0
2019-02-09 Multi-Stage Fracture 3078.00 3078.10 0
2019-02-09 Multi-Stage Fracture 3059.60 3059.70 0
2019-02-09 Multi-Stage Fracture 3041.20 3041.30 0
2019-02-09 Multi-Stage Fracture 3022.90 3023.00 0
2019-02-09 Multi-Stage Fracture 3004.50 3004.60 0
2019-02-09 Multi-Stage Fracture 2986.90 2987.00 0
2019-02-09 Multi-Stage Fracture 2968.50 2968.60 0
2019-02-09 Multi-Stage Fracture 2953.80 2953.90 0
2019-02-09 Multi-Stage Fracture 2935.40 2935.50 0
2019-02-07 Multi-Stage Fracture 5044.50 5044.60 0
2019-02-09 Multi-Stage Fracture 2917.10 2917.20 0
2019-02-09 Multi-Stage Fracture 2898.70 2898.80 0
2019-02-09 Multi-Stage Fracture 2880.30 2880.40 0
2019-02-09 Multi-Stage Fracture 2862.00 2862.10 0
2019-02-09 Multi-Stage Fracture 2844.40 2844.50 0
2019-02-09 Multi-Stage Fracture 2826.10 2826.20 0
2019-02-09 Multi-Stage Fracture 2807.70 2807.80 0
2019-02-09 Multi-Stage Fracture 2789.40 2789.50 0
2019-02-09 Multi-Stage Fracture 2771.00 2771.10 0
2019-02-09 Multi-Stage Fracture 2752.60 2752.70 0
2019-02-07 Multi-Stage Fracture 5028.80 5028.90 0
2019-02-09 Multi-Stage Fracture 2734.20 2734.30 0
2019-02-09 Multi-Stage Fracture 2715.90 2716.00 0
2019-02-09 Multi-Stage Fracture 2697.60 2697.70 0
2019-02-10 Multi-Stage Fracture 2679.70 2679.80 0
2019-02-10 Multi-Stage Fracture 2661.40 2661.50 0
2019-02-10 Multi-Stage Fracture 2643.00 2643.10 0
2019-02-10 Multi-Stage Fracture 2624.70 2624.80 0
2019-02-10 Multi-Stage Fracture 2606.40 2606.50 0
2019-02-10 Multi-Stage Fracture 2590.50 2590.60 0
2019-02-10 Multi-Stage Fracture 2572.40 2572.50 0
2019-02-07 Multi-Stage Fracture 5010.50 5010.60 0
2019-02-10 Multi-Stage Fracture 2554.00 2554.10 0
2019-02-10 Multi-Stage Fracture 2535.60 2535.70 0
2019-02-10 Multi-Stage Fracture 2517.20 2517.30 0
2019-02-10 Multi-Stage Fracture 2499.00 2499.10 0
2019-02-10 Multi-Stage Fracture 2480.60 2480.70 0
2019-02-10 Multi-Stage Fracture 2462.40 2462.50 0
2019-02-10 Multi-Stage Fracture 2444.00 2444.10 0
2019-02-10 Multi-Stage Fracture 2425.60 2425.70 0
2019-02-10 Multi-Stage Fracture 2407.20 2407.30 0
2019-02-10 Multi-Stage Fracture 2388.90 2389.00 0
2019-02-07 Multi-Stage Fracture 4993.20 4993.30 0
2019-02-10 Multi-Stage Fracture 2370.50 2370.60 0
2019-02-10 Multi-Stage Fracture 2352.30 2352.40 0
2019-02-10 Multi-Stage Fracture 2333.90 2334.00 0
2019-02-10 Multi-Stage Fracture 2315.50 2315.60 0
2019-02-10 Multi-Stage Fracture 2297.20 2297.30 0
2019-02-10 Multi-Stage Fracture 2278.60 2278.70 0
2019-02-10 Multi-Stage Fracture 2260.20 2260.30 0
2019-02-10 Multi-Stage Fracture 2260.2 2260.3 0
2019-02-07 Multi-Stage Fracture 4974.80 4974.90 0
2019-02-07 Multi-Stage Fracture 4956.60 4956.70 0
2019-02-07 Multi-Stage Fracture 4938.30 4938.40 0
2019-02-06 Multi-Stage Fracture 5246.00 5246.10 0
2019-02-07 Multi-Stage Fracture 4919.90 4920.00 0
2019-02-07 Multi-Stage Fracture 4901.60 4901.70 0
2019-02-07 Multi-Stage Fracture 4883.20 4883.30 0
2019-02-07 Multi-Stage Fracture 4864.90 4865.00 0
2019-02-07 Multi-Stage Fracture 4849.10 4849.20 0
2019-02-07 Multi-Stage Fracture 4830.70 4830.80 0
2019-02-07 Multi-Stage Fracture 4813.00 4813.10 0
2019-02-07 Multi-Stage Fracture 4794.60 4794.70 0
2019-02-07 Multi-Stage Fracture 4776.20 4776.30 0
2019-02-07 Multi-Stage Fracture 4757.90 4758.00 0
2019-02-06 Multi-Stage Fracture 5227.70 5227.80 0
2019-02-07 Multi-Stage Fracture 4739.50 4739.60 0
2019-02-07 Multi-Stage Fracture 4721.20 4721.30 0
2019-02-07 Multi-Stage Fracture 4702.80 4702.90 0
2019-02-07 Multi-Stage Fracture 4684.60 4684.70 0
2019-02-07 Multi-Stage Fracture 4649.30 4649.40 0
2019-02-07 Multi-Stage Fracture 4630.90 4631.00 0
2019-02-07 Multi-Stage Fracture 4612.60 4612.70 0
2019-02-07 Multi-Stage Fracture 4594.20 4594.30 0
2019-02-07 Multi-Stage Fracture 4576.00 4576.10 0
2019-02-07 Multi-Stage Fracture 4557.70 4557.80 0
2019-02-06 Multi-Stage Fracture 5209.70 5209.80 0
2019-02-07 Multi-Stage Fracture 4539.30 4539.40 0
2019-02-07 Multi-Stage Fracture 4520.90 4521.00 0
2019-02-07 Multi-Stage Fracture 4502.60 4502.70 0
2019-02-07 Multi-Stage Fracture 4484.50 4484.60 0
2019-02-07 Multi-Stage Fracture 4466.10 4466.20 0
2019-02-07 Multi-Stage Fracture 4447.80 4447.90 0
2019-02-07 Multi-Stage Fracture 4429.40 4429.50 0
2019-02-07 Multi-Stage Fracture 4413.60 4413.70 0
2019-02-07 Multi-Stage Fracture 4396.50 4396.60 0
2019-02-08 Multi-Stage Fracture 4378.20 4378.30 0
2019-02-06 Multi-Stage Fracture 5191.30 5191.40 0
2019-02-08 Multi-Stage Fracture 4359.80 4359.90 0
2019-02-08 Multi-Stage Fracture 4341.40 4341.50 0
2019-02-08 Multi-Stage Fracture 4323.00 4323.10 0
2019-02-08 Multi-Stage Fracture 4304.70 4304.80 0
2019-02-08 Multi-Stage Fracture 4286.40 4286.50 0
2019-02-08 Multi-Stage Fracture 4270.50 4270.60 0
2019-02-08 Multi-Stage Fracture 4252.10 4252.20 0
2019-02-08 Multi-Stage Fracture 4233.70 4233.80 0
2019-02-08 Multi-Stage Fracture 4215.40 4215.50 0
2019-02-08 Multi-Stage Fracture 4197.70 4197.80 0
2019-02-06 Multi-Stage Fracture 5173.00 5173.10 0
2019-02-08 Multi-Stage Fracture 4179.40 4179.50 0
2019-02-08 Multi-Stage Fracture 4161.00 4161.10 0
2019-02-08 Multi-Stage Fracture 4142.70 4142.80 0
2019-02-08 Multi-Stage Fracture 4124.30 4124.40 0
2019-02-08 Multi-Stage Fracture 4106.00 4106.10 0
2019-02-08 Multi-Stage Fracture 4087.60 4087.70 0
2019-02-08 Multi-Stage Fracture 4069.30 4069.40 0
2019-02-08 Multi-Stage Fracture 4051.30 4051.40 0
2019-02-08 Multi-Stage Fracture 4034.90 4035.00 0
2019-02-08 Multi-Stage Fracture 4016.50 4016.60 0
2019-02-06 Multi-Stage Fracture 5154.60 5154.70 0
2019-02-08 Multi-Stage Fracture 3999.60 3999.70 0
2019-02-08 Multi-Stage Fracture 3981.20 3981.30 0
2019-02-08 Multi-Stage Fracture 3962.80 3962.90 0
2019-02-08 Multi-Stage Fracture 3944.40 3944.50 0
2019-02-08 Multi-Stage Fracture 3926.10 3926.20 0
2019-02-08 Multi-Stage Fracture 3907.70 3907.80 0
2019-02-08 Multi-Stage Fracture 3889.30 3889.40 0
2019-02-08 Multi-Stage Fracture 3871.00 3871.10 0
2019-02-08 Multi-Stage Fracture 3852.60 3852.70 0
2019-02-08 Multi-Stage Fracture 3834.40 3834.50 0
2019-02-06 Multi-Stage Fracture 5136.30 5136.40 0
2019-02-08 Multi-Stage Fracture 3816.70 3816.80 0
2019-02-08 Multi-Stage Fracture 3798.30 3798.40 0
2019-02-08 Multi-Stage Fracture 3779.90 3780.00 0
2019-02-08 Multi-Stage Fracture 3761.60 3761.70 0
2019-02-08 Multi-Stage Fracture 3743.20 3743.30 0
2019-02-08 Multi-Stage Fracture 3724.80 3724.90 0
2019-02-08 Multi-Stage Fracture 3706.40 3706.50 0
2019-02-08 Multi-Stage Fracture 3688.00 3688.10 0
2019-02-08 Multi-Stage Fracture 3669.60 3669.70 0
2019-02-08 Multi-Stage Fracture 3651.50 3651.60 0
2019-02-07 Multi-Stage Fracture 5118.00 5118.10 0
2019-02-08 Multi-Stage Fracture 3633.20 3633.30 0
2019-02-08 Multi-Stage Fracture 3614.80 3614.90 0
2019-02-08 Multi-Stage Fracture 3596.40 3596.50 0
2019-02-08 Multi-Stage Fracture 3578.00 3578.10 0
2019-02-08 Multi-Stage Fracture 3560.60 3560.70 0
2019-02-08 Multi-Stage Fracture 3543.00 3543.10 0
2019-02-08 Multi-Stage Fracture 3524.60 3524.70 0
2019-02-08 Multi-Stage Fracture 3506.30 3506.40 0
2019-02-08 Multi-Stage Fracture 3487.80 3487.90 0
2019-02-08 Multi-Stage Fracture 3471.00 3471.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-02-06 2019-02-10 1,866 16,314 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 94.6279 N/A
20/40 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 5.2024 N/A
30/50 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 0.371 N/A
ELECIDE - 2L Element Bactericide/Biocide 2-Dibromo. 3-Nitrilopropionamide 10222-01-2 100 0.011 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.011 N/A
ELECC-1 Element Clay Control 2-Hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.0798 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0798 N/A
ELEHV-3 Element Friction Reducer Hydrotreated light paraffinic distillate 64742-55-8 100 0.0539 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0539 N/A
ELEFE-3 Element Surfactant Isopropyl alcohol 67-63-0 100 0.0643 N/A
Methanol 67-56-1 100 0.0643 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0643 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-02-07 2019-02-10 Surface Water - Lake 13329
2019-01-22 2019-01-22 Municipal Water 60
2019-01-30 2019-02-08 Oilfield Produced Water 2364
2019-01-30 2019-02-09 Oilfield Produced Water 454
2019-01-30 2019-02-09 Oilfield Produced Water 268
2019-01-30 2019-02-10 Oilfield Produced Water 216

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 7178 0.0 0.0 0.0
2020 2157 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-14 No Incident Encountered 0.00 0.00
2019-02-12 No Incident Encountered 0.00 0.00

For data sources see[10]

References