X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425050110000

Well Details

Well ID: 0425050110000
Loading map...
Location: 00/10-01-042-05W5/0
Location Alias: 00/10-01-42-05 W5M
Location Alias 2: 00/10-01-042-05 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 05
Section: 01
County/Municipality: Clearwater County
Well Name: HARVEST GILBY 10-1-42-5
Operator Name: Harvest Operations Corp.
License Number: 0023793
License Date: 1963-02-13
License Status: Suspension
Spud Date: 1963-02-15
Final Drill Date: 1963-03-09
Well Total Depth: 2306.70 m
Surface Hole Latitude: 52.590484
Surface Hole Longitude: -114.586556

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-02-13 Obtained License
1963-03-09 Finished Drilling
1963-03-09 Well Mode changed to Drilled and Cased
1963-03-10 Drill Stem Test Performed
1963-03-11 Drill Stem Test Performed
1963-03-13 Production Casing Operation Performed
1963-05-15 Perforation Treatment Performed - Jet Perforation
1963-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-05-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1963-05-20 Perforation Treatment Performed - Jet Perforation
1963-05-20 Well Began Production
1963-05-20 Well Fluid changed to Crude Oil
1963-05-20 Well Mode changed to Flowing
1992-11-25 Perforation Treatment Performed - Cement Squeeze
1992-11-25 Plug Back Performed
1992-11-25 Well Fluid changed to Crude Oil
1992-11-25 Well Mode changed to Abandoned Zone
1992-11-26 Perforation Treatment Performed - Jet Perforation
1992-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-11-27 Perforation Treatment Performed - Cement Squeeze
1992-11-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-11-30 Perforation Treatment Performed - Jet Perforation
1997-07-21 Perforation Treatment Performed - Jet Perforation
1997-07-21 Well Log Performed
1997-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-01-25 Well Log Performed
1998-07-19 Well Log Performed
2014-08-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-08-05 Perforation Treatment Performed - Cement Plug
2014-08-05 Plug Back Performed
2014-08-05 Well Log Performed
2014-08-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-08-07 Well Log Performed
2014-08-08 Perforation Treatment Performed - Cement Plug
2014-08-08 Perforation Treatment Performed - Jet Perforation
2014-08-08 Perforation Treatment Performed - Remedial Casing
2014-08-08 Well Log Performed
2014-08-11 Perforation Treatment Performed - Cement Plug
2014-08-11 Perforation Treatment Performed - Jet Perforation
2014-08-11 Perforation Treatment Performed - Remedial Casing
2014-08-12 Well Log Performed
2014-08-13 Perforation Treatment Performed - Remedial Casing
2014-08-14 Perforation Treatment Performed - Cement Plug
2014-08-14 Perforation Treatment Performed - Jet Perforation
2014-08-14 Well Log Performed
2014-08-18 Perforation Treatment Performed - Cement Plug
2014-08-18 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-05-15 Perforation 2172.60 2173.80 13
1992-11-30 Acid Treatment 2214.00 2220.00 0
1997-07-21 Perforation 2237.00 2240.00 20
1997-07-21 Perforation 2231.00 2237.00 20
1997-07-23 Acid Treatment 2231.00 2240.00 0
1997-07-28 Acid Treatment 2231.00 2240.00 0
2014-08-05 Cement Plug 2196.00 2208.00 0
2014-08-05 Packing Device Capped w/Cement 2156.00 2168.00 0
2014-08-06 Packing Device Capped w/Cement 1958.00 1970.00 0
2014-08-08 Perforation 1090.50 1092.50 14
2014-08-08 Remedial Casing Cementing 1090.50 1092.50 0
1963-05-18 Acid Treatment 2172.60 2173.80 0
2014-08-08 Cement Plug 1079.00 1094.00 0
2014-08-11 Perforation 576.00 578.00 14
2014-08-11 Remedial Casing Cementing 576.00 578.00 0
2014-08-11 Cement Plug 567.00 580.00 0
2014-08-11 Perforation 564.00 565.00 14
2014-08-13 Remedial Casing Cementing 564.00 565.00 0
2014-08-14 Cement Plug 560.00 566.00 0
2014-08-14 Perforation 247.00 248.00 14
2014-08-18 Remedial Casing Cementing 247.00 248.00 0
2014-08-18 Cement Plug 224.00 249.00 0
1963-05-20 Packing Device Capped w/Cement 2144.30 2169.90 0
1963-05-20 Perforation 1974.50 1976.90 13
1992-11-25 Cement Squeeze 1974.50 1976.90 0
1992-11-26 Perforation 2172.60 2173.80 13
1992-11-27 Acid Treatment 2172.60 2173.80 0
1992-11-27 Cement Squeeze 2172.60 2173.80 0
1992-11-30 Perforation 2214.00 2220.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 696 0.0 0.0 0.0
1968 5154 0.0 0.0 0.0
1969 2936 0.0 0.0 0.0
1970 1787 0.0 0.0 0.0
1971 1007 0.0 0.0 0.0
1972 6840 0.0 0.0 0.0
1973 7374 0.0 0.0 0.0
1974 8195 0.0 0.0 0.0
1975 7891 0.0 0.0 0.0
1976 6574 0.0 0.0 0.0
1977 7914 0.0 0.0 0.0
1978 7784 0.0 0.0 0.0
1979 7937 0.0 0.0 0.0
1980 7573 0.0 0.0 0.0
1981 8236 0.0 0.0 0.0
1982 8087 0.0 0.0 0.0
1983 7657 0.0 0.0 0.0
1984 7242 0.0 0.0 0.0
1985 7649 0.0 0.0 0.0
1986 7708 0.0 0.0 0.0
1987 5398 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-08-18 No Incident Encountered 0.00 0.00

For data sources see[6]

References