X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425042216000

Well Details

Well ID: 0425042216000
Loading map...
Location: 00/16-22-042-04W5/0
Location Alias: 00/16-22-42-04 W5M
Location Alias 2: 00/16-22-042-04 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 04
Section: 22
County/Municipality: Ponoka County
Well Name: BEC HZ WILSONCK 16-22-42-4
Operator Name: Bonavista Energy Corporation
License Number: 0464023
License Date: 2014-01-17
License Status: Issued
Spud Date: 2014-02-20
Final Drill Date: 2014-03-03
Well Total Depth: 4174.00 m
Surface Hole Latitude: 52.619607
Surface Hole Longitude: -114.482683

For data sources see[1][2]

Well History

Date Event
2014-01-17 Obtained License
2014-02-21 Surface Casing Operation Performed
2014-02-23 Direction Drilling Operation Performed - Deviate
2014-02-24 Direction Drilling Operation Performed - Horizontal
2014-02-25 Intermediate Casing Operation Performed
2014-02-25 Well Log Performed
2014-03-03 Finished Drilling
2014-03-03 Well Log Performed
2014-03-03 Well Mode changed to Drilled and Cased
2014-03-05 Liner Casing Operation Performed
2014-03-06 Perforation Treatment Performed - Open-Hole Completion
2014-03-06 Rig Released
2014-03-10 Well Log Performed
2014-03-12 Perforation Treatment Performed - Multi-Stage Fracture
2014-03-13 Well Fluid changed to Gas
2014-03-13 Well Mode changed to Testing
2014-03-21 Well Began Production
2014-03-21 Well Fluid changed to Gas
2014-03-21 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-02-20 Savanna Drilling Corp. 617 N/A Drill To LD
2014-02-20 Savanna Drilling Corp. 617 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-02-23 1816.30 Deviate (5 - 79 degrees)
2014-02-24 2148.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-03-06 Open Hole/Barefoot Completion 4172.00 4174.00 0
2014-03-12 Multi-Stage Fracture 3218.00 3218.10 0
2014-03-12 Multi-Stage Fracture 3098.60 3098.70 0
2014-03-12 Multi-Stage Fracture 2978.50 2978.60 0
2014-03-12 Multi-Stage Fracture 2859.10 2859.20 0
2014-03-12 Multi-Stage Fracture 2740.10 2740.20 0
2014-03-12 Multi-Stage Fracture 2621.30 2621.40 0
2014-03-12 Multi-Stage Fracture 2501.20 2501.30 0
2014-03-12 Multi-Stage Fracture 2381.80 2381.90 0
2014-03-12 Multi-Stage Fracture 2248.40 2248.50 0
2014-03-12 Multi-Stage Fracture 4133.90 4134.00 0
2014-03-12 Multi-Stage Fracture 4056.20 4056.30 0
2014-03-12 Multi-Stage Fracture 3936.60 3936.70 0
2014-03-12 Multi-Stage Fracture 3816.20 3816.30 0
2014-03-12 Multi-Stage Fracture 3696.60 3696.70 0
2014-03-12 Multi-Stage Fracture 3576.60 3576.70 0
2014-03-12 Multi-Stage Fracture 3459.20 3459.30 0
2014-03-12 Multi-Stage Fracture 3338.90 3339.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-03-12 2014-03-12 2,062 1,001 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Nitrogen 7727-37-9 100 21.2086 N/A
Water Not Available 100 42.1359 N/A
20/40 Sanjel Crystalline Silica 14808-60-7 100 35.4064 N/A
OG-6BL Sanjel Breaker Magnesium Oxide 1309-48-4 100 0.0422 N/A
Non-Hazardous Ingredients Not Available 100 0.0422 N/A
BUFFER-A Sanjel Buffer Acetic Acid 64-19-7 100 0.0847 N/A
Water Not Available 100 0.0847 N/A
CG-5 Sanjel Surfactant Amines. C14-18; C16-18-Unsat. Alkyl. Ethoxylated 68155-39-5 100 1.1219 N/A
Ethanol. 2. 2'-(Octadecylamino) bis- 10213-78-2 100 1.1219 N/A
Hydrochloric Acid 7647-01-0 100 1.1219 N/A
Isopropanol 67-63-0 100 1.1219 N/A
Sodium xylenesulfonate 1300-72-7 100 1.1219 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-03-08 2014-03-10 Surface Water - Runoff 1140

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 6850 0.0 0.0 0.0
2015 8298 0.0 0.0 0.0
2016 8740 0.0 0.0 0.0
2017 8738 0.0 0.0 0.0
2018 8690 0.0 0.0 0.0
2019 8634 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-03-03 No Incident Encountered 0.00 0.00
2014-03-18 No Incident Encountered 0.00 0.00

For data sources see[10]

References