X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425033115022

Well Details

Well ID: 0425033115022
Loading map...
Location: 02/15-31-042-03W5/2
Location Alias: 02/15-31-42-03 W5M
Location Alias 2: 02/15-31-042-03 W5/02
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 03
Section: 31
County/Municipality: Ponoka County
Well Name: KIWETINOHK 105 PEMBINA 6-28-42-3
Operator Name: Kiwetinohk Resources Corp.
License Number: 0488965
License Date: 2018-04-26
License Status: Amended
Spud Date: 2018-10-29
Final Drill Date: 2018-11-22
Well Total Depth: 6352.00 m
Surface Hole Latitude: 52.646102
Surface Hole Longitude: -114.377905

For data sources see[1][2]

Well History

Date Event
2018-04-26 Obtained License
2018-10-31 Surface Casing Operation Performed
2018-11-09 Direction Drilling Operation Performed - Horizontal
2018-11-12 Well Log Performed
2018-11-13 Intermediate Casing Operation Performed
2018-11-14 Well Log Performed
2018-11-22 Finished Drilling
2018-11-22 Well Log Performed
2018-11-22 Well Mode changed to Drilled and Cased
2018-11-24 Liner Casing Operation Performed
2018-11-26 Rig Released
2019-01-11 Perforation Treatment Performed - Jet Perforation
2019-01-11 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-11 Perforation Treatment Performed - Open-Hole Completion
2019-01-12 Perforation Treatment Performed - Jet Perforation
2019-01-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-16 Perforation Treatment Performed - Jet Perforation
2019-01-17 Perforation Treatment Performed - Jet Perforation
2019-01-17 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-18 Perforation Treatment Performed - Jet Perforation
2019-01-18 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-19 Perforation Treatment Performed - Jet Perforation
2019-01-19 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-20 Perforation Treatment Performed - Jet Perforation
2019-01-20 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-21 Perforation Treatment Performed - Jet Perforation
2019-01-21 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-22 Perforation Treatment Performed - Jet Perforation
2019-01-22 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-23 Perforation Treatment Performed - Jet Perforation
2019-01-23 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-24 Perforation Treatment Performed - Jet Perforation
2019-01-24 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-25 Perforation Treatment Performed - Jet Perforation
2019-01-25 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-26 Perforation Treatment Performed - Jet Perforation
2019-01-26 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-27 Perforation Treatment Performed - Jet Perforation
2019-01-27 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-28 Perforation Treatment Performed - Jet Perforation
2019-01-28 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-29 Perforation Treatment Performed - Jet Perforation
2019-01-30 Perforation Treatment Performed - Jet Perforation
2019-01-30 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-31 Perforation Treatment Performed - Jet Perforation
2019-01-31 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-01 Perforation Treatment Performed - Jet Perforation
2019-02-02 Perforation Treatment Performed - Jet Perforation
2019-02-02 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-03 Perforation Treatment Performed - Jet Perforation
2019-02-03 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-04 Perforation Treatment Performed - Jet Perforation
2019-02-04 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-05 Perforation Treatment Performed - Jet Perforation
2019-02-05 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-06 Perforation Treatment Performed - Jet Perforation
2019-02-06 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-07 Perforation Treatment Performed - Jet Perforation
2019-02-07 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-08 Perforation Treatment Performed - Jet Perforation
2019-02-08 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-09 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-10 Perforation Treatment Performed - Jet Perforation
2019-02-10 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-11 Perforation Treatment Performed - Jet Perforation
2019-02-12 Perforation Treatment Performed - Jet Perforation
2019-02-12 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-13 Perforation Treatment Performed - Jet Perforation
2019-02-13 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-01 Well Fluid changed to Crude Oil
2019-03-01 Well Mode changed to Drilling and Completing
2019-05-07 Well Began Production
2019-05-07 Well Fluid changed to Crude Oil
2019-05-07 Well Mode changed to Flowing
2019-12-01 Well Fluid changed to Crude Oil
2019-12-01 Well Mode changed to Gas Lift

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-11-09 2522.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-01-11 Open Hole/Barefoot Completion 6343.59 6352.00 0
2019-01-16 Perforation 6051.20 6052.20 20
2019-02-02 Perforation 4078.90 4079.90 20
2019-02-02 Perforation 4090.10 4091.10 20
2019-02-03 Multi-Stage Fracture 4078.90 4091.10 0
2019-02-03 Perforation 4016.40 4017.40 20
2019-02-03 Perforation 4027.80 4028.80 20
2019-02-03 Multi-Stage Fracture 4016.40 4028.80 0
2019-02-03 Perforation 3953.60 3954.60 20
2019-02-03 Perforation 3965.30 3966.30 20
2019-02-03 Multi-Stage Fracture 3953.60 3966.30 0
2019-02-04 Perforation 3891.00 3892.00 20
2019-01-17 Multi-Stage Fracture 6024.90 6052.20 0
2019-02-04 Perforation 3902.60 3903.60 20
2019-02-04 Multi-Stage Fracture 3891.00 3903.60 0
2019-02-04 Perforation 3828.80 3829.80 20
2019-02-04 Perforation 3840.00 3841.00 20
2019-02-05 Multi-Stage Fracture 3828.80 3841.00 0
2019-02-05 Perforation 3766.10 3767.10 20
2019-02-05 Perforation 3777.60 3778.60 20
2019-02-05 Multi-Stage Fracture 3766.10 3778.60 0
2019-02-05 Perforation 3703.60 3704.60 20
2019-02-05 Perforation 3715.10 3716.10 20
2019-01-17 Perforation 5973.70 5974.70 20
2019-02-05 Multi-Stage Fracture 3703.60 3716.10 0
2019-02-06 Perforation 3653.40 3654.40 20
2019-02-06 Multi-Stage Fracture 3653.40 3654.40 0
2019-02-06 Perforation 3589.00 3590.00 20
2019-02-06 Multi-Stage Fracture 3589.00 3590.00 0
2019-02-06 Perforation 3526.10 3527.10 20
2019-02-07 Multi-Stage Fracture 3526.10 3527.10 0
2019-02-07 Perforation 3463.60 3464.60 20
2019-02-07 Multi-Stage Fracture 3463.60 3464.60 0
2019-02-07 Perforation 3401.00 3402.00 20
2019-01-17 Multi-Stage Fracture 5973.70 5974.70 0
2019-02-08 Multi-Stage Fracture 3401.00 3402.00 0
2019-02-08 Perforation 3338.30 3339.30 20
2019-02-09 Multi-Stage Fracture 3338.30 3339.30 0
2019-02-10 Perforation 3263.00 3264.00 20
2019-02-10 Multi-Stage Fracture 3263.00 3264.00 0
2019-02-11 Perforation 3212.70 3213.70 20
2019-02-12 Multi-Stage Fracture 3212.70 3213.70 0
2019-02-12 Perforation 3150.00 3151.00 20
2019-02-12 Multi-Stage Fracture 3150.00 3151.00 0
2019-02-13 Perforation 3087.30 3088.30 20
2019-01-18 Perforation 5899.50 5900.50 20
2019-02-13 Multi-Stage Fracture 3087.30 3088.30 0
2019-02-13 Perforation 3012.10 3013.10 20
2019-02-13 Multi-Stage Fracture 3012.10 3013.10 0
2019-01-18 Perforation 5911.00 5912.00 20
2019-01-18 Multi-Stage Fracture 5899.50 5912.00 0
2019-01-19 Perforation 5836.80 5837.80 20
2019-01-19 Perforation 5848.40 5849.40 20
2019-01-19 Multi-Stage Fracture 5836.80 5849.40 0
2019-01-11 Multi-Stage Fracture 6295.50 6295.60 0
2019-01-19 Perforation 5774.30 5775.30 20
2019-01-19 Perforation 5785.60 5786.60 20
2019-01-19 Multi-Stage Fracture 5774.30 5786.60 0
2019-01-19 Perforation 5711.60 5712.60 20
2019-01-19 Perforation 5723.10 5724.10 20
2019-01-19 Multi-Stage Fracture 5711.60 5724.10 0
2019-01-20 Perforation 5647.30 5648.30 20
2019-01-20 Perforation 5658.90 5659.90 20
2019-01-20 Multi-Stage Fracture 5647.30 5659.90 0
2019-01-20 Perforation 5584.60 5585.60 42
2019-01-11 Perforation 6186.80 6187.80 20
2019-01-20 Perforation 5596.20 5597.20 20
2019-01-20 Multi-Stage Fracture 5584.60 5597.20 0
2019-01-21 Perforation 5522.00 5523.00 20
2019-01-21 Perforation 5533.60 5534.60 20
2019-01-21 Multi-Stage Fracture 5522.00 5534.60 0
2019-01-21 Perforation 5396.50 5397.50 20
2019-01-21 Perforation 5470.60 5471.60 20
2019-01-21 Multi-Stage Fracture 5396.50 5471.60 0
2019-01-22 Perforation 5408.10 5409.10 20
2019-01-22 Multi-Stage Fracture 5396.50 5409.10 0
2019-01-11 Perforation 6162.80 6163.80 20
2019-01-22 Perforation 5333.70 5334.70 20
2019-01-22 Perforation 5345.30 5346.30 20
2019-01-22 Multi-Stage Fracture 5333.70 5346.30 0
2019-01-22 Perforation 5271.70 5272.70 20
2019-01-22 Perforation 5283.20 5284.20 20
2019-01-23 Multi-Stage Fracture 5271.70 5284.20 0
2019-01-23 Perforation 5208.90 5209.90 20
2019-01-23 Perforation 5220.50 5221.50 20
2019-01-23 Multi-Stage Fracture 5208.90 5221.50 0
2019-01-23 Perforation 5146.00 5147.00 20
2019-01-12 Multi-Stage Fracture 6162.80 6187.80 0
2019-01-23 Perforation 5157.60 5158.60 20
2019-01-24 Multi-Stage Fracture 5146.00 5158.60 0
2019-01-24 Perforation 5083.20 5084.20 20
2019-01-24 Perforation 5094.80 5095.80 20
2019-01-24 Multi-Stage Fracture 5083.20 5095.80 0
2019-01-25 Perforation 5021.00 5022.00 20
2019-01-25 Perforation 5032.50 5033.50 20
2019-01-25 Multi-Stage Fracture 5021.00 5033.50 0
2019-01-25 Perforation 4957.40 4958.40 20
2019-01-25 Perforation 4969.00 4970.00 20
2019-01-12 Perforation 6100.20 6101.20 20
2019-01-25 Multi-Stage Fracture 4957.40 4970.00 0
2019-01-26 Perforation 4894.40 4895.40 20
2019-01-26 Perforation 4905.90 4906.90 20
2019-01-26 Multi-Stage Fracture 4894.40 4906.90 0
2019-01-26 Perforation 4831.60 4832.60 20
2019-01-26 Perforation 4843.20 4844.20 20
2019-01-26 Multi-Stage Fracture 4831.60 4844.20 0
2019-01-26 Perforation 4769.50 4770.50 20
2019-01-26 Perforation 4781.00 4782.00 20
2019-01-27 Multi-Stage Fracture 4769.50 4782.00 0
2019-01-12 Perforation 6122.30 6123.30 20
2019-01-27 Perforation 4706.60 4707.60 20
2019-01-27 Perforation 4718.20 4719.20 20
2019-01-27 Multi-Stage Fracture 4706.60 4719.20 0
2019-01-27 Perforation 4643.80 4644.80 20
2019-01-27 Perforation 4655.30 4656.30 20
2019-01-28 Multi-Stage Fracture 4643.80 4656.30 0
2019-01-28 Perforation 4580.90 4581.90 20
2019-01-28 Perforation 4592.50 4593.50 20
2019-01-28 Multi-Stage Fracture 4580.90 4593.50 0
2019-01-29 Perforation 4517.90 4518.90 20
2019-01-12 Multi-Stage Fracture 6100.20 6123.30 0
2019-01-29 Perforation 4529.50 4530.50 20
2019-01-30 Multi-Stage Fracture 4517.90 4530.50 0
2019-01-30 Perforation 4455.80 4456.80 20
2019-01-30 Perforation 4467.30 4468.30 20
2019-01-30 Multi-Stage Fracture 4455.80 4468.30 0
2019-01-30 Perforation 4393.00 4394.00 20
2019-01-30 Perforation 4404.50 4405.50 20
2019-01-31 Multi-Stage Fracture 4393.00 4405.50 0
2019-01-31 Perforation 4330.10 4331.10 20
2019-01-31 Perforation 4341.70 4342.70 20
2019-01-16 Perforation 6024.90 6025.90 20
2019-01-31 Multi-Stage Fracture 4330.10 4342.70 0
2019-02-01 Perforation 4265.50 4266.50 20
2019-02-01 Perforation 4277.00 4278.00 20
2019-02-02 Multi-Stage Fracture 4265.50 4278.00 0
2019-02-02 Perforation 4203.70 4204.70 20
2019-02-02 Perforation 4215.00 4216.00 20
2019-02-02 Multi-Stage Fracture 4203.70 4216.00 0
2019-02-02 Perforation 4140.20 4141.20 20
2019-02-02 Perforation 4053.40 4054.40 20
2019-02-02 Multi-Stage Fracture 4053.40 4141.20 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-01-11 2019-02-13 2,820 99,849 N/A
2 2019-01-17 2019-01-17 2,820 0 N/A
3 2019-01-17 2019-01-18 2,820 0 N/A
4 2019-01-22 2019-01-22 2,820 0 N/A
5 2019-01-17 2019-01-22 2,820 0 N/A
6 2019-01-24 2019-02-12 2,820 0 N/A
7 2019-01-17 2019-01-28 2,820 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 94.4848 N/A
40/70 Domestic Sand Step Energy Services Crystalline Silica 14808-60-7 100 4.7693 N/A
15% HCl Acid Step Energy Services Acid Hydrochloric Acid 7647-01-0 100 0.6734 N/A
Water 7732-18-5 100 0.6734 N/A
SAB-1 Acid Blend Additive Package Step Energy Services Acid Acetic Acid 64-19-7 100 0.0074 N/A
Ethylene Glycol 107-21-1 100 0.0074 N/A
Methyl Alcohol 67-56-1 100 0.0074 N/A
Non Hazardous Ingredients Not Available 100 0.0074 N/A
Propan-2-ol 67-63-0 100 0.0074 N/A
SABB-1 (Acid Corrosion Inhibitor) Step Energy Services Acid 2-Propanol 67-63-0 100 0.0054 N/A
Ethylene Glycol 107-21-1 100 0.0054 N/A
Methyl Alcohol 67-56-1 100 0.0054 N/A
Non-Hazardous Ingredients Not Available 100 0.0054 N/A
Secure BIO-10B (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0094 N/A
Methyl Alcohol 67-56-1 100 0.0094 N/A
SFR-302 (Friction Reducer) Step Energy Services Friction Reducer Proprietary Trade Secret 100 0.0383 N/A
Sodium Chloride 7647-14-5 100 0.0383 N/A
SAS-7 (Anti-Sludge) Step Energy Services Surfactant Benzenesulfonic acid. C10-16-alkyl derivatives 68584-22-5 100 0.0034 N/A
Non-Hazardous Ingredients Not Available 100 0.0034 N/A
Propylene Glycol 57-55-6 100 0.0034 N/A
2 50/140 Domestic Sand Step Energy Services Crystalline Silica 14808-60-7 100 0.1056 N/A
3 SCBO-2 (Breaker) Step Energy Services Breaker Ammonium Persulfate 7727-54-0 100 0.0037 N/A
Cured Acrylic Resin Not Available 100 0.0037 N/A
Non-Hazardous Ingredients Not Available 100 0.0037 N/A
SBH-1 (Buffer) Step Energy Services Buffer Non-Hazardous Ingredients Not Available 100 0.0017 N/A
Potassium Carbonate 584-08-7 100 0.0017 N/A
Potassium Hydroxide 1310-58-3 100 0.0017 N/A
SBX-7 (Crosslinker) Step Energy Services Crosslinker Non-Hazardous Ingredients Not Available 100 0.035 N/A
Petroleum Distillates. hydrotreated light 64742-47-8 100 0.035 N/A
4 SAF-3 (Anti Foamer) Step Energy Services Defoamer Alcohols. C9-11-iso-. C10-rich. ethoxylated 78330-20-8 100 0.0022 N/A
Non-Hazardous Ingredients Not Available 100 0.0021 N/A
Polyethylene glycol monotridecyl ether. liquids 24938-91-8 100 0.0022 N/A
5 SFR-102s (Friction Reducer) STEP Energy Services Friction Reducer Distillates. Petroleum. Hydrotreated Light 64742-47-8 100 0.0109 N/A
Proprietary Trade Secret 100 0.0109 N/A
6 SFR-106 (Friction Reducer) Step Energy Services Friction Reducer Ethoxylated Alcohol 68131-39-5 100 0.0018 N/A
Non-Hazardous Ingredients Not Available 100 0.0018 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.0018 N/A
7 SWG-101 (Gellant) Step Energy Services Gelling Agent Guar gum 9000-30-0 100 0.0379 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-01-10 2019-02-05 Surface Water - Runoff 73638
2019-02-05 2019-03-25 Surface Water - Runoff 27088

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 5228 0.0 0.0 0.0
2020 2166 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-11-27 No Incident Encountered 0.00 0.00
2019-02-14 No Incident Encountered 0.00 0.00

For data sources see[9]

References