X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424253602024

Well Details

Well ID: 0424253602024
Loading map...
Location: 02/02-36-042-25W4/4
Location Alias: 02/02-36-42-25 W4M
Location Alias 2: 02/02-36-042-25 W4/04
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 25
Section: 36
County/Municipality: Ponoka County
Well Name: HAWKER 102 CHIG 2-36-42-25
Operator Name: Canadian Natural Resources Limited
License Number: 0296466
License Date: 2003-11-19
License Status: Suspension
Spud Date: 2003-12-03
Final Drill Date: 2003-12-09
Well Total Depth: 1641.00 m
Surface Hole Latitude: 52.655670
Surface Hole Longitude: -113.467553

For data sources see[1][2]

Well History

Date Event
2003-11-19 Obtained License
2003-12-04 Lost Circulation Occurred
2003-12-04 Surface Casing Operation Performed
2003-12-09 Finished Drilling
2003-12-09 Well Log Performed
2003-12-09 Well Mode changed to Drilled and Cased
2003-12-10 Drill Stem Test Performed
2003-12-11 Production Casing Operation Performed
2003-12-11 Rig Released
2003-12-17 Perforation Treatment Performed - Jet Perforation
2003-12-18 Perforation Treatment Performed - Jet Perforation
2004-01-21 Perforation Treatment Performed - Jet Perforation
2004-01-24 Perforation Treatment Performed - Fractured
2004-01-31 Perforation Treatment Performed - Cement Squeeze
2004-01-31 Plug Back Performed
2004-02-09 Perforation Treatment Performed - Jet Perforation
2004-02-10 Perforation Treatment Performed - Fractured
2004-02-22 Perforation Treatment Performed - Cement Squeeze
2004-02-22 Plug Back Performed
2004-02-22 Well Mode changed to Abandoned Zone
2005-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-07-14 Plug Back Performed
2005-07-15 Perforation Treatment Performed - Jet Perforation
2005-07-17 Perforation Treatment Performed - Fractured
2005-07-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-07-19 Perforation Treatment Performed - Jet Perforation
2005-07-19 Plug Back Performed
2005-07-21 Perforation Treatment Performed - Fractured
2008-02-10 Well Log Performed
2008-02-28 Perforation Treatment Performed - Jet Perforation
2008-02-28 Well Log Performed
2008-03-07 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-12-17 Perforation 1608.00 1610.00 17
2005-07-14 Packing Device Capped w/Cement 1517.00 1525.00 0
2005-07-15 Perforation 790.50 793.50 17
2005-07-17 Fracture 790.50 793.50 0
2005-07-19 Packing Device Capped w/Cement 775.00 783.00 0
2005-07-19 Perforation 741.00 742.50 17
2005-07-19 Perforation 599.50 603.00 17
2005-07-19 Perforation 561.00 562.50 17
2005-07-21 Fracture 741.00 742.50 0
2005-07-21 Fracture 599.50 603.00 0
2005-07-21 Fracture 561.00 562.50 0
2003-12-18 Perforation 1600.00 1601.00 17
2008-02-28 Perforation 240.50 241.00 13
2008-02-28 Perforation 252.50 253.00 13
2008-02-28 Perforation 264.00 264.50 13
2008-02-28 Perforation 292.00 292.50 13
2008-02-28 Perforation 302.20 302.70 13
2008-02-28 Perforation 318.50 319.00 13
2008-02-28 Perforation 359.00 359.50 13
2008-02-28 Perforation 365.80 366.30 13
2008-02-28 Perforation 378.50 380.00 13
2008-02-28 Perforation 387.20 387.70 13
2004-01-21 Perforation 1555.00 1562.00 17
2008-02-28 Perforation 409.20 409.70 13
2008-02-28 Perforation 412.00 412.50 13
2008-02-28 Perforation 414.80 415.30 13
2008-02-28 Perforation 418.00 418.50 13
2008-02-28 Perforation 423.00 423.50 13
2008-02-28 Perforation 426.00 426.50 13
2008-02-28 Perforation 428.50 430.00 13
2008-02-28 Perforation 438.00 438.50 13
2008-02-28 Perforation 446.00 447.50 13
2008-02-28 Perforation 455.00 456.00 13
2004-01-24 Fracture 1555.00 1562.00 0
2008-02-28 Perforation 466.00 468.00 13
2008-02-28 Perforation 469.80 470.30 13
2008-02-28 Perforation 488.00 488.50 13
2008-03-07 Fracture 240.50 470.30 0
2004-01-31 Cement Squeeze 1555.00 1562.00 0
2004-02-09 Perforation 1532.50 1534.00 17
2004-02-10 Fracture 1532.50 1534.00 0
2004-02-22 Cement Squeeze 1532.50 1534.50 0
2005-07-14 Packing Device Capped w/Cement 1585.00 1593.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2003-12-04 Lost Circulation 200.00 201.00

For data sources see[5]

References