If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0424230213002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.590705,"lon":-113.216299,"icon":""}]} |
Location: 00/13-02-042-23W4/2 | |
Location Alias: 00/13-02-42-23 W4M | |
Location Alias 2: 00/13-02-042-23 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 4 | |
Range: 23 | |
Section: 02 | |
County/Municipality: Ponoka County | |
Well Name: EMBER BASHAW 13-2-42-23 | |
Operator Name: Ember Resources Inc. | |
License Number: 0316359 | |
License Date: 2004-10-08 | |
License Status: Issued | |
Spud Date: 2004-11-22 | |
Final Drill Date: 2004-11-23 | |
Well Total Depth: 736.00 m | |
Surface Hole Latitude: 52.590705 | |
Surface Hole Longitude: -113.216299 |
Date | Event |
---|---|
2004-10-08 | Obtained License |
2004-11-22 | Surface Casing Operation Performed |
2004-11-23 | Finished Drilling |
2004-11-23 | Well Log Performed |
2004-11-23 | Well Mode changed to Drilled and Cased |
2004-11-24 | Production Casing Operation Performed |
2004-11-24 | Rig Released |
2004-11-30 | Perforation Treatment Performed - Jet Perforation |
2004-12-02 | Perforation Treatment Performed - Fractured |
2004-12-21 | Well Began Production |
2004-12-21 | Well Fluid changed to Coalbed Methane-Coals Only |
2004-12-21 | Well Mode changed to Flowing |
2008-12-04 | Well Log Performed |
2009-09-18 | Well Log Performed |
2010-09-02 | Well Log Performed |
2011-09-26 | Well Log Performed |
2012-07-26 | Well Log Performed |
2013-07-26 | Well Log Performed |
2015-10-01 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-11-30 | Perforation | 503.00 | 506.00 | 13 |
2004-11-30 | Perforation | 292.10 | 293.00 | 13 |
2004-11-30 | Perforation | 296.20 | 296.80 | 13 |
2004-11-30 | Perforation | 299.40 | 299.90 | 13 |
2004-11-30 | Perforation | 301.60 | 303.00 | 13 |
2004-11-30 | Perforation | 303.60 | 305.00 | 13 |
2004-11-30 | Perforation | 308.50 | 309.00 | 13 |
2004-11-30 | Perforation | 324.70 | 325.40 | 13 |
2004-11-30 | Perforation | 326.10 | 326.60 | 13 |
2004-11-30 | Perforation | 340.70 | 341.20 | 13 |
2004-11-30 | Perforation | 343.40 | 343.90 | 13 |
2004-11-30 | Perforation | 181.80 | 182.30 | 13 |
2004-11-30 | Perforation | 350.10 | 350.90 | 13 |
2004-11-30 | Perforation | 357.80 | 359.80 | 13 |
2004-11-30 | Perforation | 372.90 | 373.40 | 13 |
2004-11-30 | Perforation | 382.00 | 382.90 | 13 |
2004-11-30 | Perforation | 389.90 | 390.50 | 13 |
2004-11-30 | Perforation | 396.20 | 396.80 | 13 |
2004-11-30 | Perforation | 401.20 | 402.20 | 13 |
2004-11-30 | Perforation | 405.80 | 406.30 | 13 |
2004-12-02 | Fracture | 503.00 | 506.00 | 0 |
2004-12-02 | Fracture | 181.80 | 406.30 | 0 |
2004-11-30 | Perforation | 196.20 | 197.00 | 13 |
2004-11-30 | Perforation | 220.90 | 221.40 | 13 |
2004-11-30 | Perforation | 228.90 | 229.40 | 13 |
2004-11-30 | Perforation | 231.80 | 232.30 | 13 |
2004-11-30 | Perforation | 244.10 | 244.80 | 13 |
2004-11-30 | Perforation | 276.20 | 276.70 | 13 |
2004-11-30 | Perforation | 288.90 | 289.60 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 256 | 0.0 | 0.0 | 0.0 |
2005 | 8759 | 0.0 | 0.0 | 0.0 |
2006 | 8636 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8399 | 0.0 | 0.0 | 0.0 |
2009 | 8634 | 0.0 | 0.0 | 0.0 |
2010 | 8709 | 0.0 | 0.0 | 0.0 |
2011 | 8693 | 0.0 | 0.0 | 0.0 |
2012 | 8766 | 0.0 | 0.0 | 0.0 |
2013 | 8517 | 0.0 | 0.0 | 0.0 |
2014 | 8657 | 0.0 | 0.0 | 0.0 |
2015 | 6450 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-09-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]