If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0424131116000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.605892,"lon":-111.757953,"icon":""}]} |
| Location: 00/16-11-042-13W4/0 | |
| Location Alias: 00/16-11-42-13 W4M | |
| Location Alias 2: 00/16-11-042-13 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 042 | |
| Meridian: 4 | |
| Range: 13 | |
| Section: 11 | |
| County/Municipality: Flagstaff County | |
| Well Name: CLEO ENERGY KILLAM 16-11-42-13 | |
| Operator Name: Cleo Energy Corp. | |
| License Number: 0165298 | |
| License Date: 1994-02-22 | |
| License Status: Suspension | |
| Spud Date: 1994-03-06 | |
| Final Drill Date: 1994-03-08 | |
| Well Total Depth: 977.00 m | |
| Surface Hole Latitude: 52.605892 | |
| Surface Hole Longitude: -111.757953 |
| Date | Event |
|---|---|
| 1994-02-22 | Obtained License |
| 1994-03-06 | Surface Casing Operation Performed |
| 1994-03-06 | Well Log Performed |
| 1994-03-08 | Finished Drilling |
| 1994-03-08 | Well Mode changed to Drilled and Cased |
| 1994-03-09 | Well Log Performed |
| 1994-03-10 | Production Casing Operation Performed |
| 1994-03-10 | Rig Released |
| 1994-03-27 | Perforation Treatment Performed - Jet Perforation |
| 1994-03-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1994-03-29 | Perforation Treatment Performed - Jet Perforation |
| 1994-07-21 | Well Began Production |
| 1994-07-21 | Well Fluid changed to Gas |
| 1994-07-21 | Well Mode changed to Flowing |
| 1999-07-31 | Well Fluid changed to Gas |
| 1999-07-31 | Well Mode changed to Suspended |
| 2003-03-11 | Well Fluid changed to Gas |
| 2003-03-11 | Well Mode changed to Flowing |
| 2004-12-08 | Perforation Treatment Performed - Jet Perforation |
| 2006-07-01 | Well Fluid changed to Gas |
| 2006-07-01 | Well Mode changed to Suspended |
| 2007-02-01 | Well Fluid changed to Gas |
| 2007-02-01 | Well Mode changed to Flowing |
| 2008-08-31 | Well Fluid changed to Gas |
| 2008-08-31 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1994-03-27 | Perforation | 932.50 | 933.50 | 28 |
| 1994-03-28 | Packing Device Capped w/Cement | 919.50 | 927.50 | 0 |
| 1994-03-29 | Perforation | 912.00 | 915.00 | 14 |
| 2004-12-08 | Perforation | 912.00 | 915.00 | 17 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1994 | 3416 | 0.0 | 0.0 | 0.0 |
| 1995 | 846 | 0.0 | 0.0 | 0.0 |
| 1996 | 827 | 0.0 | 0.0 | 0.0 |
| 1997 | 8559 | 0.0 | 0.0 | 0.0 |
| 1998 | 7548 | 0.0 | 0.0 | 0.0 |
| 1999 | 3496 | 0.0 | 0.0 | 0.0 |
| 2003 | 5262 | 0.0 | 0.0 | 0.0 |
| 2004 | 6321 | 0.0 | 0.0 | 0.0 |
| 2005 | 3944 | 0.0 | 0.0 | 0.0 |
| 2007 | 6328 | 0.0 | 0.0 | 0.0 |
| 2008 | 4343 | 0.0 | 0.0 | 0.0 |
For data sources see[5]