X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424092516003

Well Details

Well ID: 0424092516003
Loading map...
Location: 00/16-25-042-09W4/3
Location Alias: 00/16-25-42-09 W4M
Location Alias 2: 00/16-25-042-09 W4/03
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 09
Section: 25
County/Municipality: Municipal District of Provost No. 52
Well Name: CLEO ENERGY KILLAM 16-25-42-9
Operator Name: Cleo Energy Corp.
License Number: 0093130
License Date: 1981-11-05
License Status: Issued
Spud Date: 1981-11-12
Final Drill Date: 1981-11-15
Well Total Depth: 816.00 m
Surface Hole Latitude: 52.649011
Surface Hole Longitude: -111.162288

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-11-05 Obtained License
1981-11-13 Drill Stem Test Performed
1981-11-15 Finished Drilling
1981-11-15 Well Mode changed to Drilled and Cased
1981-11-16 Drill Stem Test Performed
1981-11-17 Production Casing Operation Performed
1982-01-20 Perforation Treatment Performed - Jet Perforation
1982-01-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-01-21 Perforation Treatment Performed - Jet Perforation
1982-01-22 Perforation Treatment Performed - Jet Perforation
1985-07-10 Well Log Performed
1985-07-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-07-11 Plug Back Performed
1990-02-21 Well Log Performed
1990-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-02-22 Plug Back Performed
1990-02-23 Perforation Treatment Performed - Jet Perforation
1990-03-25 Well Began Production
1990-03-25 Well Fluid changed to Gas
1990-03-25 Well Mode changed to Flowing
2006-08-18 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-01-20 Perforation 797.00 798.00 13
1982-01-21 Packing Device Capped w/Cement 788.00 796.00 0
1982-01-21 Perforation 784.00 785.00 13
1982-01-22 Perforation 712.50 716.50 13
1985-07-11 Packing Device Capped w/Cement 752.00 760.00 0
1990-02-22 Packing Device Capped w/Cement 702.00 710.00 0
1990-02-23 Perforation 665.50 667.00 14
1990-02-23 Perforation 667.50 670.00 14
2006-08-18 Fracture 665.50 670.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 3784 0.0 0.0 0.0
1991 8144 0.0 0.0 0.0
1992 8454 0.0 0.0 0.0
1993 7815 0.0 0.0 0.0
1994 8236 0.0 0.0 0.0
1995 8561 0.0 0.0 0.0
1996 8272 0.0 0.0 0.0
1997 8358 0.0 0.0 0.0
1998 5439 0.0 0.0 0.0
1999 8061 0.0 0.0 0.0
2000 5021 0.0 0.0 0.0
2001 724 0.0 0.0 0.0
2002 7817 0.0 0.0 0.0
2003 7187 0.0 0.0 0.0
2004 6133 0.0 0.0 0.0
2005 8598 0.0 0.0 0.0
2006 7093 0.0 0.0 0.0
2007 8091 0.0 0.0 0.0
2008 8675 0.0 0.0 0.0
2009 8758 0.0 0.0 0.0
2010 8600 0.0 0.0 0.0
2011 8611 0.0 0.0 0.0
2012 8592 0.0 0.0 0.0
2013 8341 0.0 0.0 0.0
2014 8291 0.0 0.0 0.0
2015 8695 0.0 0.0 0.0
2016 8287 0.0 0.0 0.0
2017 8560 0.0 0.0 0.0
2018 8503 0.0 0.0 0.0
2019 7737 0.0 0.0 0.0
2020 1156 0.0 0.0 0.0

For data sources see[5]

References