If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0424043411000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.66053,"lon":-110.497695,"icon":""}]} |
Location: 00/11-34-042-04W4/0 | |
Location Alias: 00/11-34-42-04 W4M | |
Location Alias 2: 00/11-34-042-04 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 4 | |
Range: 04 | |
Section: 34 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: KOCH RIBSTONE 11-34-42-4 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0075823 | |
License Date: 1979-05-22 | |
License Status: Issued | |
Spud Date: 1979-05-24 | |
Final Drill Date: 1979-05-28 | |
Well Total Depth: 740.00 m | |
Surface Hole Latitude: 52.660530 | |
Surface Hole Longitude: -110.497695 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-05-22 | Obtained License |
1979-05-28 | Drill Stem Test Performed |
1979-05-28 | Finished Drilling |
1979-05-28 | Well Mode changed to Drilled and Cased |
1979-05-29 | Production Casing Operation Performed |
1979-06-21 | Perforation Treatment Performed - Jet Perforation |
1979-08-09 | Well Began Production |
1979-08-09 | Well Fluid changed to Crude Oil |
1979-08-09 | Well Mode changed to Pumping |
1979-11-14 | Perforation Treatment Performed - Jet Perforation |
1991-07-01 | Well Fluid changed to Crude Oil |
1991-07-01 | Well Mode changed to Suspended |
1994-07-01 | Well Fluid changed to Crude Oil |
1994-07-01 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-06-21 | Perforation | 704.00 | 708.00 | 12 |
1979-11-14 | Perforation | 691.50 | 703.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1979 | 2789 | 0.0 | 0.0 | 0.0 |
1980 | 7840 | 0.0 | 0.0 | 0.0 |
1981 | 744 | 0.0 | 0.0 | 0.0 |
1982 | 192 | 0.0 | 0.0 | 0.0 |
1983 | 885 | 0.0 | 0.0 | 0.0 |
1984 | 6648 | 0.0 | 0.0 | 0.0 |
1985 | 3082 | 0.0 | 0.0 | 0.0 |
1986 | 5095 | 0.0 | 0.0 | 0.0 |
1987 | 8128 | 0.0 | 0.0 | 0.0 |
1988 | 5040 | 0.0 | 0.0 | 0.0 |
1989 | 5589 | 0.0 | 0.0 | 0.0 |
1990 | 6855 | 0.0 | 0.0 | 0.0 |
1994 | 3819 | 0.0 | 0.0 | 0.0 |
1995 | 8093 | 0.0 | 0.0 | 0.0 |
1996 | 8239 | 0.0 | 0.0 | 0.0 |
1997 | 8488 | 0.0 | 0.0 | 0.0 |
1998 | 7637 | 0.0 | 0.0 | 0.0 |
1999 | 8309 | 0.0 | 0.0 | 0.0 |
2000 | 8413 | 0.0 | 0.0 | 0.0 |
2001 | 5540 | 0.0 | 0.0 | 0.0 |
2002 | 2496 | 0.0 | 0.0 | 0.0 |
2003 | 6903 | 0.0 | 0.0 | 0.0 |
2004 | 7455 | 0.0 | 0.0 | 0.0 |
2005 | 8283 | 0.0 | 0.0 | 0.0 |
2006 | 8462 | 0.0 | 0.0 | 0.0 |
2007 | 8397 | 0.0 | 0.0 | 0.0 |
2008 | 2694 | 0.0 | 0.0 | 0.0 |
2009 | 8077 | 0.0 | 0.0 | 0.0 |
2010 | 8379 | 0.0 | 0.0 | 0.0 |
2011 | 7422 | 0.0 | 0.0 | 0.0 |
2012 | 7745 | 0.0 | 0.0 | 0.0 |
2013 | 8651 | 0.0 | 0.0 | 0.0 |
2014 | 8218 | 0.0 | 0.0 | 0.0 |
2015 | 8646 | 0.0 | 0.0 | 0.0 |
2016 | 8731 | 0.0 | 0.0 | 0.0 |
2017 | 7574 | 0.0 | 0.0 | 0.0 |
2018 | 8278 | 0.0 | 0.0 | 0.0 |
2019 | 8074 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]