If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0424043408002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.6573,"lon":-110.488942,"icon":""}]} |
Location: 00/08-34-042-04W4/2 | |
Location Alias: 00/08-34-42-04 W4M | |
Location Alias 2: 00/08-34-042-04 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 4 | |
Range: 04 | |
Section: 34 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: TALISMAN 8B RIBSTONE 8-34-42-4 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0310035 | |
License Date: 2004-06-11 | |
License Status: RecCertified | |
Spud Date: 2005-09-19 | |
Final Drill Date: 2005-09-21 | |
Well Total Depth: 768.00 m | |
Surface Hole Latitude: 52.657300 | |
Surface Hole Longitude: -110.488942 |
Date | Event |
---|---|
2004-06-11 | Obtained License |
2005-09-21 | Finished Drilling |
2005-09-21 | Perforation Treatment Performed - Open-Hole Completion |
2005-09-21 | Well Mode changed to Drilled and Cased |
2005-09-22 | Well Log Performed |
2005-09-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-09-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-09-29 | Rig Released |
2015-10-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2015-10-23 | Plug Back Performed |
2015-11-05 | Well Abandoned |
2015-11-05 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-09-21 | Open Hole/Barefoot Completion | 693.00 | 768.00 | 0 |
2005-09-23 | Packing Device Capped w/Cement | 734.00 | 742.00 | 0 |
2005-09-24 | Packing Device Capped w/Cement | 682.00 | 717.00 | 0 |
2015-10-23 | Packing Device Capped w/Cement | 667.90 | 677.90 | 0 |
For data sources see[4]