X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424032910000

Well Details

Well ID: 0424032910000
Loading map...
Location: 00/10-29-042-03W4/0
Location Alias: 00/10-29-42-03 W4M
Location Alias 2: 00/10-29-042-03 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 03
Section: 29
County/Municipality: Municipal District of Wainwright No. 61
Well Name: TALISMAN CHAUVS 10-29-42-3
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0060702
License Date: 1976-10-19
License Status: Abandoned
Spud Date: 1976-11-10
Final Drill Date: 1976-11-13
Well Total Depth: 681.20 m
Surface Hole Latitude: 52.647977
Surface Hole Longitude: -110.396503

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-10-19 Obtained License
1976-11-13 Finished Drilling
1976-11-14 Drill Stem Test Performed
1976-11-15 Production Casing Operation Performed
1977-06-09 Well Mode changed to Drilled and Cased
1998-12-15 Perforation Treatment Performed - Jet Perforation
2003-02-21 Well Began Production
2003-02-21 Well Fluid changed to Gas
2003-02-21 Well Mode changed to Flowing
2008-12-01 Well Fluid changed to Gas
2008-12-01 Well Mode changed to Suspended
2016-09-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-09-14 Plug Back Performed
2016-09-14 Well Fluid changed to Gas
2016-09-14 Well Mode changed to Abandoned Zone
2016-09-27 Perforation Treatment Performed - Jet Perforation
2016-09-27 Well Log Performed
2016-09-28 Perforation Treatment Performed - Cement Plug
2016-09-28 Perforation Treatment Performed - Remedial Casing
2016-09-28 Plug Back Performed
2016-09-29 Well Abandoned
2016-09-29 Well Fluid changed to Gas
2016-09-29 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-12-15 Perforation 569.60 570.60 13
2016-09-14 Packing Device Capped w/Cement 552.00 560.00 0
2016-09-27 Perforation 237.00 238.00 17
2016-09-28 Remedial Casing Cementing 237.00 238.00 0
2016-09-28 Cement Plug 166.00 260.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 7459 0.0 0.0 0.0
2004 8680 0.0 0.0 0.0
2005 8507 0.0 0.0 0.0
2006 7202 0.0 0.0 0.0
2007 5601 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-09-14 No Incident Encountered 0.00 0.00
2016-09-29 No Incident Encountered 0.00 0.00

For data sources see[6]

References