If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0424032709000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.648661,"lon":-110.342726,"icon":""}]} |
| Location: 00/09-27-042-03W4/0 | |
| Location Alias: 00/09-27-42-03 W4M | |
| Location Alias 2: 00/09-27-042-03 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 042 | |
| Meridian: 4 | |
| Range: 03 | |
| Section: 27 | |
| County/Municipality: Municipal District of Wainwright No. 61 | |
| Well Name: HARBOUR TALISMAN CHAUVS 9-27-42-3 | |
| Operator Name: Repsol Oil & Gas Canada Inc. | |
| License Number: 0162981 | |
| License Date: 1993-12-08 | |
| License Status: Suspension | |
| Spud Date: 1993-12-12 | |
| Final Drill Date: 1993-12-15 | |
| Well Total Depth: 673.00 m | |
| Surface Hole Latitude: 52.648661 | |
| Surface Hole Longitude: -110.342726 |
| Date | Event |
|---|---|
| 1993-12-08 | Obtained License |
| 1993-12-13 | Surface Casing Operation Performed |
| 1993-12-15 | Finished Drilling |
| 1993-12-15 | Production Casing Operation Performed |
| 1993-12-15 | Well Log Performed |
| 1993-12-15 | Well Mode changed to Drilled and Cased |
| 1993-12-16 | Rig Released |
| 1994-01-07 | Perforation Treatment Performed - Jet Perforation |
| 1994-01-07 | Well Log Performed |
| 1994-01-12 | Well Began Production |
| 1994-01-12 | Well Fluid changed to Crude Oil |
| 1994-01-12 | Well Mode changed to Pumping |
| 1994-03-04 | Perforation Treatment Performed - Fractured |
| 1997-04-30 | Well Fluid changed to Crude Oil |
| 1997-04-30 | Well Mode changed to Suspended |
| 2004-02-24 | Perforation Treatment Performed - Jet Perforation |
| 2004-02-24 | Well Log Performed |
| 2004-07-01 | Well Began Injection |
| 2004-07-01 | Well Fluid changed to Water |
| 2004-07-01 | Well Type changed to Injection |
| 2007-04-01 | Well Fluid changed to Water |
| 2007-04-01 | Well Mode changed to Suspended |
| 2007-04-01 | Well Type changed to Injection |
| 2007-12-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2007-12-02 | Plug Back Performed |
| 2007-12-02 | Well Fluid changed to Water |
| 2007-12-02 | Well Mode changed to Abandoned Zone |
| 2007-12-02 | Well Type changed to Injection |
| 2008-02-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2008-02-17 | Perforation Treatment Performed - Cement Plug |
| 2013-12-11 | Perforation Treatment Performed - Jet Perforation |
| 2014-01-08 | Perforation Treatment Performed - Jet Perforation |
| 2014-01-08 | Well Log Performed |
| 2014-01-09 | Perforation Treatment Performed - Cement Plug |
| 2014-01-09 | Perforation Treatment Performed - Remedial Casing |
| 2014-03-13 | Perforation Treatment Performed - Cement Plug |
| 2014-03-13 | Plug Back Performed |
| 2015-09-18 | Perforation Treatment Performed - Abrasa-Jet Perforation |
| 2015-09-19 | Perforation Treatment Performed - Cement Plug |
| 2015-09-19 | Perforation Treatment Performed - Remedial Casing |
| 2015-09-19 | Plug Back Performed |
| 2016-12-12 | Perforation Treatment Performed - Jet Perforation |
| 2016-12-12 | Well Log Performed |
| 2016-12-13 | Perforation Treatment Performed - Cement Plug |
| 2016-12-13 | Perforation Treatment Performed - Remedial Casing |
| 2016-12-13 | Plug Back Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1994-01-07 | Perforation | 643.00 | 645.00 | 17 |
| 2014-01-09 | Cement Plug | 485.30 | 496.00 | 0 |
| 2014-01-09 | Cement Plug | 476.00 | 485.00 | 0 |
| 2014-03-13 | Cement Plug | 309.00 | 374.00 | 0 |
| 2015-09-18 | Hydra Jet Perforation | 340.50 | 342.00 | 0 |
| 2015-09-19 | Remedial Casing Cementing | 340.50 | 342.00 | 0 |
| 2015-09-19 | Cement Plug | 312.00 | 331.50 | 0 |
| 2016-12-12 | Perforation | 286.50 | 287.80 | 17 |
| 2016-12-13 | Remedial Casing Cementing | 286.50 | 287.80 | 0 |
| 2016-12-13 | Cement Plug | 251.00 | 303.00 | 0 |
| 1994-03-04 | Fracture | 643.00 | 645.00 | 0 |
| 2004-02-24 | Perforation | 643.00 | 646.00 | 17 |
| 2007-12-02 | Packing Device Capped w/Cement | 630.00 | 638.00 | 0 |
| 2008-02-12 | Packing Device Capped w/Cement | 556.00 | 562.00 | 0 |
| 2008-02-17 | Cement Plug | 311.00 | 380.00 | 0 |
| 2013-12-11 | Perforation | 311.00 | 380.00 | 2 |
| 2014-01-08 | Perforation | 491.00 | 495.00 | 17 |
| 2014-01-09 | Remedial Casing Cementing | 491.00 | 495.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1994 | 5166 | 0.0 | 0.0 | 0.0 |
| 1995 | 8258 | 0.0 | 0.0 | 0.0 |
| 1996 | 6201 | 0.0 | 0.0 | 0.0 |
| 1997 | 1680 | 0.0 | 0.0 | 0.0 |
| 2004 | 0 | 0.0 | 0.0 | 0.0 |
| 2005 | 0 | 0.0 | 0.0 | 0.0 |
| 2006 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2014-01-15 | No Incident Encountered | 0.00 | 0.00 |
| 2014-03-14 | No Incident Encountered | 0.00 | 0.00 |
| 2015-09-19 | No Incident Encountered | 0.00 | 0.00 |
| 2016-12-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]