If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0424032414D02 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.636681,"lon":-110.305795,"icon":""}]} |
| Location: D0/14-24-042-03W4/2 | |
| Location Alias: D0/14-24-42-03 W4M | |
| Location Alias 2: D0/14-24-042-03 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 042 | |
| Meridian: 4 | |
| Range: 03 | |
| Section: 24 | |
| County/Municipality: Municipal District of Wainwright No. 61 | |
| Well Name: BP CHAUVIN SOUTH 14D-24-42-3 | |
| Operator Name: Repsol Oil & Gas Canada Inc. | |
| License Number: 0153466 | |
| License Date: 1992-08-19 | |
| License Status: Suspension | |
| Spud Date: 1992-08-31 | |
| Final Drill Date: 1992-09-01 | |
| Well Total Depth: 665.00 m | |
| Surface Hole Latitude: 52.636681 | |
| Surface Hole Longitude: -110.305795 |
| Date | Event |
|---|---|
| 1992-08-19 | Obtained License |
| 1992-08-31 | Surface Casing Operation Performed |
| 1992-09-01 | Finished Drilling |
| 1992-09-01 | Production Casing Operation Performed |
| 1992-09-01 | Rig Released |
| 1992-09-01 | Well Log Performed |
| 1992-09-01 | Well Mode changed to Drilled and Cased |
| 1992-09-16 | Well Log Performed |
| 1992-09-17 | Perforation Treatment Performed - Jet Perforation |
| 1994-08-30 | Perforation Treatment Performed - Jet Perforation |
| 1994-09-03 | Perforation Treatment Performed - Fractured |
| 2001-02-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2001-02-12 | Perforation Treatment Performed - Jet Perforation |
| 2001-02-12 | Plug Back Performed |
| 2001-02-12 | Well Log Performed |
| 2001-02-12 | Well Mode changed to Drilled and Cased |
| 2001-07-11 | Well Began Production |
| 2001-07-11 | Well Fluid changed to Gas |
| 2001-07-11 | Well Mode changed to Flowing |
| 2007-06-01 | Well Fluid changed to Gas |
| 2007-06-01 | Well Mode changed to Suspended |
| 2007-06-28 | Perforation Treatment Performed - Cement Squeeze |
| 2007-06-28 | Plug Back Performed |
| 2007-06-28 | Well Fluid changed to Gas |
| 2007-06-28 | Well Mode changed to Abandoned Zone |
| 2007-07-04 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1992-09-17 | Perforation | 640.00 | 641.50 | 26 |
| 1994-08-30 | Perforation | 630.30 | 632.30 | 13 |
| 1994-09-03 | Fracture | 630.30 | 632.30 | 0 |
| 2001-02-12 | Packing Device Capped w/Cement | 624.00 | 632.00 | 0 |
| 2001-02-12 | Perforation | 579.00 | 582.00 | 20 |
| 2007-06-28 | Cement Squeeze | 579.00 | 582.00 | 0 |
| 2007-07-04 | Perforation | 588.00 | 590.20 | 20 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2001 | 3965 | 0.0 | 0.0 | 0.0 |
| 2002 | 7781 | 0.0 | 0.0 | 0.0 |
| 2003 | 8566 | 0.0 | 0.0 | 0.0 |
| 2004 | 8678 | 0.0 | 0.0 | 0.0 |
| 2005 | 8662 | 0.0 | 0.0 | 0.0 |
| 2006 | 4984 | 0.0 | 0.0 | 0.0 |
For data sources see[5]