X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424032316020

Well Details

Well ID: 0424032316020
Loading map...
Location: 02/16-23-042-03W4/0
Location Alias: 02/16-23-42-03 W4M
Location Alias 2: 02/16-23-042-03 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 03
Section: 23
County/Municipality: Municipal District of Wainwright No. 61
Well Name: CDN ROXY TRIWEB CHAUVS 16D-23-42-3
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0118722
License Date: 1985-10-30
License Status: Issued
Spud Date: 1985-11-01
Final Drill Date: 1985-11-05
Well Total Depth: 715.00 m
Surface Hole Latitude: 52.636741
Surface Hole Longitude: -110.318783

For data sources see[1][2]

Well History

Date Event
1985-10-30 Obtained License
1985-11-02 Surface Casing Operation Performed
1985-11-05 Finished Drilling
1985-11-05 Well Log Performed
1985-11-05 Well Mode changed to Drilled and Cased
1985-11-06 Well Log Performed
1985-11-07 Drill Stem Test Performed
1985-11-08 Production Casing Operation Performed
1985-11-08 Rig Released
1985-11-19 Well Log Performed
1985-11-20 Well Log Performed
1985-11-21 Perforation Treatment Performed - Jet Perforation
1985-12-01 Well Began Production
1985-12-01 Well Fluid changed to Crude Oil
1985-12-01 Well Mode changed to Pumping
1987-12-11 Well Log Performed
1987-12-12 Perforation Treatment Performed - Jet Perforation
1991-03-20 Well Log Performed
1991-03-22 Well Log Performed
1991-03-23 Perforation Treatment Performed - Jet Perforation
1991-03-23 Perforation Treatment Performed - Remedial Casing
1991-03-24 Perforation Treatment Performed - Jet Perforation
1991-03-24 Perforation Treatment Performed - Remedial Casing
1999-12-14 Perforation Treatment Performed - Jet Perforation
1999-12-14 Well Log Performed
1999-12-16 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-11-21 Perforation 643.00 645.00 13
1987-12-12 Perforation 645.00 646.50 26
1991-03-23 Perforation 249.00 250.00 14
1991-03-23 Remedial Casing Cementing 249.00 250.00 0
1991-03-24 Perforation 204.00 205.00 14
1991-03-24 Remedial Casing Cementing 204.00 205.00 0
1999-12-14 Perforation 634.00 637.00 13
1999-12-16 Fracture 634.00 637.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 764 0.0 0.0 0.0
1986 8656 0.0 0.0 0.0
1987 8614 0.0 0.0 0.0
1988 7014 0.0 0.0 0.0
1989 6854 0.0 0.0 0.0
1990 7185 0.0 0.0 0.0
1991 7817 0.0 0.0 0.0
1992 8677 0.0 0.0 0.0
1993 7888 0.0 0.0 0.0
1994 8757 0.0 0.0 0.0
1995 8749 0.0 0.0 0.0
1996 8760 0.0 0.0 0.0
1997 8611 0.0 0.0 0.0
1998 8745 0.0 0.0 0.0
1999 8388 0.0 0.0 0.0
2000 8713 0.0 0.0 0.0
2001 8699 0.0 0.0 0.0
2002 8704 0.0 0.0 0.0
2003 8719 0.0 0.0 0.0
2004 8690 0.0 0.0 0.0
2005 8578 0.0 0.0 0.0
2006 8544 0.0 0.0 0.0
2007 8697 0.0 0.0 0.0
2008 8708 0.0 0.0 0.0
2009 8548 0.0 0.0 0.0
2010 7867 0.0 0.0 0.0
2011 8111 0.0 0.0 0.0
2012 8745 0.0 0.0 0.0
2013 8621 0.0 0.0 0.0
2014 7723 0.0 0.0 0.0
2015 8614 0.0 0.0 0.0
2016 8552 0.0 0.0 0.0
2017 8446 0.0 0.0 0.0
2018 8476 0.0 0.0 0.0
2019 8560 0.0 0.0 0.0
2020 2133 0.0 0.0 0.0

For data sources see[5]

References