X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424023616B02

Well Details

Well ID: 0424023616B02
Loading map...
Location: B0/16-36-042-02W4/2
Location Alias: B0/16-36-42-02 W4M
Location Alias 2: B0/16-36-042-02 W4/02
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 02
Section: 36
County/Municipality: Municipal District of Wainwright No. 61
Well Name: TALISMAN ET AL CHAUVS 16B-36-42-2
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0137571
License Date: 1988-12-08
License Status: Issued
Spud Date: 1988-12-13
Final Drill Date: 1988-12-15
Well Total Depth: 653.50 m
Surface Hole Latitude: 52.664595
Surface Hole Longitude: -110.153374

For data sources see[1][2]

Well History

Date Event
1988-12-08 Obtained License
1988-12-14 Surface Casing Operation Performed
1988-12-15 Finished Drilling
1988-12-15 Production Casing Operation Performed
1988-12-15 Rig Released
1988-12-15 Well Mode changed to Drilled and Cased
1988-12-17 Well Log Performed
1988-12-29 Perforation Treatment Performed - Jet Perforation
1988-12-29 Well Log Performed
1989-03-10 Perforation Treatment Performed - Cement Squeeze
1989-03-10 Plug Back Performed
1989-03-14 Perforation Treatment Performed - Fractured
1989-03-14 Perforation Treatment Performed - Jet Perforation
1989-03-14 Well Began Production
1989-03-14 Well Fluid changed to Crude Oil
1989-03-14 Well Log Performed
1989-03-14 Well Mode changed to Pumping
1995-04-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-04-22 Perforation Treatment Performed - Jet Perforation
1995-04-22 Well Log Performed
1995-04-23 Well Fluid changed to Crude Oil
1995-04-23 Well Log Performed
1995-04-23 Well Mode changed to Suspended
1995-06-27 Well Began Injection
1995-06-27 Well Fluid changed to Water
1995-06-27 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-12-29 Perforation 620.00 620.50 13
1989-03-10 Cement Squeeze 620.00 620.50 0
1989-03-14 Perforation 641.00 644.00 13
1989-03-14 Fracture 641.00 644.00 0
1995-04-22 Packing Device Capped w/Cement 632.00 640.00 0
1995-04-22 Perforation 619.50 623.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 6586 0.0 0.0 0.0
1990 8738 0.0 0.0 0.0
1991 6457 0.0 0.0 0.0
1992 6526 0.0 0.0 0.0
1993 1395 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References