If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0424023406002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.658688,"lon":-110.213374,"icon":""}]} |
Location: 00/06-34-042-02W4/2 | |
Location Alias: 00/06-34-42-02 W4M | |
Location Alias 2: 00/06-34-042-02 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 4 | |
Range: 02 | |
Section: 34 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: TALISMAN CHAUVS 6-34-42-2 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0007493 | |
License Date: 1953-12-18 | |
License Status: Abandoned | |
Spud Date: 1953-12-23 | |
Final Drill Date: 1953-12-26 | |
Well Total Depth: 693.40 m | |
Surface Hole Latitude: 52.658688 | |
Surface Hole Longitude: -110.213374 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1953-12-18 | Obtained License |
1953-12-26 | Finished Drilling |
1953-12-26 | Well Mode changed to Drilled and Cased |
1953-12-28 | Production Casing Operation Performed |
1954-02-19 | Perforation Treatment Performed - Bullet Perforation |
1954-02-20 | Perforation Treatment Performed - Bullet Perforation |
1954-02-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1954-02-23 | Perforation Treatment Performed - Jet Perforation |
1987-12-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-12-01 | Perforation Treatment Performed - Jet Perforation |
1987-12-01 | Plug Back Performed |
1987-12-01 | Well Log Performed |
1988-06-02 | Well Began Production |
1988-06-02 | Well Fluid changed to Water |
1988-06-02 | Well Type changed to Source |
1996-08-03 | Perforation Treatment Performed - Cement Squeeze |
1996-08-03 | Plug Back Performed |
1996-08-09 | Perforation Treatment Performed - Jet Perforation |
1996-11-30 | Well Fluid changed to Water |
1996-11-30 | Well Mode changed to Suspended |
1996-11-30 | Well Type changed to Source |
2002-01-02 | Well Fluid changed to Water |
2002-01-02 | Well Type changed to Source |
2010-02-01 | Well Fluid changed to Water |
2010-02-01 | Well Mode changed to Suspended |
2010-02-01 | Well Type changed to Source |
2011-12-08 | Well Log Performed |
2017-03-12 | Perforation Treatment Performed - Cement Plug |
2017-03-12 | Plug Back Performed |
2017-03-12 | Well Fluid changed to Water |
2017-03-12 | Well Mode changed to Abandoned Zone |
2017-03-12 | Well Type changed to Source |
2017-03-13 | Perforation Treatment Performed - Cement Plug |
2017-03-13 | Perforation Treatment Performed - Jet Perforation |
2017-03-13 | Perforation Treatment Performed - Remedial Casing |
2017-03-13 | Plug Back Performed |
2017-04-06 | Well Abandoned |
2017-04-06 | Well Fluid changed to Water |
2017-04-06 | Well Mode changed to Abandoned |
2017-04-06 | Well Type changed to Source |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1954-02-19 | Bullet Perforation | 664.80 | 666.60 | 13 |
2017-03-13 | Perforation | 255.00 | 256.00 | 13 |
2017-03-13 | Cement Plug | 192.00 | 272.00 | 0 |
2017-03-13 | Remedial Casing Cementing | 255.00 | 256.00 | 0 |
1954-02-20 | Bullet Perforation | 661.70 | 663.50 | 13 |
1954-02-23 | Packing Device Capped w/Cement | 659.90 | 659.90 | 0 |
1954-02-23 | Perforation | 655.30 | 657.10 | 13 |
1987-12-01 | Packing Device Capped w/Cement | 654.00 | 654.00 | 0 |
1987-12-01 | Perforation | 630.80 | 638.30 | 13 |
1996-08-03 | Cement Squeeze | 630.50 | 638.30 | 0 |
1996-08-09 | Perforation | 636.00 | 637.80 | 18 |
2017-03-12 | Cement Plug | 432.00 | 673.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1988 | 0 | 0.0 | 0.0 | 0.0 |
1989 | 1319 | 0.0 | 0.0 | 0.0 |
1990 | 3701 | 0.0 | 0.0 | 0.0 |
1991 | 868 | 0.0 | 0.0 | 0.0 |
1992 | 0 | 0.0 | 0.0 | 0.0 |
1993 | 0 | 0.0 | 0.0 | 0.0 |
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
2002 | 1641 | 0.0 | 0.0 | 0.0 |
2003 | 8570 | 0.0 | 0.0 | 0.0 |
2004 | 8783 | 0.0 | 0.0 | 0.0 |
2005 | 5964 | 0.0 | 0.0 | 0.0 |
2006 | 4730 | 0.0 | 0.0 | 0.0 |
2007 | 5652 | 0.0 | 0.0 | 0.0 |
2008 | 7628 | 0.0 | 0.0 | 0.0 |
2009 | 1808 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-03-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]