X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424023306030

Well Details

Well ID: 0424023306030
Loading map...
Location: 03/06-33-042-02W4/0
Location Alias: 03/06-33-42-02 W4M
Location Alias 2: 03/06-33-042-02 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 02
Section: 33
County/Municipality: Municipal District of Wainwright No. 61
Well Name: TALISMAN 6A CHAUVS 6-33-42-2
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0199167
License Date: 1997-03-10
License Status: Issued
Spud Date: 1997-06-06
Final Drill Date: 1997-06-08
Well Total Depth: 752.00 m
Surface Hole Latitude: 52.656695
Surface Hole Longitude: -110.232094

For data sources see[1][2]

Well History

Date Event
1997-03-10 Obtained License
1997-06-07 Direction Drilling Operation Performed - Deviate
1997-06-07 Surface Casing Operation Performed
1997-06-08 Finished Drilling
1997-06-08 Well Mode changed to Drilled and Cased
1997-06-09 Production Casing Operation Performed
1997-06-09 Rig Released
1997-06-09 Well Log Performed
1997-06-14 Well Log Performed
1997-06-15 Perforation Treatment Performed - Jet Perforation
1997-06-19 Perforation Treatment Performed - Fractured
1997-07-04 Perforation Treatment Performed - Jet Perforation
1997-07-04 Well Log Performed
1997-07-09 Well Began Production
1997-07-09 Well Fluid changed to Crude Oil
1997-07-09 Well Mode changed to Pumping
1997-07-16 Well Log Performed
2006-06-29 Perforation Treatment Performed - Jet Perforation
2006-06-29 Well Log Performed
2009-11-01 Well Fluid changed to Crude Oil
2009-11-01 Well Mode changed to Suspended
2010-01-26 Well Fluid changed to Crude Oil
2010-01-26 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-06-07 150.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-06-15 Perforation 735.00 739.00 13
1997-06-15 Perforation 726.70 729.70 13
1997-06-19 Fracture 726.70 739.00 0
1997-07-04 Perforation 715.00 718.00 13
2006-06-29 Perforation 708.00 711.70 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 4215 0.0 0.0 0.0
1998 8701 0.0 0.0 0.0
1999 8422 0.0 0.0 0.0
2000 8594 0.0 0.0 0.0
2001 8685 0.0 0.0 0.0
2002 8231 0.0 0.0 0.0
2003 8747 0.0 0.0 0.0
2004 8175 0.0 0.0 0.0
2005 7021 0.0 0.0 0.0
2006 7200 0.0 0.0 0.0
2007 8726 0.0 0.0 0.0
2008 3187 0.0 0.0 0.0
2010 8142 0.0 0.0 0.0
2011 6679 0.0 0.0 0.0
2012 6495 0.0 0.0 0.0
2013 8628 0.0 0.0 0.0
2014 7322 0.0 0.0 0.0
2015 7921 0.0 0.0 0.0
2016 8259 0.0 0.0 0.0
2017 5995 0.0 0.0 0.0
2018 8437 0.0 0.0 0.0
2019 8627 0.0 0.0 0.0
2020 2175 0.0 0.0 0.0

For data sources see[6]

References