X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424022605000

Well Details

Well ID: 0424022605000
Loading map...
Location: 00/05-26-042-02W4/0
Location Alias: 00/05-26-42-02 W4M
Location Alias 2: 00/05-26-042-02 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 02
Section: 26
County/Municipality: Municipal District of Wainwright No. 61
Well Name: BP UNIT 2 CHAUVS 5-26-42-2
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0078919
License Date: 1979-10-30
License Status: Suspension
Spud Date: 1979-11-15
Final Drill Date: 1979-11-19
Well Total Depth: 694.00 m
Surface Hole Latitude: 52.642909
Surface Hole Longitude: -110.193268

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-10-30 Obtained License
1979-11-19 Finished Drilling
1979-11-19 Well Mode changed to Drilled and Cased
1979-11-20 Drill Stem Test Performed
1979-11-21 Production Casing Operation Performed
1979-12-07 Perforation Treatment Performed - Jet Perforation
1979-12-13 Well Began Production
1979-12-13 Well Fluid changed to Crude Oil
1979-12-13 Well Mode changed to Pumping
1994-06-23 Perforation Treatment Performed - Jet Perforation
1998-11-05 Well Fluid changed to Crude Oil
1998-11-05 Well Mode changed to Suspended
2001-04-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-04-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-04-08 Perforation Treatment Performed - Jet Perforation
2001-04-08 Plug Back Performed
2001-04-08 Well Fluid changed to Crude Oil
2001-04-08 Well Log Performed
2001-04-08 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-12-07 Perforation 661.00 665.00 13
1994-06-23 Perforation 682.00 683.50 13
2001-04-07 Packing Device Capped w/Cement 670.00 678.00 0
2001-04-08 Packing Device Capped w/Cement 650.00 658.00 0
2001-04-08 Perforation 601.00 607.00 20
2001-04-08 Perforation 607.00 611.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 7654 0.0 0.0 0.0
1981 8502 0.0 0.0 0.0
1982 7892 0.0 0.0 0.0
1983 8631 0.0 0.0 0.0
1984 8756 0.0 0.0 0.0
1985 8478 0.0 0.0 0.0
1986 8066 0.0 0.0 0.0
1987 8722 0.0 0.0 0.0
1988 8182 0.0 0.0 0.0
1989 7984 0.0 0.0 0.0
1990 8538 0.0 0.0 0.0
1991 8680 0.0 0.0 0.0
1992 8733 0.0 0.0 0.0
1993 8387 0.0 0.0 0.0
1994 8642 0.0 0.0 0.0
1995 8757 0.0 0.0 0.0
1996 8735 0.0 0.0 0.0
1997 7847 0.0 0.0 0.0
1998 492 0.0 0.0 0.0

For data sources see[5]

References