X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424013505002

Well Details

Well ID: 0424013505002
Loading map...
Location: 00/05-35-042-01W4/2
Location Alias: 00/05-35-42-01 W4M
Location Alias 2: 00/05-35-042-01 W4/02
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 01
Section: 35
County/Municipality: Municipal District of Wainwright No. 61
Well Name: MEDCON JOFFRE CHAUVS 5C-35-42-1
Operator Name: Obsidian Energy Ltd.
License Number: 0079650
License Date: 1979-12-03
License Status: RecCertified
Spud Date: 1979-12-09
Final Drill Date: 1979-12-15
Well Total Depth: 658.90 m
Surface Hole Latitude: 52.658442
Surface Hole Longitude: -110.050906

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-12-03 Obtained License
1979-12-10 Lost Circulation Occurred
1979-12-15 Finished Drilling
1979-12-15 Well Mode changed to Drilled and Cased
1979-12-17 Production Casing Operation Performed
1979-12-21 Perforation Treatment Performed - Jet Perforation
1980-02-19 Perforation Treatment Performed - Cement Squeeze
1980-02-19 Perforation Treatment Performed - Jet Perforation
1981-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-10-19 Perforation Treatment Performed - Jet Perforation
1981-10-21 Perforation Treatment Performed - Jet Perforation
1981-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-10-26 Perforation Treatment Performed - Cement Squeeze
1981-10-28 Perforation Treatment Performed - Jet Perforation
1981-11-10 Well Began Production
1981-11-10 Well Fluid changed to Crude Oil
1981-11-10 Well Mode changed to Flowing
1982-09-20 Well Fluid changed to Crude Oil
1982-09-20 Well Mode changed to Pumping
1988-01-01 Well Fluid changed to Crude Oil
1988-01-01 Well Mode changed to Suspended
1993-09-01 Well Fluid changed to Crude Oil
1993-09-01 Well Mode changed to Pumping
1993-10-31 Well Fluid changed to Crude Oil
1993-10-31 Well Mode changed to Suspended
1994-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-09-16 Plug Back Performed
1994-09-25 Well Fluid changed to Crude Oil
1994-09-25 Well Mode changed to Abandoned
1995-04-29 Well Log Performed
1995-06-09 Perforation Treatment Performed - Jet Perforation
1995-06-09 Well Log Performed
1995-06-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-06-12 Perforation Treatment Performed - Remedial Casing
1995-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-08-11 Perforation Treatment Performed - Abrasa-Jet Perforation
1995-08-11 Perforation Treatment Performed - Cement Plug
1995-08-11 Perforation Treatment Performed - Remedial Casing
1995-08-11 Well Log Performed
1995-09-25 Perforation Treatment Performed - Cement Plug
1995-09-25 Perforation Treatment Performed - Jet Perforation
1995-09-25 Perforation Treatment Performed - Remedial Casing
1995-09-25 Well Log Performed
1995-09-29 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-12-21 Perforation 640.00 644.00 13
1981-10-28 Perforation 554.50 556.50 13
1994-09-16 Packing Device Capped w/Cement 525.00 533.00 0
1995-06-09 Perforation 425.00 426.20 13
1995-06-09 Perforation 443.00 444.20 13
1995-06-12 Remedial Casing Cementing 425.00 444.20 0
1995-06-12 Packing Device Capped w/Cement 406.00 439.00 0
1995-08-10 Packing Device Capped w/Cement 394.50 402.50 0
1995-08-11 Hydra Jet Perforation 324.50 324.50 0
1995-08-11 Remedial Casing Cementing 324.50 324.50 0
1995-08-11 Cement Plug 291.40 324.50 0
1980-02-19 Cement Squeeze 640.00 644.00 0
1995-09-25 Perforation 172.00 173.00 13
1995-09-25 Remedial Casing Cementing 172.00 173.00 0
1995-09-25 Cement Plug 155.00 173.00 0
1995-09-25 Perforation 119.00 119.50 13
1995-09-25 Perforation 70.00 70.50 13
1995-09-25 Remedial Casing Cementing 70.00 119.50 0
1995-09-25 Cement Plug 20.00 119.50 0
1980-02-19 Perforation 640.00 644.00 13
1981-10-15 Packing Device Capped w/Cement 625.00 625.00 0
1981-10-19 Perforation 537.30 537.50 13
1981-10-19 Perforation 563.80 564.00 13
1981-10-21 Perforation 558.50 559.50 13
1981-10-26 Acid Treatment 537.30 564.00 0
1981-10-26 Cement Squeeze 537.30 564.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 1464 0.0 0.0 0.0
1982 7508 0.0 0.0 0.0
1983 7759 0.0 0.0 0.0
1984 8313 0.0 0.0 0.0
1985 8274 0.0 0.0 0.0
1986 5854 0.0 0.0 0.0
1987 3634 0.0 0.0 0.0
1993 450 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-12-10 Lost Circulation 41.00 41.00

For data sources see[6]

References