X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424011905000

Well Details

Well ID: 0424011905000
Loading map...
Location: 00/05-19-042-01W4/0
Location Alias: 00/05-19-42-01 W4M
Location Alias 2: 00/05-19-042-01 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 01
Section: 19
County/Municipality: Municipal District of Wainwright No. 61
Well Name: CARDINAL CHAUVINS 5-19-42-1
Operator Name: Cardinal Energy Ltd.
License Number: 0060412
License Date: 1976-09-29
License Status: Suspension
Spud Date: 1976-10-06
Final Drill Date: 1976-10-09
Well Total Depth: 646.20 m
Surface Hole Latitude: 52.629276
Surface Hole Longitude: -110.146795

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-09-29 Obtained License
1976-10-09 Finished Drilling
1976-10-09 Well Mode changed to Drilled and Cased
1976-10-10 Production Casing Operation Performed
1976-10-26 Perforation Treatment Performed - Jet Perforation
1976-11-19 Well Began Production
1976-11-19 Well Fluid changed to Crude Oil
1976-11-19 Well Mode changed to Pumping
1985-02-25 Well Fluid changed to Crude Oil
1985-02-25 Well Mode changed to Suspended
1988-10-01 Well Fluid changed to Crude Oil
1988-10-01 Well Mode changed to Pumping
1997-10-14 Perforation Treatment Performed - Jet Perforation
1997-10-15 Well Log Performed
2003-12-01 Well Fluid changed to Crude Oil
2003-12-01 Well Mode changed to Suspended
2006-08-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-08-05 Perforation Treatment Performed - Jet Perforation
2006-08-05 Plug Back Performed
2006-08-05 Well Fluid changed to Crude Oil
2006-08-05 Well Log Performed
2006-08-05 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-10-26 Perforation 627.90 629.70 13
1997-10-14 Perforation 627.90 629.70 20
2006-08-05 Packing Device Capped w/Cement 610.00 618.00 0
2006-08-05 Perforation 534.00 537.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 520 0.0 0.0 0.0
1977 4873 0.0 0.0 0.0
1978 7600 0.0 0.0 0.0
1979 7914 0.0 0.0 0.0
1980 6120 0.0 0.0 0.0
1988 1762 0.0 0.0 0.0
1989 1060 0.0 0.0 0.0
1990 8359 0.0 0.0 0.0
1991 8351 0.0 0.0 0.0
1992 8638 0.0 0.0 0.0
1993 8429 0.0 0.0 0.0
1994 8625 0.0 0.0 0.0
1995 5443 0.0 0.0 0.0
1996 1055 0.0 0.0 0.0
1997 4392 0.0 0.0 0.0
1998 4164 0.0 0.0 0.0

For data sources see[5]

References