X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415082516000

Well Details

Well ID: 0415082516000
Loading map...
Location: 00/16-25-041-08W5/0
Location Alias: 00/16-25-41-08 W5M
Location Alias 2: 00/16-25-041-08 W5/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 08
Section: 25
County/Municipality: Clearwater County
Well Name: BAYTEX HZ WILLGR 16-25-41-8
Operator Name: Baytex Energy Ltd.
License Number: 0444721
License Date: 2012-03-06
License Status: Issued
Spud Date: 2012-06-30
Final Drill Date: 2012-07-21
Well Total Depth: 3416.00 m
Surface Hole Latitude: 52.551581
Surface Hole Longitude: -115.012281

For data sources see[1][2]

Well History

Date Event
2012-03-06 Obtained License
2012-07-02 Surface Casing Operation Performed
2012-07-06 Direction Drilling Operation Performed - Deviate
2012-07-06 Direction Drilling Operation Performed - Horizontal
2012-07-10 Direction Drilling Operation Performed - Horizontal
2012-07-10 Well Log Performed
2012-07-11 Intermediate Casing Operation Performed
2012-07-21 Finished Drilling
2012-07-21 Well Log Performed
2012-07-21 Well Mode changed to Drilled and Cased
2012-07-23 Liner Casing Operation Performed
2012-07-24 Perforation Treatment Performed - Open-Hole Completion
2012-07-24 Rig Released
2012-08-11 Well Log Performed
2012-08-15 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-16 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-21 Well Log Performed
2012-08-28 Well Began Production
2012-08-28 Well Fluid changed to Crude Oil
2012-08-28 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-06-30 Horizon Drilling Inc. 4 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-07-06 1680.00 Deviate (5 - 79 degrees)
2012-07-06 1696.40 Horizontal
2012-07-10 2025.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-07-24 Open Hole/Barefoot Completion 3412.00 3416.00 0
2012-08-15 Multi-Stage Fracture 3033.00 3410.00 0
2012-08-16 Multi-Stage Fracture 2096.00 2943.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 3160 0.0 0.0 0.0
2013 8094 0.0 0.0 0.0
2014 8260 0.0 0.0 0.0
2015 7461 0.0 0.0 0.0
2016 8424 0.0 0.0 0.0
2017 8162 0.0 0.0 0.0
2018 8628 0.0 0.0 0.0
2019 7985 0.0 0.0 0.0
2020 2162 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-24 No Incident Encountered 0.00 0.00
2012-09-05 No Incident Encountered 0.00 0.00

For data sources see[8]

References