If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0415071616020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.522118,"lon":-114.940117,"icon":""}]} |
Location: 02/16-16-041-07W5/0 | |
Location Alias: 02/16-16-41-07 W5M | |
Location Alias 2: 02/16-16-041-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 5 | |
Range: 07 | |
Section: 16 | |
County/Municipality: Clearwater County | |
Well Name: ANDERSON HZ 102 FERRIER 16-16-41-7 | |
Operator Name: InPlay Oil Corp. | |
License Number: 0434980 | |
License Date: 2011-07-07 | |
License Status: Amended | |
Spud Date: 2011-08-02 | |
Final Drill Date: 2011-08-07 | |
Well Total Depth: 3558.00 m | |
Surface Hole Latitude: 52.522118 | |
Surface Hole Longitude: -114.940117 |
Date | Event |
---|---|
2011-07-07 | Obtained License |
2011-08-05 | Production Casing Operation Performed |
2011-08-05 | Well Log Performed |
2011-08-06 | Well Log Performed |
2011-08-07 | Direction Drilling Operation Performed - Horizontal |
2011-08-07 | Finished Drilling |
2011-08-07 | Well Mode changed to Drilled and Cased |
2011-08-15 | Production Casing Operation Performed |
2011-08-16 | Rig Released |
2011-09-03 | Perforation Treatment Performed - Jet Perforation |
2011-09-06 | Perforation Treatment Performed - Jet Perforation |
2011-09-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-09-07 | Perforation Treatment Performed - Jet Perforation |
2011-09-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-09-13 | Well Log Performed |
2011-09-25 | Well Began Production |
2011-09-25 | Well Fluid changed to Crude Oil |
2011-09-25 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-08-07 | 1622.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-09-03 | Perforation | 3440.00 | 3440.50 | 3 |
2011-09-06 | Multi-Stage Fracture | 3200.00 | 3200.50 | 0 |
2011-09-06 | Multi-Stage Fracture | 3259.00 | 3259.50 | 0 |
2011-09-06 | Multi-Stage Fracture | 3140.00 | 3140.50 | 0 |
2011-09-06 | Multi-Stage Fracture | 3080.00 | 3080.50 | 0 |
2011-09-06 | Perforation | 3020.00 | 3020.50 | 3 |
2011-09-06 | Perforation | 2960.00 | 2960.50 | 3 |
2011-09-06 | Perforation | 2900.00 | 2900.50 | 3 |
2011-09-06 | Perforation | 2840.00 | 2840.50 | 3 |
2011-09-06 | Perforation | 2779.00 | 2779.50 | 3 |
2011-09-06 | Perforation | 2720.00 | 2720.50 | 3 |
2011-09-03 | Perforation | 3380.00 | 3380.50 | 3 |
2011-09-06 | Perforation | 2660.00 | 2660.50 | 3 |
2011-09-07 | Multi-Stage Fracture | 3020.00 | 3020.50 | 0 |
2011-09-07 | Multi-Stage Fracture | 2960.00 | 2960.50 | 0 |
2011-09-07 | Multi-Stage Fracture | 2900.00 | 2900.50 | 0 |
2011-09-07 | Multi-Stage Fracture | 2840.00 | 2840.50 | 0 |
2011-09-07 | Multi-Stage Fracture | 2779.00 | 2779.50 | 0 |
2011-09-07 | Multi-Stage Fracture | 2720.00 | 2720.50 | 0 |
2011-09-07 | Multi-Stage Fracture | 2660.00 | 2660.50 | 0 |
2011-09-07 | Perforation | 2600.00 | 2600.50 | 3 |
2011-09-07 | Perforation | 2540.00 | 2540.50 | 3 |
2011-09-03 | Perforation | 3320.00 | 3320.50 | 3 |
2011-09-07 | Perforation | 2470.00 | 2470.50 | 3 |
2011-09-07 | Perforation | 2410.00 | 2410.50 | 3 |
2011-09-07 | Perforation | 2355.00 | 2355.50 | 3 |
2011-09-07 | Perforation | 2295.00 | 2295.50 | 3 |
2011-09-07 | Perforation | 2230.00 | 2230.50 | 3 |
2011-09-07 | Multi-Stage Fracture | 2600.00 | 2600.50 | 0 |
2011-09-07 | Multi-Stage Fracture | 2540.00 | 2540.50 | 0 |
2011-09-07 | Multi-Stage Fracture | 2470.00 | 2470.50 | 0 |
2011-09-07 | Multi-Stage Fracture | 2410.00 | 2410.50 | 0 |
2011-09-07 | Multi-Stage Fracture | 2355.00 | 2355.50 | 0 |
2011-09-03 | Perforation | 3259.00 | 3259.50 | 3 |
2011-09-07 | Multi-Stage Fracture | 2295.00 | 2295.50 | 0 |
2011-09-07 | Multi-Stage Fracture | 2230.00 | 2230.50 | 0 |
2011-09-03 | Perforation | 3200.00 | 3200.50 | 3 |
2011-09-03 | Perforation | 3140.00 | 3140.50 | 3 |
2011-09-03 | Perforation | 3080.00 | 3080.50 | 3 |
2011-09-06 | Multi-Stage Fracture | 3440.00 | 3440.50 | 0 |
2011-09-06 | Multi-Stage Fracture | 3380.00 | 3380.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1712 | 0.0 | 0.0 | 0.0 |
2012 | 4839 | 0.0 | 0.0 | 0.0 |
2013 | 4613 | 0.0 | 0.0 | 0.0 |
2014 | 4918 | 0.0 | 0.0 | 0.0 |
2015 | 3898 | 0.0 | 0.0 | 0.0 |
2016 | 8671 | 0.0 | 0.0 | 0.0 |
2017 | 8747 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]