X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415070913040

Well Details

Well ID: 0415070913040
Loading map...
Location: 04/13-09-041-07W5/0
Location Alias: 04/13-09-41-07 W5M
Location Alias 2: 04/13-09-041-07 W5/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 07
Section: 09
County/Municipality: Clearwater County
Well Name: YANGARRA HZ WILLGR 13-9-41-7
Operator Name: Yangarra Resources Corp.
License Number: 0487784
License Date: 2018-01-23
License Status: Issued
Spud Date: 2018-01-27
Final Drill Date: 2018-02-06
Well Total Depth: 5301.00 m
Surface Hole Latitude: 52.520545
Surface Hole Longitude: -114.909101

For data sources see[1][2]

Well History

Date Event
2018-01-23 Obtained License
2018-01-28 Surface Casing Operation Performed
2018-01-31 Direction Drilling Operation Performed - Deviate
2018-02-01 Direction Drilling Operation Performed - Horizontal
2018-02-06 Finished Drilling
2018-02-06 Well Log Performed
2018-02-06 Well Mode changed to Drilled and Cased
2018-02-09 Production Casing Operation Performed
2018-02-09 Rig Released
2018-02-14 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-15 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-16 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-17 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-18 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-05 Well Began Production
2018-03-05 Well Fluid changed to Crude Oil
2018-03-05 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-01-27 Trinidad Drilling Ltd. 53 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-01-31 1670.60 Deviate (5 - 79 degrees)
2018-02-01 2193.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-02-14 Multi-Stage Fracture 5252.80 5252.90 0
2018-02-15 Multi-Stage Fracture 5061.80 5061.90 0
2018-02-17 Multi-Stage Fracture 3333.20 3333.30 0
2018-02-17 Multi-Stage Fracture 3314.20 3314.30 0
2018-02-17 Multi-Stage Fracture 3294.80 3294.90 0
2018-02-17 Multi-Stage Fracture 3275.50 3275.60 0
2018-02-17 Multi-Stage Fracture 3256.40 3256.50 0
2018-02-17 Multi-Stage Fracture 3237.20 3237.30 0
2018-02-17 Multi-Stage Fracture 3217.90 3218.00 0
2018-02-17 Multi-Stage Fracture 3199.10 3199.20 0
2018-02-17 Multi-Stage Fracture 3179.80 3179.90 0
2018-02-17 Multi-Stage Fracture 3160.70 3160.80 0
2018-02-15 Multi-Stage Fracture 5042.50 5042.60 0
2018-02-17 Multi-Stage Fracture 3141.80 3141.90 0
2018-02-17 Multi-Stage Fracture 3122.70 3122.80 0
2018-02-17 Multi-Stage Fracture 3103.60 3103.70 0
2018-02-17 Multi-Stage Fracture 3084.20 3084.30 0
2018-02-17 Multi-Stage Fracture 3065.00 3065.10 0
2018-02-17 Multi-Stage Fracture 3045.70 3045.80 0
2018-02-17 Multi-Stage Fracture 3026.30 3026.40 0
2018-02-17 Multi-Stage Fracture 3007.10 3007.20 0
2018-02-17 Multi-Stage Fracture 2987.80 2987.90 0
2018-02-17 Multi-Stage Fracture 2968.50 2968.60 0
2018-02-15 Multi-Stage Fracture 5023.10 5023.20 0
2018-02-17 Multi-Stage Fracture 2949.30 2949.40 0
2018-02-17 Multi-Stage Fracture 2930.00 2930.10 0
2018-02-17 Multi-Stage Fracture 2910.90 2911.00 0
2018-02-17 Multi-Stage Fracture 2891.70 2891.80 0
2018-02-17 Multi-Stage Fracture 2872.40 2872.50 0
2018-02-17 Multi-Stage Fracture 2853.10 2853.20 0
2018-02-17 Multi-Stage Fracture 2833.80 2833.90 0
2018-02-18 Multi-Stage Fracture 2814.90 2815.00 0
2018-02-18 Multi-Stage Fracture 2795.70 2795.80 0
2018-02-18 Multi-Stage Fracture 2776.40 2776.50 0
2018-02-15 Multi-Stage Fracture 5003.90 5004.00 0
2018-02-18 Multi-Stage Fracture 2757.20 2757.30 0
2018-02-18 Multi-Stage Fracture 2737.90 2738.00 0
2018-02-18 Multi-Stage Fracture 2718.60 2718.70 0
2018-02-18 Multi-Stage Fracture 2699.60 2699.70 0
2018-02-18 Multi-Stage Fracture 2680.80 2680.90 0
2018-02-18 Multi-Stage Fracture 2661.60 2661.70 0
2018-02-18 Multi-Stage Fracture 2642.50 2642.60 0
2018-02-18 Multi-Stage Fracture 2623.50 2623.60 0
2018-02-18 Multi-Stage Fracture 2604.20 2604.30 0
2018-02-18 Multi-Stage Fracture 2585.30 2585.40 0
2018-02-15 Multi-Stage Fracture 4984.90 4985.00 0
2018-02-18 Multi-Stage Fracture 2566.10 2566.20 0
2018-02-18 Multi-Stage Fracture 2547.10 2547.20 0
2018-02-18 Multi-Stage Fracture 2528.20 2528.30 0
2018-02-18 Multi-Stage Fracture 2509.00 2509.10 0
2018-02-18 Multi-Stage Fracture 2490.00 2490.10 0
2018-02-18 Multi-Stage Fracture 2470.70 2470.80 0
2018-02-18 Multi-Stage Fracture 2451.60 2451.70 0
2018-02-18 Multi-Stage Fracture 2432.50 2432.60 0
2018-02-18 Multi-Stage Fracture 2413.20 2413.30 0
2018-02-18 Multi-Stage Fracture 2394.10 2394.20 0
2018-02-15 Multi-Stage Fracture 4965.60 4965.70 0
2018-02-18 Multi-Stage Fracture 2374.70 2374.80 0
2018-02-18 Multi-Stage Fracture 2355.50 2355.60 0
2018-02-18 Multi-Stage Fracture 2336.50 2336.60 0
2018-02-18 Multi-Stage Fracture 2317.40 2317.50 0
2018-02-18 Multi-Stage Fracture 2298.00 2298.10 0
2018-02-18 Multi-Stage Fracture 2279.10 2279.20 0
2018-02-18 Multi-Stage Fracture 2260.10 2260.20 0
2018-02-18 Multi-Stage Fracture 2240.80 2240.90 0
2018-02-18 Multi-Stage Fracture 2221.50 2221.60 0
2018-02-15 Multi-Stage Fracture 4946.40 4946.50 0
2018-02-15 Multi-Stage Fracture 4927.10 4927.20 0
2018-02-15 Multi-Stage Fracture 4907.90 4908.00 0
2018-02-15 Multi-Stage Fracture 4888.70 4888.80 0
2018-02-14 Multi-Stage Fracture 5233.70 5233.80 0
2018-02-15 Multi-Stage Fracture 4869.40 4869.50 0
2018-02-15 Multi-Stage Fracture 4850.10 4850.20 0
2018-02-15 Multi-Stage Fracture 4830.80 4830.90 0
2018-02-15 Multi-Stage Fracture 4811.50 4811.60 0
2018-02-15 Multi-Stage Fracture 4792.30 4792.40 0
2018-02-15 Multi-Stage Fracture 4772.80 4772.90 0
2018-02-15 Multi-Stage Fracture 4753.90 4754.00 0
2018-02-15 Multi-Stage Fracture 4734.60 4734.70 0
2018-02-15 Multi-Stage Fracture 4715.20 4715.30 0
2018-02-15 Multi-Stage Fracture 4696.30 4696.40 0
2018-02-14 Multi-Stage Fracture 5214.60 5214.70 0
2018-02-15 Multi-Stage Fracture 4676.90 4677.00 0
2018-02-15 Multi-Stage Fracture 4657.60 4657.70 0
2018-02-15 Multi-Stage Fracture 4638.70 4638.80 0
2018-02-15 Multi-Stage Fracture 4619.50 4619.60 0
2018-02-15 Multi-Stage Fracture 4600.30 4600.40 0
2018-02-15 Multi-Stage Fracture 4580.90 4581.00 0
2018-02-15 Multi-Stage Fracture 4561.80 4561.90 0
2018-02-15 Multi-Stage Fracture 4542.90 4543.00 0
2018-02-16 Multi-Stage Fracture 4523.70 4523.80 0
2018-02-16 Multi-Stage Fracture 4504.80 4504.90 0
2018-02-15 Multi-Stage Fracture 5176.50 5176.60 0
2018-02-16 Multi-Stage Fracture 4485.50 4485.60 0
2018-02-16 Multi-Stage Fracture 4466.40 4466.50 0
2018-02-16 Multi-Stage Fracture 4447.10 4447.20 0
2018-02-16 Multi-Stage Fracture 4427.90 4428.00 0
2018-02-16 Multi-Stage Fracture 4408.50 4408.60 0
2018-02-16 Multi-Stage Fracture 4389.30 4389.40 0
2018-02-16 Multi-Stage Fracture 4370.10 4370.20 0
2018-02-16 Multi-Stage Fracture 4350.80 4350.90 0
2018-02-16 Multi-Stage Fracture 4331.50 4331.60 0
2018-02-16 Multi-Stage Fracture 4312.60 4312.70 0
2018-02-15 Multi-Stage Fracture 5157.20 5157.30 0
2018-02-16 Multi-Stage Fracture 4293.30 4293.40 0
2018-02-16 Multi-Stage Fracture 4274.00 4274.10 0
2018-02-16 Multi-Stage Fracture 4254.90 4255.00 0
2018-02-16 Multi-Stage Fracture 4235.60 4235.70 0
2018-02-16 Multi-Stage Fracture 4216.40 4216.50 0
2018-02-16 Multi-Stage Fracture 4197.10 4197.20 0
2018-02-16 Multi-Stage Fracture 4178.60 4178.70 0
2018-02-16 Multi-Stage Fracture 4159.20 4159.30 0
2018-02-16 Multi-Stage Fracture 4140.30 4140.40 0
2018-02-16 Multi-Stage Fracture 4121.20 4121.30 0
2018-02-15 Multi-Stage Fracture 5138.20 5138.30 0
2018-02-16 Multi-Stage Fracture 4101.90 4102.00 0
2018-02-16 Multi-Stage Fracture 4082.60 4082.70 0
2018-02-16 Multi-Stage Fracture 4063.50 4063.60 0
2018-02-16 Multi-Stage Fracture 4044.30 4044.40 0
2018-02-16 Multi-Stage Fracture 4024.90 4025.00 0
2018-02-16 Multi-Stage Fracture 4005.70 4005.80 0
2018-02-16 Multi-Stage Fracture 3986.50 3986.60 0
2018-02-16 Multi-Stage Fracture 3967.10 3967.20 0
2018-02-16 Multi-Stage Fracture 3948.00 3948.10 0
2018-02-16 Multi-Stage Fracture 3928.80 3928.90 0
2018-02-15 Multi-Stage Fracture 5119.00 5119.10 0
2018-02-16 Multi-Stage Fracture 3909.60 3909.70 0
2018-02-16 Multi-Stage Fracture 3890.30 3890.40 0
2018-02-16 Multi-Stage Fracture 3871.10 3871.20 0
2018-02-16 Multi-Stage Fracture 3852.00 3852.10 0
2018-02-16 Multi-Stage Fracture 3832.70 3832.80 0
2018-02-16 Multi-Stage Fracture 3813.50 3813.60 0
2018-02-16 Multi-Stage Fracture 3794.20 3794.30 0
2018-02-16 Multi-Stage Fracture 3775.00 3775.10 0
2018-02-16 Multi-Stage Fracture 3755.80 3755.90 0
2018-02-16 Multi-Stage Fracture 3736.50 3736.60 0
2018-02-15 Multi-Stage Fracture 5099.80 5099.90 0
2018-02-16 Multi-Stage Fracture 3717.20 3717.30 0
2018-02-17 Multi-Stage Fracture 3697.90 3698.00 0
2018-02-17 Multi-Stage Fracture 3678.70 3678.80 0
2018-02-17 Multi-Stage Fracture 3659.50 3659.60 0
2018-02-17 Multi-Stage Fracture 3640.20 3640.30 0
2018-02-17 Multi-Stage Fracture 3620.90 3621.00 0
2018-02-17 Multi-Stage Fracture 3601.70 3601.80 0
2018-02-17 Multi-Stage Fracture 3582.70 3582.80 0
2018-02-17 Multi-Stage Fracture 3563.50 3563.60 0
2018-02-17 Multi-Stage Fracture 3544.30 3544.40 0
2018-02-15 Multi-Stage Fracture 5080.50 5080.60 0
2018-02-17 Multi-Stage Fracture 3524.90 3525.00 0
2018-02-17 Multi-Stage Fracture 3505.70 3505.80 0
2018-02-17 Multi-Stage Fracture 3486.60 3486.70 0
2018-02-17 Multi-Stage Fracture 3467.20 3467.30 0
2018-02-17 Multi-Stage Fracture 3447.90 3448.00 0
2018-02-17 Multi-Stage Fracture 3428.90 3429.00 0
2018-02-17 Multi-Stage Fracture 3409.90 3410.00 0
2018-02-17 Multi-Stage Fracture 3390.60 3390.70 0
2018-02-17 Multi-Stage Fracture 3371.50 3371.60 0
2018-02-17 Multi-Stage Fracture 3352.50 3352.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-02-14 2018-02-18 2,050 17,976 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 84.2504 N/A
FRAC SAND. 20/40 WHITE (OTTAWA TYPE) BJ Services Crystalline Silica (Quartz) 14808-60-7 100 13.0596 N/A
FRAC SAND. 30/50 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 2.3114 N/A
X-CIDE 450 BJ Services Bactericide/Biocide Glutaraldehyde 111-30-8 100 0.0243 N/A
Methanol 67-56-1 100 0.0243 N/A
Water 7732-18-5 100 0.0243 N/A
CC-2 BJ Services Clay Control Choline chloride 67-48-1 100 0.0677 N/A
Non-hazardous Not Available 100 0.0677 N/A
Water 7732-18-5 100 0.0677 N/A
D-3 BJ Services Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.0507 N/A
Isopropanol 67-63-0 100 0.0507 N/A
Methanol 67-56-1 100 0.0507 N/A
MaxPerm-20A BJ Services Friction Reducer Non-hazardous 9014 100 0.1624 N/A
Oxyalkylated alcohol 9014 100 0.1624 N/A
Petroleum distillates 64742-47-8 100 0.1624 N/A
Polyacrylate 9014 100 0.1624 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-02-14 2018-02-18 Surface Water - Runoff 16859

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 6429 0.0 0.0 0.0
2019 8020 0.0 0.0 0.0
2020 1966 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-02-11 No Incident Encountered 0.00 0.00
2018-03-02 No Incident Encountered 0.00 0.00

For data sources see[10]

References